# Weekly Plan ## Weekly Plan — Week of 2026-06-01 **Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — DRI on the parent ship with 4 subtasks already overdue, ship review still uncommented, hard deadline Fri 6/5 the day before partial WWDC AFK starts. **Note on inputs**: No weekly review file exists at `/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md` (eod and weekly dirs were empty). This plan is built directly from the Asana snapshot + career-notes + recurring-rhythms. Flagging the gap so a weekly review can be backfilled at end-of-week. ### Quadrants | Quadrant | This Week | Notes | |---|---|---| | Project | 70% | Ship Review prep + 4 overdue onboarding subtasks; Fri deadline before WWDC partial AFK 6/8–12. Up from 60% target — explicit tradeoff against Career/Strategy this week. | | AOR | 10% | Light week: only one open AOR PR (Monterrey-only) and quick-action overdue cleanup. | | Career | 15% | Dominik OOO entire week (1:1 skipped) — convert that slot to Project Advisor readiness doc, since EP3 cycle is ~8 weeks out. | | Strategy | 5% | Engage with Windows AOT delivery-plan thread (already drafted Sat reply; needs follow-up Mon). | ### Shape **Mon (today):** Close fast-merge onboarding PRs + tee up Ship Review - [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 ✅ CI ✅ review → merge - [Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 ✅ CI ✅ review → merge - [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — PR #5145 🔴 CI failing → diagnose + fix - O-L Weekly Meeting (recurring, 6/1) **Tue:** Persist + Try Visiting work + Apple Weekly demo prep - [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due today; first half of 2d estimate - [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — was due 6/1, slip to Tue - Apple Weekly Team Meeting (recurring, 6/2) - Reply to Mark on [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) thread (Strategy) **Wed:** Animated assets + parent ship task progress - [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due Thu 6/4, start now - [iOS Address onboarding conflicts with unified input...](https://app.asana.com/0/0/1214592943696234) — push parent toward ship-ready - O-N Weekly Meeting (recurring, 6/3) **Thu:** Ship Review submission day - [Ship Review: iOS Address onboarding conflicts...](https://app.asana.com/0/0/1215009192158961) — populate, request reviewers - Close remaining animated-asset work - Career: 30-min block — draft Part 1 of Project Advisor Readiness doc ([Readiness Self-Reflection](https://app.asana.com/0/0/1210386994396212)) **Fri:** Lock-in + weekly review + WWDC handoff - Final SR sign-off chase on [iOS Address onboarding parent](https://app.asana.com/0/0/1214592943696234) (due today) - Write weekly review for 2026-06-05 (backfill: include 5/29 + this week) - Handoff notes for partial WWDC AFK 6/8–12 — flag any open subtasks, name interim DRI if needed - (No 1:1 — Dominik OOO 6/1–6/5) ### Must-Not-Forget - [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex due 2026-06-01 (today) — Alex is DRI; sized at 2d so already at risk of slipping into Wed even if started today. - [ ] **[Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342)** — assignee: Alex due 2026-06-01 (today) — Alex is DRI on an onboarding subtask feeding the Fri 6/5 ship; do not let this drift past Tue. - [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex due 2026-05-28 (4d overdue) — PR #5145 has 🔴 CI. Alex is DRI; failing CI = Alex is the blocker, not waiting on review. - [ ] **[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)** — assignee: Alex due 2026-06-04 — 2–3d estimate means start by Wed at latest or the Fri 6/5 parent ship slips. - [ ] **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex due 2026-06-05 — Parent ship; this is the TP. Subtasks must close in time to leave Thu for Ship Review. ### AOR Quick Wins This Week - **[Desktop Browser Feature Owner Survey [anonymous, 5 minute timebox]](https://app.asana.com/0/0/1214940335721015)** overdue 6 days — 5-minute anonymous survey. Knock out before Tue. - **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)** overdue 31 days — Internal Product Feedback bug; triage decision + assign or fix-tag. - **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)** overdue 31 days — Internal Product Feedback bug; same — triage and route. - **[PR: Make our macOS app Monterrey-only - 1-3d (apple-browsers)](https://app.asana.com/0/0/1215150214975916)** overdue 5 days — Alex's PR; verify status (likely ready to land, see Diego's 5/30 note that Monterey+ merges this week). ### Sprint Backlog (pick 1–2 if time allows) - **[PR Check failing on main — testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain...](https://app.asana.com/0/0/1213975496167929)** due 2026-04-22 (40d overdue) — CI failing test; in `active` section. - **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)** due 2026-05-15 (17d overdue) — CI failing test; check whether Sam S's overnight-stable PR (per 5/31 comment on the now-closed sibling) covers this too. - **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)** due 2026-01-27 (125d overdue) — Inbox cleanup pass; defer to post-WWDC unless room appears. (+ 3 aged items >180 days in backlog — not listed) ### On Radar - **TD/discussion: [Sorting in big HTML is 15sec vs Vivaldi 2sec](https://app.asana.com/0/0/1215191840665591)** — Ivy flagged DOM performance test framework angle. Performance is adjacent to macOS browser core but no direct ask of Alex; monitor. - **TD/discussion: [Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)** — Bulcsu commented on flag-passing approach. Touches Windows AOT plan Alex authored; monitor; engage if scope creeps. - **TD/discussion: [Desktop Browsers: Design - Simplify Fire Button](https://app.asana.com/0/0/1215239862935826)** — Peter + Mark aligning on feature-flag rollout sequencing. Mac UI work in Alex's wheelhouse; monitor. ### Career Action This Week **Draft Part 1 of [Project Advisor Readiness Self-Reflection](https://app.asana.com/0/0/1210386994396212) (30 min, Thu).** Picked because: (1) Dominik OOO entire week → 1:1 prep N/A; (2) Project Advisor is the #1 EP3 lever per career-notes and is `Not started`; (3) Christie calibration follow-up not actionable without Dominik; (4) no active O-N/O-L Assessment surfaced in DB right now needing a comment. Other items skipped for those reasons. ### On Radar / Participation Needed - **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)** Alex pushed back on Fri/Sat ("don't get why a different DRI is spun off without discussing"), Ivy + Mark responded Sat clarifying scope. Alex has not yet replied — engage Tue to close the loop before this drifts. ### Carried Forward from Last Week - **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — Alex → see TP section above (PR #5145 CI failing) - **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — Alex → see TP section above (PR #5149 ready to merge) - **[Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — Alex → see TP section above (PR #5173 ready to merge) - **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — Alex PR open, 5 days overdue. Diego's 5/30 note confirms Monterey+ branch merges this week; sync with him then close. - **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — Alex PR #4663 open as draft (CI ✅, review ⏳). Was due 5/28; un-draft and request review post-ship. - **[PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896)** — delegated, assignee unknown Stale 76d, no GitHub match found (per delegated PR correlation in snapshot). Verify owner + state. - **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex Due 5/26 was last cycle's; Dominik OOO this entire week → no 1:1 to prep. Add the Project Advisor doc result + EP3 gap question for the next 1:1 (likely week of 6/15+). --- *Based on Asana snapshot 2026-06-01 07:31 UTC + career-notes + recurring-rhythms. No weekly-review file found for 2026-05-29 — flagged above. Plan generated 2026-06-01 ~13:35 local.*