Files
obsidian-vault/work/briefs/weekly/plan-2026-06-01.md
T

135 lines
9.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan
## Weekly Plan — Week of 2026-06-01
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — DRI on the parent ship with 4 subtasks already overdue, ship review still uncommented, hard deadline Fri 6/5 the day before partial WWDC AFK starts.
**Note on inputs**: No weekly review file exists at `/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md` (eod and weekly dirs were empty). This plan is built directly from the Asana snapshot + career-notes + recurring-rhythms. Flagging the gap so a weekly review can be backfilled at end-of-week.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | Ship Review prep + 4 overdue onboarding subtasks; Fri deadline before WWDC partial AFK 6/812. Up from 60% target — explicit tradeoff against Career/Strategy this week. |
| AOR | 10% | Light week: only one open AOR PR (Monterrey-only) and quick-action overdue cleanup. |
| Career | 15% | Dominik OOO entire week (1:1 skipped) — convert that slot to Project Advisor readiness doc, since EP3 cycle is ~8 weeks out. |
| Strategy | 5% | Engage with Windows AOT delivery-plan thread (already drafted Sat reply; needs follow-up Mon). |
### Shape
**Mon (today):** Close fast-merge onboarding PRs + tee up Ship Review
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 ✅ CI ✅ review → merge
- [Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 ✅ CI ✅ review → merge
- [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — PR #5145 🔴 CI failing → diagnose + fix
- O-L Weekly Meeting (recurring, 6/1)
**Tue:** Persist + Try Visiting work + Apple Weekly demo prep
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due today; first half of 2d estimate
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — was due 6/1, slip to Tue
- Apple Weekly Team Meeting (recurring, 6/2)
- Reply to Mark on [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) thread (Strategy)
**Wed:** Animated assets + parent ship task progress
- [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due Thu 6/4, start now
- [iOS Address onboarding conflicts with unified input...](https://app.asana.com/0/0/1214592943696234) — push parent toward ship-ready
- O-N Weekly Meeting (recurring, 6/3)
**Thu:** Ship Review submission day
- [Ship Review: iOS Address onboarding conflicts...](https://app.asana.com/0/0/1215009192158961) — populate, request reviewers
- Close remaining animated-asset work
- Career: 30-min block — draft Part 1 of Project Advisor Readiness doc ([Readiness Self-Reflection](https://app.asana.com/0/0/1210386994396212))
**Fri:** Lock-in + weekly review + WWDC handoff
- Final SR sign-off chase on [iOS Address onboarding parent](https://app.asana.com/0/0/1214592943696234) (due today)
- Write weekly review for 2026-06-05 (backfill: include 5/29 + this week)
- Handoff notes for partial WWDC AFK 6/812 — flag any open subtasks, name interim DRI if needed
- (No 1:1 — Dominik OOO 6/16/5)
### Must-Not-Forget
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 (today) — Alex is DRI; sized at 2d so already at risk of slipping into Wed even if started today.
- [ ] **[Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342)** — assignee: Alex
due 2026-06-01 (today) — Alex is DRI on an onboarding subtask feeding the Fri 6/5 ship; do not let this drift past Tue.
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (4d overdue) — PR #5145 has 🔴 CI. Alex is DRI; failing CI = Alex is the blocker, not waiting on review.
- [ ] **[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)** — assignee: Alex
due 2026-06-04 — 23d estimate means start by Wed at latest or the Fri 6/5 parent ship slips.
- [ ] **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
due 2026-06-05 — Parent ship; this is the TP. Subtasks must close in time to leave Thu for Ship Review.
### AOR Quick Wins This Week
- **[Desktop Browser Feature Owner Survey [anonymous, 5 minute timebox]](https://app.asana.com/0/0/1214940335721015)**
overdue 6 days — 5-minute anonymous survey. Knock out before Tue.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
overdue 31 days — Internal Product Feedback bug; triage decision + assign or fix-tag.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
overdue 31 days — Internal Product Feedback bug; same — triage and route.
- **[PR: Make our macOS app Monterrey-only - 1-3d (apple-browsers)](https://app.asana.com/0/0/1215150214975916)**
overdue 5 days — Alex's PR; verify status (likely ready to land, see Diego's 5/30 note that Monterey+ merges this week).
### Sprint Backlog (pick 12 if time allows)
- **[PR Check failing on main — testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain...](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 (40d overdue) — CI failing test; in `active` section.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
due 2026-05-15 (17d overdue) — CI failing test; check whether Sam S's overnight-stable PR (per 5/31 comment on the now-closed sibling) covers this too.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (125d overdue) — Inbox cleanup pass; defer to post-WWDC unless room appears.
(+ 3 aged items >180 days in backlog — not listed)
### On Radar
- **TD/discussion: [Sorting in big HTML is 15sec vs Vivaldi 2sec](https://app.asana.com/0/0/1215191840665591)** — Ivy flagged DOM performance test framework angle. Performance is adjacent to macOS browser core but no direct ask of Alex; monitor.
- **TD/discussion: [Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)** — Bulcsu commented on flag-passing approach. Touches Windows AOT plan Alex authored; monitor; engage if scope creeps.
- **TD/discussion: [Desktop Browsers: Design - Simplify Fire Button](https://app.asana.com/0/0/1215239862935826)** — Peter + Mark aligning on feature-flag rollout sequencing. Mac UI work in Alex's wheelhouse; monitor.
### Career Action This Week
**Draft Part 1 of [Project Advisor Readiness Self-Reflection](https://app.asana.com/0/0/1210386994396212) (30 min, Thu).**
Picked because: (1) Dominik OOO entire week → 1:1 prep N/A; (2) Project Advisor is the #1 EP3 lever per career-notes and is `Not started`; (3) Christie calibration follow-up not actionable without Dominik; (4) no active O-N/O-L Assessment surfaced in DB right now needing a comment. Other items skipped for those reasons.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
Alex pushed back on Fri/Sat ("don't get why a different DRI is spun off without discussing"), Ivy + Mark responded Sat clarifying scope. Alex has not yet replied — engage Tue to close the loop before this drifts.
### Carried Forward from Last Week
<!-- No weekly review file found for 2026-05-29; entries below inferred from snapshot history. -->
- **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — Alex
→ see TP section above (PR #5145 CI failing)
- **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — Alex
→ see TP section above (PR #5149 ready to merge)
- **[Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — Alex
→ see TP section above (PR #5173 ready to merge)
- **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — Alex
PR open, 5 days overdue. Diego's 5/30 note confirms Monterey+ branch merges this week; sync with him then close.
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — Alex
PR #4663 open as draft (CI ✅, review ⏳). Was due 5/28; un-draft and request review post-ship.
- **[PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896)** — delegated, assignee unknown
Stale 76d, no GitHub match found (per delegated PR correlation in snapshot). Verify owner + state.
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
Due 5/26 was last cycle's; Dominik OOO this entire week → no 1:1 to prep. Add the Project Advisor doc result + EP3 gap question for the next 1:1 (likely week of 6/15+).
---
*Based on Asana snapshot 2026-06-01 07:31 UTC + career-notes + recurring-rhythms. No weekly-review file found for 2026-05-29 — flagged above. Plan generated 2026-06-01 ~13:35 local.*