[2026-05-31] taiga sync: .stfolder/syncthing-folder-940f59.txt work/briefs/daily/2026-05-31.md work/briefs/weekly/plan-2026-05-25.md work/briefs/weekly/plan-2026-06-01.md
This commit is contained in:
Regular → Executable
@@ -1,98 +0,0 @@
|
||||
---
|
||||
## Daily Brief — 2026-05-31
|
||||
|
||||
*Sunday. Light brief — the work week (Mon 6/1 – Fri 6/5) starts tomorrow. Today's focus per weekly plan: rest / preview. New signals since Friday: 1 task changed (Warn Before Quit pixels — bot reminder, already on next week's AOR list), 1 new comment, 0 PR state changes.*
|
||||
|
||||
### ✨ Morning
|
||||
|
||||
On this day in **1859**, the Great Bell at Westminster — nicknamed *Big Ben* — chimed for the very first time. The original 16-ton bell cracked within months under the hammer; the replacement (still cracked, just gently) has been keeping London's time for 166 years. Even icons get the v2 patch eventually.
|
||||
|
||||
🌿 Sunday — step outside for 5 minutes before opening anything work-related.
|
||||
|
||||
---
|
||||
|
||||
## Plan for Today
|
||||
|
||||
It's Sunday. Suggested shape: light. If you want to touch one thing, pick the easy win.
|
||||
|
||||
1. ⚡ **Confirm [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) is merged** — PR #5149 is ✅ approved; one-click check on GitHub, then mark the Asana task complete. (≤5 min.)
|
||||
2. 📋 **Preview tomorrow's shape** — see [weekly plan-2026-06-01](https://app.asana.com/0/0/1215009192158950): incoming TP is *Persist 'You've got this' dialogue*; 3 carry-over PRs need to land (Treatment B CI red, "Stop chat" awaiting review, Monterrey-only PR is the Big Sur project blocker that closes Mon).
|
||||
|
||||
Everything else can wait for Monday.
|
||||
|
||||
---
|
||||
|
||||
### 🔴 Urgent / Overdue
|
||||
|
||||
All five are last-week carry-overs. Nothing moved Saturday — all of these are Monday's first stack.
|
||||
|
||||
- **[OVERDUE] [DRI] — [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)**
|
||||
Context: PR #5145 CI is 🔴. Due 5/28, overdue 3d. De-facto TP carry from last week — blocks the iOS Duck.ai onboarding ship.
|
||||
Action (Mon): diagnose CI failure, push fix, re-request review.
|
||||
|
||||
- **[OVERDUE] [DRI] — [Hide "stop chat" button in input box [0.5d]](https://app.asana.com/0/0/1215009192158954)**
|
||||
Context: PR #5173 ✅ CI, waiting on reviewer. Due 5/29, overdue 2d.
|
||||
Action (Mon): post "ready for review, can you take a look?" ping in PR thread.
|
||||
|
||||
- **[OVERDUE] [DRI] — [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)**
|
||||
Context: Parent "Drop Big Sur" project closes Mon 6/1 per Diego. Alex's PR is the merge-blocker. Due 5/27, overdue 4d.
|
||||
Action (Mon, first thing): land the PR or escalate to Diego with concrete blocker.
|
||||
|
||||
- **[OVERDUE] [DRI] — [Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
|
||||
Context: PR #4663 draft, ✅ CI, waiting review. macOS Release Board follow-up. Due 5/28, overdue 3d.
|
||||
Action (Mon): decide — push to land this week, or formally defer (comment + new due date).
|
||||
|
||||
- **[OVERDUE] [DRI] — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
|
||||
Context: anonymous 5-min timeboxed survey. Due 5/26, overdue 5d.
|
||||
Action (Mon): fill it in (5 min, no thinking required).
|
||||
|
||||
**Backlog cluster** (informational, not action): 7 inbox/planning items overdue >30d — *Pinned tab opens link in background tab* (5/1), *Text selection in address bar* (5/1), *PR Check failing on main* (4/22), *PR Check failing on main* (5/15), *Review Overdue Tasks Summary - 22 Tasks* (1/27), *Assertion Failure Pixel Anomaly 2025/09/15*, *Bug: Tab preview stuck around* (2025-04-15). These live in next week's Sprint Backlog — don't surface daily.
|
||||
|
||||
---
|
||||
|
||||
### 🟠 Needs Action Today
|
||||
|
||||
None on Sunday.
|
||||
|
||||
**Monday heads-up — PR Reviews queue**: 11 GitHub items waiting on Alex (6 review-requested, 5 mentions across `apple-browsers` and `privacy-configuration`). Batch after the TP block, not as a first-thing distraction.
|
||||
|
||||
---
|
||||
|
||||
### 🟡 Delegated — Follow Up Needed
|
||||
|
||||
- **[OVERDUE] — [Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — Jake Abel
|
||||
Due 5/21, no activity since 5/20. 10d overdue. The parent task is [ON HOLD] so the triage may be moot — but the open Asana task is misleading.
|
||||
Suggest: comment on task: "Jake — parent is on hold. Should this triage close, or stay open for when the project resumes?"
|
||||
|
||||
- **[OVERDUE] — [Localization - 2-5 days](https://app.asana.com/0/0/1214147157456477)** — unassigned
|
||||
Due 4/28. 33d overdue and **no assignee**. Stale since 4/21.
|
||||
Suggest: either assign to a localization owner or close with reason.
|
||||
|
||||
- **[STALE] — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields](https://app.asana.com/0/0/1207521936429896)**
|
||||
75d no activity, no matching GitHub PR found.
|
||||
Suggest: check if work was abandoned; close or reassign.
|
||||
|
||||
- **[STALE] — [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177)** — Deepankar
|
||||
No activity since 2025-12-08. Was due 2025-11-17.
|
||||
Suggest: "Deepankar — is this still active? If not, can we close?"
|
||||
|
||||
(Other ~110 open delegated items have no due date and no fresh signal — defer to weekly review.)
|
||||
|
||||
No "PR merged but Asana task still open" matches in the snapshot — nothing to close from delegated GitHub.
|
||||
|
||||
---
|
||||
|
||||
### 🔵 Rhythms
|
||||
|
||||
**TP**: Last week's TP was [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — **incomplete, carries forward** as a blocker (PR #5145 CI red). Incoming week's TP per the plan: [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950), due Mon 6/1. Set it Monday morning.
|
||||
|
||||
**Next TP Thread**: not yet — outgoing TP (Treatment B) is not at "close to completion" while CI is red. No thread to open this morning.
|
||||
|
||||
**Upcoming this week (6/1 – 6/5)**:
|
||||
- **1:1 with Dominik — CANCELLED** all week (Dominik OOO: LDX3 Mon–Wed, public holiday Thu–Fri). Next realistic 1:1: week of 6/15. Do not raise the agenda — keep collecting.
|
||||
- Standing meetings: O-L Weekly Mon, Apple Weekly Tue, O-N Weekly Wed.
|
||||
- **AFK prep**: WWDC partly-AFK starts Mon 6/8 — 8 days out. Handoff window opens this week; nothing urgent yet, but flag in-flight items at Tue's team meeting.
|
||||
- Career slot: 30-min Project Advisor Readiness doc Part 1 — Thu 6/4 (uses the freed 1:1 slot).
|
||||
- No active rotation.
|
||||
|
||||
---
|
||||
@@ -1,146 +0,0 @@
|
||||
# Weekly Plan — Week of 2026-06-01
|
||||
|
||||
**Top Priority**: [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due Monday 6/1, next concrete deliverable in the iOS Duck.ai onboarding shipping push, already queued in `top_priority` section. Land the 3 in-flight onboarding PRs first, then deliver this, then start the broader Address-Onboarding-Conflicts integration work (due Fri 6/5).
|
||||
|
||||
> Note: weekly review file `2026-05-29.md` does not exist — plan is built from DB snapshot only. Dominik (career advisor) is OOO the entire week (LDX3 Jun 1-3, Public Holiday Jun 4-5) — **1:1 cancelled this week**. Earliest realistic next 1:1 is week of 6/15 (Alex partly AFK 6/8-12 for WWDC).
|
||||
|
||||
### Quadrants
|
||||
|
||||
| Quadrant | This Week | Notes |
|
||||
|---|---|---|
|
||||
| Project | 70% | iOS Duck.ai onboarding shipping — 3 PRs to land + Persist dialogue + Address-Onboarding-Conflicts. Heavy delivery week, Friday hard deadline. |
|
||||
| AOR | 15% | Light — landing the macOS Monterrey-only PR (Big Sur project closes 6/1) + 1–2 overdue inbox bugs in gaps. |
|
||||
| Career | 10% | No 1:1 (Dominik OOO). Use freed time for Project Advisor doc Part 1 — clearest EP3 lever. |
|
||||
| Strategy | 5% | One substantive comment on Windows AOT delivery plan discussion (Alex already engaged). |
|
||||
|
||||
Tradeoff: Project at 70% (above 60% baseline) justified by Fri 6/5 deadline and 3 PRs already overdue from last week.
|
||||
|
||||
### Shape
|
||||
|
||||
**Mon 6/1:** Land in-flight iOS PRs + start Persist dialogue
|
||||
- [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) — PR #5149 ✅ approved → confirm merge
|
||||
- [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — PR #5145 🔴 CI failing → fix CI, re-request review
|
||||
- [Hide "stop chat" button in input box](https://app.asana.com/0/0/1215009192158954) — PR #5173 ✅ → poke reviewer
|
||||
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — start implementation
|
||||
- [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916) — wrap, project closes today
|
||||
- O-L Weekly Meeting
|
||||
|
||||
**Tue 6/2:** Persist dialogue implementation
|
||||
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — finish implementation, open PR
|
||||
- Apple Weekly Team Meeting
|
||||
- 1:1 Dominik **— CANCELLED** (OOO LDX3)
|
||||
|
||||
**Wed 6/3:** Persist dialogue ship + Address-Onboarding-Conflicts kick-off
|
||||
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — review, merge
|
||||
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — scope review, start work
|
||||
- O-N Weekly Meeting
|
||||
|
||||
**Thu 6/4:** Address-Onboarding-Conflicts deep work
|
||||
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — implementation push
|
||||
- Career: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) (30 min)
|
||||
|
||||
**Fri 6/5:** Wrap + weekly review
|
||||
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — ship target
|
||||
- Weekly review write-up
|
||||
- (No 1:1 prep — Dominik out through 6/15+)
|
||||
|
||||
### Must-Not-Forget
|
||||
|
||||
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
due 2026-05-28 (overdue 3d) — PR #5145 CI is RED. Alex is DRI; nobody else will fix the CI. Blocks ship of Treatment B winner.
|
||||
|
||||
- [ ] **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
|
||||
due 2026-05-28 (overdue 3d) — PR #5149 is ✅ approved; confirm merge state and close the task.
|
||||
|
||||
- [ ] **[Hide "stop chat" button in input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
|
||||
due 2026-05-29 (overdue 2d) — PR #5173 ✅ CI but waiting review. Ping reviewer Monday.
|
||||
|
||||
- [ ] **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
|
||||
due 2026-06-05 — top_priority integration work. Alex is DRI, hard end-of-week deadline.
|
||||
|
||||
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
|
||||
due 2026-05-27 (overdue 4d) — Parent "Drop Big Sur" project closes today 6/1 per Diego's comment. Alex's PR is the merge-blocker.
|
||||
|
||||
### AOR Quick Wins This Week
|
||||
|
||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||
overdue 38 days — feature flag removal. Pairs with the pixels task below.
|
||||
|
||||
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
|
||||
overdue 2 days — yesterday's bot comment: "This pixel is overdue for removal, please prepare a PR." 30-min task.
|
||||
|
||||
- **[Confirm defaultValue for popupBlocking migration](https://app.asana.com/0/0/1214004917427136)**
|
||||
inbox, stale 52d — single yes/no confirmation, quick to clear.
|
||||
|
||||
### Sprint Backlog (pick 1–2 if time allows)
|
||||
|
||||
- **[PR Check failing on main - testWhenTabWithConnectionLostError...](https://app.asana.com/0/0/1213975496167929)**
|
||||
due 2026-04-22 (39d overdue) — flaky/failing test, blocks CI greenness.
|
||||
|
||||
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
||||
due 2026-05-01 (30d overdue) — Internal Product Feedback. Investigation task.
|
||||
|
||||
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
|
||||
due 2026-05-01 (30d overdue) — Internal Product Feedback.
|
||||
|
||||
- **[PR Check is failing on main (May 15)](https://app.asana.com/0/0/1214797526093576)**
|
||||
due 2026-05-15 (16d overdue) — Apple CI Failing Tests.
|
||||
|
||||
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
|
||||
due 2026-01-27 (124d overdue) — meta triage task.
|
||||
|
||||
(+ 3 aged items >180 days in backlog — not listed)
|
||||
|
||||
### On Radar
|
||||
|
||||
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)** — Alex commented twice (5/30) objecting to parallel project / different DRI vs. his draft plan. Ivy responded "your plan is the foundation." Ivy plans Mon/Tue kick-off. **Engage** when Ivy posts.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged that macOS is no longer sending `site_loading_performance` pixel (5/30). Touches Alex's macOS browser AOR. **Monitor**.
|
||||
|
||||
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: project closes today 6/1; Monterey+ ships publicly 6/15. **Monitor.**
|
||||
|
||||
### Career Action This Week
|
||||
**[Draft Part 1 of Advisor Readiness doc (30 min)](https://app.asana.com/0/0/1210386994396212)**
|
||||
|
||||
Picked from career-notes.md priority order:
|
||||
1. ✅ **Project Advisor (Not started)** — picked. Highest leverage for EP3.
|
||||
2. ❌ Primary AOR discussion — no 1:1 this week (Dominik OOO).
|
||||
3. ❌ Calibration follow-up with Christie — defer to 1:1 once Dominik returns.
|
||||
4. ❌ Assessment visibility — no urgent open Assessment.
|
||||
5. ❌ 1:1 career prep — 1:1 cancelled.
|
||||
|
||||
Time-box: 30 min. Use the slot that would have been 1:1 prep.
|
||||
|
||||
### On Radar / Participation Needed
|
||||
|
||||
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
|
||||
Alex raised concerns about parallel project / DRI split (5/30). Ivy responded "your plan is the foundation." Ivy plans Mon/Tue kick-off. — **engage** when Ivy posts.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
|
||||
Elle: macOS `site_loading_performance` pixel missing. Directly touches Alex's macOS browser AOR. — **monitor**.
|
||||
|
||||
### Carried Forward from Last Week
|
||||
|
||||
- **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
→ see TP section above.
|
||||
|
||||
- **[Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
|
||||
→ see TP section above.
|
||||
|
||||
- **[Hide "stop chat" button in input box](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
|
||||
→ see TP section above.
|
||||
|
||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — assignee: Alex (following)
|
||||
Active agenda task. Continue collecting items (Project Advisor progress, primary AOR target, Christie's EP2/3 calibration). **Do not** raise this week — Dominik OOO. Next likely window: week of 6/15.
|
||||
|
||||
- **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
|
||||
Parent "Drop Big Sur" project closes today 6/1. Get this merged or escalate.
|
||||
|
||||
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — assignee: Alex
|
||||
due 2026-05-28 (3d overdue). PR #4663 draft, ✅ CI, waiting review. Decide: push to land or formally defer.
|
||||
|
||||
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
|
||||
Async coordination task tied to [ON HOLD] iOS Demo project. Confirm whether still active or close.
|
||||
|
||||
---
|
||||
*Based on DB state as of 2026-05-31 (Sun); weekly review file 2026-05-29.md not present. Sync freshness: 2026-05-31 01:14 UTC. Plan covers Mon 2026-06-01 through Fri 2026-06-05. Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-06-01.md` (user-provided MONDAY_DATE=2026-05-25 appeared to be a typo for 2026-06-01 — flag if otherwise).*
|
||||
@@ -1,149 +0,0 @@
|
||||
# Weekly Plan — Week of 2026-06-01
|
||||
|
||||
**Top Priority**: [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due Monday 6/1, next concrete deliverable in the iOS Duck.ai onboarding shipping push, already queued in `top_priority` section. Land the 3 in-flight onboarding PRs first, then deliver this, then start the broader Address-Onboarding-Conflicts integration work (due Fri 6/5).
|
||||
|
||||
> Note: weekly review file `2026-05-29.md` does not exist — plan is built from DB snapshot only. Dominik (career advisor) is OOO the entire week (LDX3 Jun 1-3, Public Holiday Jun 4-5) — **1:1 cancelled this week**. Earliest realistic next 1:1 is week of 6/15 (Alex partly AFK 6/8-12 for WWDC).
|
||||
|
||||
### Quadrants
|
||||
|
||||
| Quadrant | This Week | Notes |
|
||||
|---|---|---|
|
||||
| Project | 70% | iOS Duck.ai onboarding shipping — 3 PRs to land + Persist dialogue + Address-Onboarding-Conflicts. Heavy delivery week, Friday hard deadline. |
|
||||
| AOR | 15% | Light — landing the macOS Monterrey-only PR (Big Sur project closes 6/1) + 1–2 overdue inbox bugs in gaps. |
|
||||
| Career | 10% | No 1:1 (Dominik OOO). Use freed time for Project Advisor doc Part 1 — clearest EP3 lever. |
|
||||
| Strategy | 5% | One substantive comment on Windows AOT delivery plan discussion (Alex already engaged). |
|
||||
|
||||
Tradeoff note: Project at 70% (above 60% baseline) is justified by the Fri 6/5 deadline on Address-Onboarding-Conflicts and the 3 PRs already overdue from last week.
|
||||
|
||||
### Shape
|
||||
|
||||
**Mon 6/1:** Land in-flight iOS PRs + start Persist dialogue
|
||||
- [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) — PR #5149 ✅ approved → confirm merge
|
||||
- [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — PR #5145 🔴 CI failing → fix CI, re-request review
|
||||
- [Hide "stop chat" button in input box](https://app.asana.com/0/0/1215009192158954) — PR #5173 ✅ → poke reviewer
|
||||
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — start implementation
|
||||
- [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916) — wrap, project closes today
|
||||
- O-L Weekly Meeting
|
||||
|
||||
**Tue 6/2:** Persist dialogue implementation
|
||||
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — finish implementation, open PR
|
||||
- Apple Weekly Team Meeting
|
||||
- 1:1 Dominik **— CANCELLED** (OOO LDX3)
|
||||
|
||||
**Wed 6/3:** Persist dialogue ship + Address-Onboarding-Conflicts kick-off
|
||||
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — review, merge
|
||||
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — scope review, start work
|
||||
- O-N Weekly Meeting
|
||||
|
||||
**Thu 6/4:** Address-Onboarding-Conflicts deep work
|
||||
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — implementation push
|
||||
- Career: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) (30 min)
|
||||
|
||||
**Fri 6/5:** Wrap + weekly review
|
||||
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — ship target
|
||||
- Weekly review write-up
|
||||
- (No 1:1 prep — Dominik out through 6/15+)
|
||||
|
||||
### Must-Not-Forget
|
||||
|
||||
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
due 2026-05-28 (overdue 3d) — PR #5145 CI is RED. Alex is DRI; nobody else will fix the CI for him. Blocks ship of Treatment B winner.
|
||||
|
||||
- [ ] **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
|
||||
due 2026-05-28 (overdue 3d) — PR #5149 is ✅ approved; confirm merge state and close the task. Quick win, but visibility — top_priority section.
|
||||
|
||||
- [ ] **[Hide "stop chat" button in input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
|
||||
due 2026-05-29 (overdue 2d) — PR #5173 ✅ CI but waiting review. Ping reviewer Monday — Alex is the only one who can unstick this.
|
||||
|
||||
- [ ] **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
|
||||
due 2026-06-05 — top_priority integration work. Alex is DRI, hard end-of-week deadline.
|
||||
|
||||
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
|
||||
due 2026-05-27 (overdue 4d) — Parent "Drop Big Sur" project closes today (Mon 6/1) per Diego's comment. Alex's PR is the merge-blocker.
|
||||
|
||||
### AOR Quick Wins This Week
|
||||
<!-- Quick-actionable overdue tasks (<2h each): feature flags, pixel cleanup, config changes. -->
|
||||
|
||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||
overdue 38 days — feature flag removal, do_later section. Pairs with the pixels task below.
|
||||
|
||||
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
|
||||
overdue 2 days — yesterday's bot comment: "This pixel is overdue for removal, please prepare a PR." 30-min task.
|
||||
|
||||
- **[Confirm defaultValue for popupBlocking migration](https://app.asana.com/0/0/1214004917427136)**
|
||||
inbox, stale 52d — single yes/no confirmation, blocks no one but quick to clear.
|
||||
|
||||
### Sprint Backlog (pick 1–2 if time allows)
|
||||
<!-- Mid-age overdue assigned tasks (14–180 days). -->
|
||||
|
||||
- **[PR Check failing on main - testWhenTabWithConnectionLostError...](https://app.asana.com/0/0/1213975496167929)**
|
||||
due 2026-04-22 (39d overdue) — active section, flaky/failing test, blocks CI greenness.
|
||||
|
||||
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
||||
due 2026-05-01 (30d overdue) — inbox, Internal Product Feedback. Investigation task.
|
||||
|
||||
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
|
||||
due 2026-05-01 (30d overdue) — inbox, Internal Product Feedback.
|
||||
|
||||
- **[PR Check is failing on main (May 15)](https://app.asana.com/0/0/1214797526093576)**
|
||||
due 2026-05-15 (16d overdue) — inbox, Apple CI Failing Tests.
|
||||
|
||||
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
|
||||
due 2026-01-27 (124d overdue) — planning, meta task; clearing it triages other backlog.
|
||||
|
||||
(+ 3 aged items >180 days in backlog — not listed)
|
||||
|
||||
### On Radar
|
||||
<!-- Non-assigned items that touch Alex's AOR or work. No action required unless directly mentioned. -->
|
||||
|
||||
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)** — Alex already commented twice (5/30) objecting to a parallel project with different DRI vs. his draft plan. Ivy responded that "your plan is the foundation for this." **Engage** — respond when Ivy posts the planned Mon/Tue kick-off.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged that macOS is no longer sending `site_loading_performance` pixel (5/30). Touches Alex's macOS browser AOR. **Monitor** — chime in if Elle asks for macOS-side investigation.
|
||||
|
||||
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: project closes today 6/1; Monterey+ version ships publicly 6/15. Alex's PR (#5150214975916) is part of the closure. **Monitor.**
|
||||
|
||||
### Career Action This Week
|
||||
**[Draft Part 1 of Advisor Readiness doc (30 min)](https://app.asana.com/0/0/1210386994396212)**
|
||||
|
||||
Picked from career-notes.md priority order:
|
||||
1. ✅ **Project Advisor (Not started)** — picked. Highest leverage for EP3.
|
||||
2. ❌ Primary AOR discussion — no 1:1 this week (Dominik OOO).
|
||||
3. ❌ Calibration follow-up with Christie — defer to 1:1 once Dominik returns.
|
||||
4. ❌ Assessment visibility — no urgent open Assessment requiring comment this week.
|
||||
5. ❌ 1:1 career prep — 1:1 cancelled.
|
||||
|
||||
Time-box: 30 min. Use the slot that would have been 1:1 prep. Deliverable: bullet outline of advisor strengths/gaps in `~/obsidian/work/projects/` or attached to task gid `1210386994396212`.
|
||||
|
||||
### On Radar / Participation Needed
|
||||
|
||||
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
|
||||
Alex raised concerns about parallel project / DRI split (5/30). Ivy responded "your plan is the foundation." Ivy plans Mon/Tue kick-off. — **engage** when Ivy posts.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
|
||||
Elle: macOS `site_loading_performance` pixel missing. Directly touches Alex's macOS browser AOR. — **monitor**, jump in if Elle asks for help.
|
||||
|
||||
### Carried Forward from Last Week
|
||||
|
||||
- **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
→ see TP section above (PR #5145 CI red).
|
||||
|
||||
- **[Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
|
||||
→ see TP section above (PR #5149 approved, confirm merge).
|
||||
|
||||
- **[Hide "stop chat" button in input box](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
|
||||
→ see TP section above (PR #5173 awaiting review).
|
||||
|
||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — assignee: Alex (following)
|
||||
Active agenda task. Continue collecting items (Project Advisor progress, primary AOR target, Christie's EP2/3 calibration confirmation). **Do not** raise this week — Dominik OOO. Next likely window: week of 6/15.
|
||||
|
||||
- **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
|
||||
Parent "Drop Big Sur" project closes today 6/1. Get this merged or escalate.
|
||||
|
||||
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — assignee: Alex
|
||||
due 2026-05-28 (3d overdue). PR #4663 is draft, ✅ CI, waiting review. macOS Release Board follow-up. Decide: push to land or formally defer.
|
||||
|
||||
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
|
||||
inbox, no due date. Async coordination task tied to [ON HOLD] iOS Demo project. Confirm whether this is still active or can be closed.
|
||||
|
||||
---
|
||||
*Based on DB state as of 2026-05-31 (Sun); weekly review file 2026-05-29.md not present. Sync freshness: 2026-05-31 01:14 UTC. Plan covers Mon 2026-06-01 through Fri 2026-06-05.*
|
||||
Reference in New Issue
Block a user