Files
obsidian-vault/work/briefs/daily/2026-05-31.md
T

6.1 KiB
Raw Blame History


Daily Brief — 2026-05-31

Sunday. Light brief — the work week (Mon 6/1 Fri 6/5) starts tomorrow. Today's focus per weekly plan: rest / preview. New signals since Friday: 1 task changed (Warn Before Quit pixels — bot reminder, already on next week's AOR list), 1 new comment, 0 PR state changes.

Morning

On this day in 1859, the Great Bell at Westminster — nicknamed Big Ben — chimed for the very first time. The original 16-ton bell cracked within months under the hammer; the replacement (still cracked, just gently) has been keeping London's time for 166 years. Even icons get the v2 patch eventually.

🌿 Sunday — step outside for 5 minutes before opening anything work-related.


Plan for Today

It's Sunday. Suggested shape: light. If you want to touch one thing, pick the easy win.

  1. Confirm Hide Free plan • Upgrade in onboarding is merged — PR #5149 is approved; one-click check on GitHub, then mark the Asana task complete. (≤5 min.)
  2. 📋 Preview tomorrow's shape — see weekly plan-2026-06-01: incoming TP is Persist 'You've got this' dialogue; 3 carry-over PRs need to land (Treatment B CI red, "Stop chat" awaiting review, Monterrey-only PR is the Big Sur project blocker that closes Mon).

Everything else can wait for Monday.


🔴 Urgent / Overdue

All five are last-week carry-overs. Nothing moved Saturday — all of these are Monday's first stack.

  • [OVERDUE] [DRI] — Ship AI onboarding winner (Treatment B) [0.5d] Context: PR #5145 CI is 🔴. Due 5/28, overdue 3d. De-facto TP carry from last week — blocks the iOS Duck.ai onboarding ship. Action (Mon): diagnose CI failure, push fix, re-request review.

  • [OVERDUE] [DRI] — Hide "stop chat" button in input box [0.5d] Context: PR #5173 CI, waiting on reviewer. Due 5/29, overdue 2d. Action (Mon): post "ready for review, can you take a look?" ping in PR thread.

  • [OVERDUE] [DRI] — PR: Make our macOS app Monterrey-only - 1-3d Context: Parent "Drop Big Sur" project closes Mon 6/1 per Diego. Alex's PR is the merge-blocker. Due 5/27, overdue 4d. Action (Mon, first thing): land the PR or escalate to Diego with concrete blocker.

  • [OVERDUE] [DRI] — Follow-up: add support of Inline Text Images to TypingTextAnimation Context: PR #4663 draft, CI, waiting review. macOS Release Board follow-up. Due 5/28, overdue 3d. Action (Mon): decide — push to land this week, or formally defer (comment + new due date).

  • [OVERDUE] [DRI] — Desktop Browser Feature Owner Survey Context: anonymous 5-min timeboxed survey. Due 5/26, overdue 5d. Action (Mon): fill it in (5 min, no thinking required).

Backlog cluster (informational, not action): 7 inbox/planning items overdue >30d — Pinned tab opens link in background tab (5/1), Text selection in address bar (5/1), PR Check failing on main (4/22), PR Check failing on main (5/15), Review Overdue Tasks Summary - 22 Tasks (1/27), Assertion Failure Pixel Anomaly 2025/09/15, Bug: Tab preview stuck around (2025-04-15). These live in next week's Sprint Backlog — don't surface daily.


🟠 Needs Action Today

None on Sunday.

Monday heads-up — PR Reviews queue: 11 GitHub items waiting on Alex (6 review-requested, 5 mentions across apple-browsers and privacy-configuration). Batch after the TP block, not as a first-thing distraction.


🟡 Delegated — Follow Up Needed

(Other ~110 open delegated items have no due date and no fresh signal — defer to weekly review.)

No "PR merged but Asana task still open" matches in the snapshot — nothing to close from delegated GitHub.


🔵 Rhythms

TP: Last week's TP was Ship AI onboarding winner (Treatment B)incomplete, carries forward as a blocker (PR #5145 CI red). Incoming week's TP per the plan: Persist 'You've got this' dialogue [2d], due Mon 6/1. Set it Monday morning.

Next TP Thread: not yet — outgoing TP (Treatment B) is not at "close to completion" while CI is red. No thread to open this morning.

Upcoming this week (6/1 6/5):

  • 1:1 with Dominik — CANCELLED all week (Dominik OOO: LDX3 MonWed, public holiday ThuFri). Next realistic 1:1: week of 6/15. Do not raise the agenda — keep collecting.
  • Standing meetings: O-L Weekly Mon, Apple Weekly Tue, O-N Weekly Wed.
  • AFK prep: WWDC partly-AFK starts Mon 6/8 — 8 days out. Handoff window opens this week; nothing urgent yet, but flag in-flight items at Tue's team meeting.
  • Career slot: 30-min Project Advisor Readiness doc Part 1 — Thu 6/4 (uses the freed 1:1 slot).
  • No active rotation.