Files
obsidian-vault/work/briefs/daily/2026-05-30.md
T

80 lines
5.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-05-30 (Saturday)
### ✨ Morning
On this day in 1971, **Mariner 9** launched from Cape Canaveral. It would become the **first spacecraft ever to orbit another planet** — beating two Soviet probes to Mars by mere weeks. Quiet weekend → big history.
🌿 Step outside for 5 minutes before opening anything.
## Plan for Today
Saturday = rest / light triage per weekly plan. Keep it lean — pick **one momentum win** and **one cheap response**, then close the laptop.
1. ⚡ [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min anonymous timebox, 4d overdue. Click, submit, done.
2. 🔴 [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — automated comment posted today (2026-05-30) demands either a PR or a status comment with a new ETA. Cheapest path: post a short comment naming Thu 2026-06-04 as the PR date (matches Thu slot in weekly plan).
3. 🟡 *(Optional, 5 min)* [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy confirmed yesterday Alex's plan IS the foundation. One short reply confirming alignment unblocks Mon/Tue.
Anchor: Today's focus per weekly plan = rest + 12 cheap closes. New signals since plan: automated comment on Warn Before Quit (yes, surfaced above). Nothing else urgent enough to break the rest day.
---
### 🔴 Urgent / Overdue
- **OVERDUE [DRI]** — [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)
Context: 1d overdue. Temporary Pixels project posted automated comment today: "please prepare a PR. If you need more time, add a comment and adjust the due date."
Action: post comment — *"Will land PR by Thu Jun 4. Adjusting due date."* — and bump due_on to 2026-06-04.
- **OVERDUE [DRI]** — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) / [PR #5145](https://app.asana.com/0/0/1215009192158955)
Context: 2d overdue. PR CI is 🔴 RED — Alex is the current blocker; reviewers can't engage until green.
Action: not for today (Saturday). Park for Mon morning — fix CI before requesting re-review.
- **OVERDUE [DRI]** — [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)
Context: 3d overdue. Diego flagged 2026-05-30 that first Monterey+ release ships Jun 15 — must merge well before that.
Action: not for today. Scheduled for Tue Jun 2 in weekly plan.
- **OVERDUE [DRI]** — [Follow-up: add Inline Text Images support to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)
Context: 2d overdue. Small follow-up from a recently shipped feature.
Action: not for today. Park for a gap day next week.
**Backlog cluster** (do_later / quick_wins / hack_days with stale dates — informational only, not urgent):
Feature flag `warnBeforeQuit` (36d, pairs naturally with the Warn-Before-Quit PR — batch), CI-failing-tests pair (15d + 38d), Internal Product Feedback bugs (29d each), Review Overdue Tasks Summary (123d). None for Saturday — handled in next week's AOR window.
### 🟠 Needs Action Today
**Ship Reviews (DRI)**
- [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — still unowned. Per weekly plan, Alex opens this on **Wed Jun 3**, not today. No action Saturday.
**PR Reviews**
- 6 review requests queued (`[macOS] value transformer failure observability`, `[macOS] force unwrap crash on debugDescription`, `nativeStorage rollout 100%`, `ad blocking soft launch`, `Fix maestro tests`, `iPad toggle for iOS 7.211`). Batch on a gap day next week — full list in `asana_context.md`. Not for Saturday.
**Tech Designs / PFRs / Incidents**
- None requiring Alex's response today.
### 🟡 Delegated — Follow Up Needed
- **OVERDUE [DELEGATED]** — [Privacy Triage: Apple - iOS Demo tracker blocking after chat](https://app.asana.com/0/0/1214965405681675)
Assignee: Jake Abel. Due 2026-05-21 (9d overdue), no activity since 2026-05-20.
Action: not for Saturday — nudge Jake on Mon: *"Hi Jake — any blocker on the privacy triage? Happy to jump on a quick call if it helps."*
- **STALE [DELEGATED]** — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896)
74d stale, no GitHub match found in correlation check.
Action: not for Saturday — on Mon decide whether to close or reassign.
- **MAINTENANCE ROTATION** — multiple subtasks (1215057989642795, 1215057989642802, 1215057989642808, 1215059118004301, 1215059118004308) due 2026-05-29, unassigned in DB.
Action: not for Saturday — these are auto-generated weekly maintenance items; verify on Mon whether they were claimed in Asana but not yet synced.
_No "PR merged but Asana task open" rows in the delegated-PR correlation snapshot — nothing to close today._
### 🔵 Rhythms
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — TP set ~5d ago, umbrella due Fri Jun 5. Not stale. Next TP Thread check: TP not yet close to completion (Ship Review still unopened, Persist dialogue still in-progress), so no Next TP Thread needed yet.
**Active Rotations**: none active; none starting/ending within 3 days.
**Upcoming this week** (context only — no action today):
- **Dominik OOO all week (Jun 15)** → no 1:1, no 1:1 prep. Next 1:1 likely Jun 9+.
- **Career action** scheduled for Fri Jun 5: draft Part 1 of Advisor Readiness doc (30 min). Top-leverage EP3 item per career-notes.
- Standing meetings this week: O-L Mon, Apple Weekly Tue, O-N Wed.
---
*Saturday rest day — two clicks (Survey + Warn-Before-Quit comment) and an optional reply to Ivy are the entire ask. Everything else is pre-positioned for next week per the plan.*