Files
obsidian-vault/work/briefs/weekly/plan-2026-05-25.md
T

153 lines
9.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan — Week of 2026-05-25
> Generated Sat 2026-05-30 (no prior weekly-review found for 2026-05-29; plan is built from current DB snapshot and career-notes).
> Shape starts from today; main working week covers Mon 2026-06-01 → Fri 2026-06-05.
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella due 2026-06-05; Ship Review still open and one large subtask ("Persist 'You've got this' [2d]") plus two animated/visual subtasks remain.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 75% | Ship Review week — umbrella due Fri; absorb time normally spent on 1:1 prep. |
| AOR | 15% | Warn Before Quit pixel removal (direct request 2026-05-30), Monterrey-only PR follow-up, CI-failure cleanup if gaps appear. |
| Career | 10% | Dominik OOO all week (Jun 15) → no 1:1, no 1:1 prep. Use the freed time for Project Advisor doc draft (highest-leverage item from career-notes). |
| Strategy | 5% | Light; defer to next week. |
### Shape
**Sat 2026-05-30:** rest / light triage
- Optional: respond to [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy clarified scope after Alex's question
**Sun 2026-05-31:** rest
**Mon 2026-06-01:** Persist dialogue + week kick-off
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — TP subtask, due today
- O-L Weekly Meeting
- Set 1-Must = land Persist dialogue PR
**Tue 2026-06-02:** Apple Weekly + finish ship items
- Apple Weekly Team Meeting
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — TP optional, originally due Jun 1
- Merge [#5149 Hide Free Plan / nav pills](https://app.asana.com/0/0/1215009192158952) if not already auto-merged (PR approved)
**Wed 2026-06-03:** Open Ship Review + animations
- O-N Weekly Meeting
- Open [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — currently unowned
- Start [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)
**Thu 2026-06-04:** Address SR feedback + AOR
- Address Ship Review comments as they land
- [Warn Before Quit pixel removal PR](https://app.asana.com/0/0/1212808567112832) — directly requested 2026-05-30
**Fri 2026-06-05:** Close umbrella + weekly review + career
- Close umbrella TP if SR complete
- Weekly review
- **Career Action**: draft Part 1 of Advisor Readiness doc (30 min)
### Must-Not-Forget
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 — last open in-progress subtask blocking the umbrella TP; Alex's own May/29 status commits to "complete on Mon".
- [ ] **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — assignee: Alex
due 2026-05-29 (1d overdue) — Temporary Pixels project posted automated request 2026-05-30: "please prepare a PR. If you need more time, add a comment and adjust the due date." Quote requires either a PR or a comment.
- [ ] **[Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)** — assignee: unassigned
no owner yet, umbrella due Fri 2026-06-05 — Alex owns the umbrella, so the SR subtask falls to him to open before reviewers can sign off.
- [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (3d overdue) — flagged in Diego's update 2026-05-30: first Monterey+ release ships Jun 15, so this PR needs to merge well before that.
- [ ] **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — assignee: Alex
due 2026-05-26 (4d overdue) — explicitly 5-minute timebox; one of the cheapest items to close.
### AOR Quick Wins This Week
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
overdue 1d — already in MNF; prepare PR removing the pixel OR comment back with new ETA.
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
overdue 36d — pairs naturally with the Warn-Before-Quit pixel removal; batch them in one PR.
- **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)**
overdue 3d — also in MNF; short PR, run + merge.
- **[Follow-up: add Inline Text Images support to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
overdue 2d — small follow-up from a recently shipped feature; close within a day.
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
overdue 4d — 5-min anonymous survey, no PR required.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check is failing on main — testWhenTabWith…ConnectionLostErrorActivatedAndReloadFailsAgain](https://app.asana.com/0/0/1213975496167929)**
overdue 38d — flaky test on main; if not already fixed, disable or stabilise.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 15d — second CI failure; triage and either fix or hand off.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
overdue 29d — Internal Product Feedback; small AOR.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
overdue 29d — Internal Product Feedback; small AOR.
- **[Review Overdue Tasks Summary — 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
overdue 123d — meta-task; spend 30 min closing/snoozing 510 stale items.
(+ 3 aged items >180 days in backlog — not listed)
### On Radar
- **GitHub review requests (6 pending)** — `[macOS] Improve value transformer failure observability`, `[macOS] Avoid a force unwrap crash when calling debugDescription`, `Bump nativeStorage rollout to 100%`, `Enable ad blocking feature availability to everyone - soft launch`, `Fix maestro tests`, `Enable iPad toggle for iOS 7.211`. Batch one review pass on a gap day; closest to AOR are the two `[macOS]` ones.
- **TD: [Apple pixels for evaluating when to end support for an OS](https://app.asana.com/0/0/1214950124367783)** — privacy triage filed 2026-05-30; relevant to Monterrey-only work above. Engage only if directly asked.
### Career Action This Week
**Draft Part 1 of Advisor Readiness doc (30 min)** — career-notes Goal #1 (Project Advisor, status: Not started) is the highest-leverage EP3 lever. All other career options blocked: Dominik OOO all week → no 1:1, no 1:1 prep, no calibration ping. Primary AOR / Assessment visibility deferred to first 1:1 after Dominik returns (Jun 8+). Target: Fri 2026-06-05 afternoon.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows — Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
Ivy clarified 2026-05-30 that Alex's plan IS the foundation, not a duplicate — engage with one short reply confirming alignment so the plan moves forward Mon/Tue.
- **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)**
Ivy 2026-05-30 proposed a perf-test replication using Sam's framework — monitor; only engage if implementation lands on macOS-side.
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
Elle 2026-05-30 flagged that macOS no longer sends `site_loading_performance` pixel — directly touches Alex's AOR-adjacent pixel work. Engage with a one-line acknowledgement and a triage owner.
### Carried Forward from Last Week
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — Alex (DRI)
→ see TP section above.
- **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — Alex
status per Alex's May/29 comment: shipping flow PR up. Confirm merged this week; close subtask.
- **[Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954)** — Alex
PR #5173 — CI green, waiting on review. Nudge reviewer Mon morning.
- **[Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952)** — Alex
PR #5149 — CI green, already approved. Confirm merge + close task Mon.
- **[Ship duck.ai onboarding query-selection flow permanently (PR #5145)](https://app.asana.com/0/0/1215009192158955)** — Alex
PR CI is RED; fix before requesting re-review.
- **[Demo tracker blocking after chat in onboarding [ON HOLD]](https://app.asana.com/0/0/1213551050320249)** — Alex (DRI, on hold)
due 2026-06-05; remains on hold until upstream blocker clears. No action unless status changes.
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
Dominik OOO Jun 15. Next 1:1 likely Jun 9 or later — keep adding notes; no prep deadline this week.
---
*Based on DB snapshot 2026-05-30 08:09 UTC. No prior weekly-review available for 2026-05-29 — plan built from snapshot + career-notes + recurring-rhythms.*
Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md`.
**Notes on inputs**:
- No `weekly/2026-05-29.md` review existed; plan was built solely from the DB snapshot (`asana_context.md`, generated 2026-05-30 08:09 UTC), career-notes, and recurring-rhythms.
- **Dominik OOO confirmed for the full work-week** (AFK Jun 13 LDX3 + Jun 45 holiday) → no 1:1 this week, no 1:1 prep.
- TP confirmed unchanged: iOS Address onboarding umbrella, due Fri 2026-06-05. Ship Review subtask still unowned — flagged in MNF.
- AOR pressure point: automated comment on Warn-Before-Quit pixel posted 2026-05-30 → either PR or status comment required.