[2026-05-30] add steam stop/start commands to htpc-system.md
This commit is contained in:
@@ -243,6 +243,20 @@ ssh bazzite@192.168.1.86 'echo bazzite | sudo -S mount ...'
|
||||
bazzite ALL=(ALL) NOPASSWD: /usr/bin/systemctl
|
||||
```
|
||||
|
||||
## Steam — остановка и запуск
|
||||
|
||||
**Остановка Steam (без sudo):**
|
||||
```bash
|
||||
systemctl --user stop gamescope-session-plus@steam
|
||||
```
|
||||
|
||||
**Запуск Steam (после остановки):**
|
||||
```bash
|
||||
systemctl --user start gamescope-session-plus@steam
|
||||
```
|
||||
|
||||
Или просто войти в Gaming Mode на TV — Steam запустится автоматически через steamos-manager.
|
||||
|
||||
## OSTree / Обновления
|
||||
- `/usr/local/bin` слетает при `rpm-ostree` upgrade (новый `/usr` overlay)
|
||||
- Бинари держать в `/home/bazzite/` или пересобирать после обновлений
|
||||
|
||||
@@ -0,0 +1,79 @@
|
||||
---
|
||||
## Daily Brief — 2026-05-30 (Saturday)
|
||||
|
||||
### ✨ Morning
|
||||
On this day in 1971, **Mariner 9** launched from Cape Canaveral. It would become the **first spacecraft ever to orbit another planet** — beating two Soviet probes to Mars by mere weeks. Quiet weekend → big history.
|
||||
🌿 Step outside for 5 minutes before opening anything.
|
||||
|
||||
## Plan for Today
|
||||
|
||||
Saturday = rest / light triage per weekly plan. Keep it lean — pick **one momentum win** and **one cheap response**, then close the laptop.
|
||||
|
||||
1. ⚡ [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min anonymous timebox, 4d overdue. Click, submit, done.
|
||||
2. 🔴 [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — automated comment posted today (2026-05-30) demands either a PR or a status comment with a new ETA. Cheapest path: post a short comment naming Thu 2026-06-04 as the PR date (matches Thu slot in weekly plan).
|
||||
3. 🟡 *(Optional, 5 min)* [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy confirmed yesterday Alex's plan IS the foundation. One short reply confirming alignment unblocks Mon/Tue.
|
||||
|
||||
Anchor: Today's focus per weekly plan = rest + 1–2 cheap closes. New signals since plan: automated comment on Warn Before Quit (yes, surfaced above). Nothing else urgent enough to break the rest day.
|
||||
|
||||
---
|
||||
|
||||
### 🔴 Urgent / Overdue
|
||||
|
||||
- **OVERDUE [DRI]** — [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)
|
||||
Context: 1d overdue. Temporary Pixels project posted automated comment today: "please prepare a PR. If you need more time, add a comment and adjust the due date."
|
||||
Action: post comment — *"Will land PR by Thu Jun 4. Adjusting due date."* — and bump due_on to 2026-06-04.
|
||||
|
||||
- **OVERDUE [DRI]** — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) / [PR #5145](https://app.asana.com/0/0/1215009192158955)
|
||||
Context: 2d overdue. PR CI is 🔴 RED — Alex is the current blocker; reviewers can't engage until green.
|
||||
Action: not for today (Saturday). Park for Mon morning — fix CI before requesting re-review.
|
||||
|
||||
- **OVERDUE [DRI]** — [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)
|
||||
Context: 3d overdue. Diego flagged 2026-05-30 that first Monterey+ release ships Jun 15 — must merge well before that.
|
||||
Action: not for today. Scheduled for Tue Jun 2 in weekly plan.
|
||||
|
||||
- **OVERDUE [DRI]** — [Follow-up: add Inline Text Images support to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)
|
||||
Context: 2d overdue. Small follow-up from a recently shipped feature.
|
||||
Action: not for today. Park for a gap day next week.
|
||||
|
||||
**Backlog cluster** (do_later / quick_wins / hack_days with stale dates — informational only, not urgent):
|
||||
Feature flag `warnBeforeQuit` (36d, pairs naturally with the Warn-Before-Quit PR — batch), CI-failing-tests pair (15d + 38d), Internal Product Feedback bugs (29d each), Review Overdue Tasks Summary (123d). None for Saturday — handled in next week's AOR window.
|
||||
|
||||
### 🟠 Needs Action Today
|
||||
|
||||
**Ship Reviews (DRI)**
|
||||
- [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — still unowned. Per weekly plan, Alex opens this on **Wed Jun 3**, not today. No action Saturday.
|
||||
|
||||
**PR Reviews**
|
||||
- 6 review requests queued (`[macOS] value transformer failure observability`, `[macOS] force unwrap crash on debugDescription`, `nativeStorage rollout 100%`, `ad blocking soft launch`, `Fix maestro tests`, `iPad toggle for iOS 7.211`). Batch on a gap day next week — full list in `asana_context.md`. Not for Saturday.
|
||||
|
||||
**Tech Designs / PFRs / Incidents**
|
||||
- None requiring Alex's response today.
|
||||
|
||||
### 🟡 Delegated — Follow Up Needed
|
||||
|
||||
- **OVERDUE [DELEGATED]** — [Privacy Triage: Apple - iOS Demo tracker blocking after chat](https://app.asana.com/0/0/1214965405681675)
|
||||
Assignee: Jake Abel. Due 2026-05-21 (9d overdue), no activity since 2026-05-20.
|
||||
Action: not for Saturday — nudge Jake on Mon: *"Hi Jake — any blocker on the privacy triage? Happy to jump on a quick call if it helps."*
|
||||
|
||||
- **STALE [DELEGATED]** — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896)
|
||||
74d stale, no GitHub match found in correlation check.
|
||||
Action: not for Saturday — on Mon decide whether to close or reassign.
|
||||
|
||||
- **MAINTENANCE ROTATION** — multiple subtasks (1215057989642795, 1215057989642802, 1215057989642808, 1215059118004301, 1215059118004308) due 2026-05-29, unassigned in DB.
|
||||
Action: not for Saturday — these are auto-generated weekly maintenance items; verify on Mon whether they were claimed in Asana but not yet synced.
|
||||
|
||||
_No "PR merged but Asana task open" rows in the delegated-PR correlation snapshot — nothing to close today._
|
||||
|
||||
### 🔵 Rhythms
|
||||
|
||||
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — TP set ~5d ago, umbrella due Fri Jun 5. Not stale. Next TP Thread check: TP not yet close to completion (Ship Review still unopened, Persist dialogue still in-progress), so no Next TP Thread needed yet.
|
||||
|
||||
**Active Rotations**: none active; none starting/ending within 3 days.
|
||||
|
||||
**Upcoming this week** (context only — no action today):
|
||||
- **Dominik OOO all week (Jun 1–5)** → no 1:1, no 1:1 prep. Next 1:1 likely Jun 9+.
|
||||
- **Career action** scheduled for Fri Jun 5: draft Part 1 of Advisor Readiness doc (30 min). Top-leverage EP3 item per career-notes.
|
||||
- Standing meetings this week: O-L Mon, Apple Weekly Tue, O-N Wed.
|
||||
|
||||
---
|
||||
*Saturday rest day — two clicks (Survey + Warn-Before-Quit comment) and an optional reply to Ivy are the entire ask. Everything else is pre-positioned for next week per the plan.*
|
||||
@@ -1,20 +1,18 @@
|
||||
## Inbox Triage — 2026-05-30 (since 2026-05-30 13:05)
|
||||
## Inbox Triage — 2026-05-30 (since 14:01)
|
||||
|
||||
### New / Changed — Action Required
|
||||
Inbox quiet — nothing new.
|
||||
|
||||
### New / Changed — Monitoring
|
||||
Inbox quiet — nothing new.
|
||||
|
||||
### Nothing new
|
||||
- Snapshot timestamp: 2026-05-30 07:36 UTC (12:36 Almaty / 13:36 local +06). SINCE = 13:05 local = 07:05 UTC. Snapshot covers ~30-min window before SINCE plus the moments after.
|
||||
- Only post-SINCE change in `Changed in Last 24h`: **Remove or re-evaluate Warn Before Quit pixels** modified 07:14 UTC — automated overdue-reminder bot comment ("This pixel is overdue for removal, please prepare a PR.") with author `null`. Bot/automated, excluded per scope filter. (Already in `🔴 Signals → Overdue` in status.md.)
|
||||
- `Recent Comments on My Tasks (24h)`: only the bot comment above and Alex's own May 29 13:02 status update on *iOS Address onboarding…* — both excluded.
|
||||
- Delegated: no activity after SINCE.
|
||||
- No Ship Review / Tech Design status changes.
|
||||
- No new direct @mentions surfaced by the snapshot.
|
||||
|
||||
### Carried over from earlier triage (still open, no new activity since SINCE)
|
||||
- [Desktop Browsers: Windows - Produce delivery plan for DDG AOT build](https://app.asana.com/0/0/1215255758473719) — awaiting your confirmation on Ivy's project-scope split.
|
||||
- [[iOS] QR Codes for Internal Builds](https://app.asana.com/0/0/1215254539767172) — Jorge's proposal still awaits 👍 / feedback.
|
||||
- Local Postgres last fetched at 14:09 local (+06). Most recent Asana activity is at 13:56 local — 5 minutes before SINCE.
|
||||
- **STEP 1b @mention query** (all tasks, not just `my_tasks`): 0 rows for `resource_subtype = 'at_mention' AND created_at > 14:01 local`.
|
||||
- **All stories since SINCE** (excluding Alex): 0 rows. Latest cluster of stories (13:41–13:56) is all from `Dax the Duck` — automated custom-field / section / project changes on inbound feedback tasks (*NEED tO FIX POP UP BLOCKER*, *What is your 1 Must today?*). Bot noise, excluded.
|
||||
- **New / modified tasks assigned to Alex since SINCE**: 0 rows.
|
||||
- No Ship Review / Tech Design state changes since SINCE.
|
||||
|
||||
### Caveats
|
||||
- **STEP 1b skipped (DB unavailable):** `envdir`/`psql`/`/etc/ddg/dbenv` are not installed on this laptop — direct `at_mention` story queries against the internal Postgres only work on internal automation nodes (per `~/.claude/rules/postgres.md`). Any @mentions on tasks outside Alex's `my_tasks` scope since SINCE will not have been caught here. Re-run from `use-internal-automation1` for full coverage if needed.
|
||||
- **STEP 0 live calendar check blocked:** `outlook_calendar_search` was blocked by the lethal-trifecta hook on this surface. Fell back to status.md + snapshot — Saturday 13:37 local with no scheduled meeting; not Tuesday 15:00 Dominik slot; Apple Weekly is Jun 2 not today; current app is Zulip (not deep focus). Focus check passes.
|
||||
- **Backlog of older unreplied comments** (Tom Strba on *macOS Maintenance Process Feedback*, Rob on *AOR: SERP Frontend Tests*, Olivia on *AOR: Web Tracking Protections Help Page*, Bulcsu on *Windows Browser: Re-enable isolated JS worlds*) predates SINCE and already lives in `🔴 Signals → Comments awaiting reply` for the daily brief — not re-surfaced here.
|
||||
- **STEP 0 live calendar check unavailable.** `outlook_calendar_search` blocked by lethal-trifecta hook on this surface. Fell back to status.md + day/hour gating — Saturday 14:18 local, not Tuesday 15:00 Dominik slot, Apple Weekly is Jun 2 not today, status.md shows no recent activity (not in a focused app). Focus check passes.
|
||||
- **Backlog of older unreplied human comments** (Tom Strba on *macOS Maintenance Process Feedback*, Rob on *AOR: SERP Frontend Tests*, Olivia on *AOR: Web Tracking Protections Help Page*, Bulcsu on *Windows Browser: Re-enable isolated JS worlds*) predates SINCE and already lives in `🔴 Signals → Comments awaiting reply` in status.md — not re-surfaced here per scope filter.
|
||||
|
||||
@@ -0,0 +1,152 @@
|
||||
# Weekly Plan — Week of 2026-05-25
|
||||
|
||||
> Generated Sat 2026-05-30 (no prior weekly-review found for 2026-05-29; plan is built from current DB snapshot and career-notes).
|
||||
> Shape starts from today; main working week covers Mon 2026-06-01 → Fri 2026-06-05.
|
||||
|
||||
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella due 2026-06-05; Ship Review still open and one large subtask ("Persist 'You've got this' [2d]") plus two animated/visual subtasks remain.
|
||||
|
||||
### Quadrants
|
||||
| Quadrant | This Week | Notes |
|
||||
|---|---|---|
|
||||
| Project | 75% | Ship Review week — umbrella due Fri; absorb time normally spent on 1:1 prep. |
|
||||
| AOR | 15% | Warn Before Quit pixel removal (direct request 2026-05-30), Monterrey-only PR follow-up, CI-failure cleanup if gaps appear. |
|
||||
| Career | 10% | Dominik OOO all week (Jun 1–5) → no 1:1, no 1:1 prep. Use the freed time for Project Advisor doc draft (highest-leverage item from career-notes). |
|
||||
| Strategy | 5% | Light; defer to next week. |
|
||||
|
||||
### Shape
|
||||
|
||||
**Sat 2026-05-30:** rest / light triage
|
||||
- Optional: respond to [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy clarified scope after Alex's question
|
||||
|
||||
**Sun 2026-05-31:** rest
|
||||
|
||||
**Mon 2026-06-01:** Persist dialogue + week kick-off
|
||||
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — TP subtask, due today
|
||||
- O-L Weekly Meeting
|
||||
- Set 1-Must = land Persist dialogue PR
|
||||
|
||||
**Tue 2026-06-02:** Apple Weekly + finish ship items
|
||||
- Apple Weekly Team Meeting
|
||||
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — TP optional, originally due Jun 1
|
||||
- Merge [#5149 Hide Free Plan / nav pills](https://app.asana.com/0/0/1215009192158952) if not already auto-merged (PR approved)
|
||||
|
||||
**Wed 2026-06-03:** Open Ship Review + animations
|
||||
- O-N Weekly Meeting
|
||||
- Open [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — currently unowned
|
||||
- Start [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)
|
||||
|
||||
**Thu 2026-06-04:** Address SR feedback + AOR
|
||||
- Address Ship Review comments as they land
|
||||
- [Warn Before Quit pixel removal PR](https://app.asana.com/0/0/1212808567112832) — directly requested 2026-05-30
|
||||
|
||||
**Fri 2026-06-05:** Close umbrella + weekly review + career
|
||||
- Close umbrella TP if SR complete
|
||||
- Weekly review
|
||||
- **Career Action**: draft Part 1 of Advisor Readiness doc (30 min)
|
||||
|
||||
### Must-Not-Forget
|
||||
|
||||
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
|
||||
due 2026-06-01 — last open in-progress subtask blocking the umbrella TP; Alex's own May/29 status commits to "complete on Mon".
|
||||
|
||||
- [ ] **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — assignee: Alex
|
||||
due 2026-05-29 (1d overdue) — Temporary Pixels project posted automated request 2026-05-30: "please prepare a PR. If you need more time, add a comment and adjust the due date." Quote requires either a PR or a comment.
|
||||
|
||||
- [ ] **[Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)** — assignee: unassigned
|
||||
no owner yet, umbrella due Fri 2026-06-05 — Alex owns the umbrella, so the SR subtask falls to him to open before reviewers can sign off.
|
||||
|
||||
- [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
|
||||
due 2026-05-27 (3d overdue) — flagged in Diego's update 2026-05-30: first Monterey+ release ships Jun 15, so this PR needs to merge well before that.
|
||||
|
||||
- [ ] **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — assignee: Alex
|
||||
due 2026-05-26 (4d overdue) — explicitly 5-minute timebox; one of the cheapest items to close.
|
||||
|
||||
### AOR Quick Wins This Week
|
||||
|
||||
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
|
||||
overdue 1d — already in MNF; prepare PR removing the pixel OR comment back with new ETA.
|
||||
|
||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||
overdue 36d — pairs naturally with the Warn-Before-Quit pixel removal; batch them in one PR.
|
||||
|
||||
- **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)**
|
||||
overdue 3d — also in MNF; short PR, run + merge.
|
||||
|
||||
- **[Follow-up: add Inline Text Images support to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
|
||||
overdue 2d — small follow-up from a recently shipped feature; close within a day.
|
||||
|
||||
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
|
||||
overdue 4d — 5-min anonymous survey, no PR required.
|
||||
|
||||
### Sprint Backlog (pick 1–2 if time allows)
|
||||
|
||||
- **[PR Check is failing on main — testWhenTabWith…ConnectionLostErrorActivatedAndReloadFailsAgain](https://app.asana.com/0/0/1213975496167929)**
|
||||
overdue 38d — flaky test on main; if not already fixed, disable or stabilise.
|
||||
|
||||
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
|
||||
overdue 15d — second CI failure; triage and either fix or hand off.
|
||||
|
||||
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
||||
overdue 29d — Internal Product Feedback; small AOR.
|
||||
|
||||
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
|
||||
overdue 29d — Internal Product Feedback; small AOR.
|
||||
|
||||
- **[Review Overdue Tasks Summary — 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
|
||||
overdue 123d — meta-task; spend 30 min closing/snoozing 5–10 stale items.
|
||||
|
||||
(+ 3 aged items >180 days in backlog — not listed)
|
||||
|
||||
### On Radar
|
||||
|
||||
- **GitHub review requests (6 pending)** — `[macOS] Improve value transformer failure observability`, `[macOS] Avoid a force unwrap crash when calling debugDescription`, `Bump nativeStorage rollout to 100%`, `Enable ad blocking feature availability to everyone - soft launch`, `Fix maestro tests`, `Enable iPad toggle for iOS 7.211`. Batch one review pass on a gap day; closest to AOR are the two `[macOS]` ones.
|
||||
|
||||
- **TD: [Apple pixels for evaluating when to end support for an OS](https://app.asana.com/0/0/1214950124367783)** — privacy triage filed 2026-05-30; relevant to Monterrey-only work above. Engage only if directly asked.
|
||||
|
||||
### Career Action This Week
|
||||
**Draft Part 1 of Advisor Readiness doc (30 min)** — career-notes Goal #1 (Project Advisor, status: Not started) is the highest-leverage EP3 lever. All other career options blocked: Dominik OOO all week → no 1:1, no 1:1 prep, no calibration ping. Primary AOR / Assessment visibility deferred to first 1:1 after Dominik returns (Jun 8+). Target: Fri 2026-06-05 afternoon.
|
||||
|
||||
### On Radar / Participation Needed
|
||||
|
||||
- **[Desktop Browsers: Windows — Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
|
||||
Ivy clarified 2026-05-30 that Alex's plan IS the foundation, not a duplicate — engage with one short reply confirming alignment so the plan moves forward Mon/Tue.
|
||||
|
||||
- **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)**
|
||||
Ivy 2026-05-30 proposed a perf-test replication using Sam's framework — monitor; only engage if implementation lands on macOS-side.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
|
||||
Elle 2026-05-30 flagged that macOS no longer sends `site_loading_performance` pixel — directly touches Alex's AOR-adjacent pixel work. Engage with a one-line acknowledgement and a triage owner.
|
||||
|
||||
### Carried Forward from Last Week
|
||||
|
||||
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — Alex (DRI)
|
||||
→ see TP section above.
|
||||
|
||||
- **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — Alex
|
||||
status per Alex's May/29 comment: shipping flow PR up. Confirm merged this week; close subtask.
|
||||
|
||||
- **[Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954)** — Alex
|
||||
PR #5173 — CI green, waiting on review. Nudge reviewer Mon morning.
|
||||
|
||||
- **[Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952)** — Alex
|
||||
PR #5149 — CI green, already approved. Confirm merge + close task Mon.
|
||||
|
||||
- **[Ship duck.ai onboarding query-selection flow permanently (PR #5145)](https://app.asana.com/0/0/1215009192158955)** — Alex
|
||||
PR CI is RED; fix before requesting re-review.
|
||||
|
||||
- **[Demo tracker blocking after chat in onboarding [ON HOLD]](https://app.asana.com/0/0/1213551050320249)** — Alex (DRI, on hold)
|
||||
due 2026-06-05; remains on hold until upstream blocker clears. No action unless status changes.
|
||||
|
||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
|
||||
Dominik OOO Jun 1–5. Next 1:1 likely Jun 9 or later — keep adding notes; no prep deadline this week.
|
||||
|
||||
---
|
||||
*Based on DB snapshot 2026-05-30 08:09 UTC. No prior weekly-review available for 2026-05-29 — plan built from snapshot + career-notes + recurring-rhythms.*
|
||||
|
||||
Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md`.
|
||||
|
||||
**Notes on inputs**:
|
||||
- No `weekly/2026-05-29.md` review existed; plan was built solely from the DB snapshot (`asana_context.md`, generated 2026-05-30 08:09 UTC), career-notes, and recurring-rhythms.
|
||||
- **Dominik OOO confirmed for the full work-week** (AFK Jun 1–3 LDX3 + Jun 4–5 holiday) → no 1:1 this week, no 1:1 prep.
|
||||
- TP confirmed unchanged: iOS Address onboarding umbrella, due Fri 2026-06-05. Ship Review subtask still unowned — flagged in MNF.
|
||||
- AOR pressure point: automated comment on Warn-Before-Quit pixel posted 2026-05-30 → either PR or status comment required.
|
||||
Reference in New Issue
Block a user