Files
obsidian-vault/work/projects/ios-subscription-day7-promo-kickoff.md
T

23 lines
1.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Kick-off: (iOS) Grow active subscriptions by increasing paywall impressions with a day 7 promo half-sheet
Zoom link: https://duckduckgo.zoom.us/my/malex
**Stakeholders and their responsibilities**
- Project Advisor: https://app.asana.com/1/137249556945/profile/1201807753392396
- [Other stakeholders](https://app.asana.com/0/0/1207268731049844/f): https://app.asana.com/1/137249556945/profile/1200848785550295 https://app.asana.com/1/137249556945/profile/1206329551987277 https://app.asana.com/1/137249556945/profile/1211198099252476 https://app.asana.com/1/137249556945/profile/1200727780991749
**Scope updates**
- iOS port of the Android implementation. See [Android kick-off](https://app.asana.com/1/137249556945/project/72649045549333/task/1211002275165337) for the original.
- [Onboarding Components 2026 Figma](https://www.figma.com/design/wMxBpe0mKrRS0nVhtwMGO7/%F0%9F%9A%80-Onboarding-Components--2026-?node-id=1399-36178&t=92pL7LrBP1GYjq7N-1) (reused from reinstaller promo, same half-sheet modal — `SubscriptionPromoLaunchView` and `SubscriptionPromoPresenter` are pre-existing iOS code, no new UI needed)
- Pixels?
**Discussion items**
- Who are the users targeted by this project? Scenarios where a user hasn't seen the subscription promo by day 7: (1) completed onboarding normally but the promo wasn't shown (e.g. installed before the onboarding promo existed); (2) skipped onboarding (reinstaller/returning user path — already covered by the existing reinstaller promo). Worth aligning on whether the scope covers both and how they're handled.
- Do we need to add a Grafana board to monitor the promo impression/tap/dismiss pixels?
**Next steps**