Files
obsidian-vault/work/briefs/weekly/plan-2026-06-01.md
T

151 lines
11 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan
---
## Weekly Plan — Week of 2026-06-01
**Note**: No prior weekly review file found (`weekly/` directory was empty). This plan is seeded from current Asana state, not from a Friday review setup. Subsequent weeks will reference the prior review.
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella project task due Fri 2026-06-05; four sub-tasks in `top_priority` (Persist dialogue [2d], Hide Free Plan, Hide stop button, Ship AI onboarding winner) all converge on this; Ship Review task (1215009192158961) is already created and downstream. This is the visible deliverable for the week.
**Career Advisor status**: Dominik OOO entire week (LDX3 Jun 1-3 + Public Holiday Jun 4-5). **1:1 SKIPPED.** Next likely 1:1 window is bi-weekly cadence after Jun 8 — but Alex is partly AFK for WWDC'26 Jun 8-12. Realistic next 1:1: week of Jun 15.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | **70%** | TP cluster is large; Ship Review by Fri is the gating event — Project bumped above 60% target. |
| AOR | **10%** | Light week — two CI-failing-on-main tasks need triage; otherwise PRs pending review. |
| Career | **15%** | Above 5% floor: 1:1 skipped but Project Advisor draft is overdue per career-notes. |
| Strategy | **5%** | Windows AOT delivery plan response to Ivy/Mark — a strategic comment, not a project deliverable. |
### Shape
**Mon 06-01:** Ramp + ship the 0.5d's
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457) (recurring, today)
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — start; due today
- [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — overdue 4d; PR #5145 has CI failing → fix CI first, then merge
- [PR Check is failing on main](https://app.asana.com/0/0/1215264800186724) — Sam has a PR up overnight; confirm if green and close, otherwise unblock
- Set 1-Must for today
**Tue 06-02:** Onboarding cluster + strategic comment
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987) (recurring)
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — continue / finish
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 approved → merge
- **Strategy:** Reply on [Desktop Browsers: Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy responded Sat; Alex's two earlier comments need follow-up before Ivy "picks it up Mon/Tue as TP"
**Wed 06-03:** Ship Review prep
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364) (recurring)
- [Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 waiting review → push for review
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — start
- Triage CI-failing-on-main tasks (1213975496167929, 1214797526093576)
**Thu 06-04:** Close loops; cover PR review backlog
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — finish
- Clear GitHub review-requested queue (6 PRs pending Alex's review)
- Verify SR scope: [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — ensure subtasks listed
**Fri 06-05:** Ship Review day + retro + career
- [iOS Address onboarding conflicts...](https://app.asana.com/0/0/1214592943696234) — Ship Review milestone (project due today)
- [DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261) — close out async DRI sync
- **Career action** — Draft Part 1 of Advisor Readiness doc (see Career Action below)
- Write weekly retrospective (note: Dominik OOO → no 1:1 prep needed)
- WWDC AFK starts Mon Jun 8 — write handoff comment on TP cluster if Persist or Try Visiting slip
### Must-Not-Forget
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (overdue 4d) — PR #5145 CI is red; this is the bottleneck for the AI onboarding ship. Alex needs to fix the failing job before merge can happen.
- [ ] **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
due 2026-05-28 (overdue 4d) — PR #5149 is **approved**; merge today/Tue to clear from the cluster. Alessandro asked "let me know when the PR is ready for another look" on the related task.
- [ ] **[Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
due 2026-05-29 (overdue 3d) — PR #5173 ⏳ waiting review; ping reviewers Mon.
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 (today) — biggest unstarted TP-cluster item; protect Mon/Tue for it. Will need draft PR by EOW for SR Fri.
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (overdue 5d) — Diego's comment Sat: "last Big Sur version releases Jun 8, Monterey+ version merges next week, public release Jun 15." Alex's PR is on the critical path.
### AOR Quick Wins This Week
<!-- Quick-actionable overdue tasks (<2h each). Schedule in gap days. -->
- **[PR Check is failing on main - testWhenTab...errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
overdue 40 days — CI failing test on main; investigate flake vs real regression, disable or fix.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 17 days — second CI failing task; likely related or a flake batch.
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
overdue 4 days — PR #4663 is already up (draft); review and promote out of draft.
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
due 2026-04-24 (do_later section but flagged today) — feature flag cleanup; quick win if related ship is shipped.
### Sprint Backlog (pick 12 if time allows)
<!-- Mid-age overdue assigned tasks (14-180 days). -->
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (31d overdue) — Internal Product Feedback inbox; likely AOR-touching.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (31d overdue) — Internal Product Feedback; PR #4630 already up addressing similar (cross-domain from pinned).
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (125d overdue) — meta task, 5min to read & either close or schedule.
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 (257d overdue) — pixel investigation; verify still relevant before working.
(+ 3 aged items >180 days in backlog — not listed: tab preview stuck 412d, Duo login Grafana 313d, Assertion Pixel 257d.)
### On Radar
<!-- Non-assigned items touching Alex's AOR or work. -->
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: SR completed, last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's "Make Monterrey-only" PR is on this critical path — keep in sync.
- **[SIGKILL inside MainViewController chrome bar reveal animation](https://app.asana.com/0/0/1215224247451374)** — Eduardo Pinto added defensive weak captures; Sentry/crash AOR touchpoint, monitor merge.
- **[CEF: Failing tests when 'setTabTitlesEarly' is enabled](https://app.asana.com/0/0/1214378030768173)** — Kris Wright zeroing in on root cause; touches `OnDocumentTitleChanged`. Monitor; engage if it blocks Apple work.
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged missing `site_loading_performance` pixel on macOS. AOR-adjacent, monitor.
### Career Action This Week
**Picked: Draft Part 1 of Advisor Readiness doc (30 min) — task already exists: [Readiness Self-Reflection for Potential Project Advisor - Alex M](https://app.asana.com/0/0/1210386994396212).**
Why this one (priority 1 from career-notes):
- Project Advisor is the **single most direct EP3 lever** identified in the 2026-02 review.
- Status in career-notes: "Not started" — and the task has been sitting since Feb.
- 1:1 prep (priority 5) is moot — Dominik OOO all week.
- Calibration follow-up with Christie (priority 3) deferred — better raised at next 1:1 once Dominik is back (week of Jun 15).
- Strategic visibility (priority 4) is partially covered already this week by the Windows AOT comment (under Strategy quadrant).
**Concrete deliverable**: 30-min block Fri afternoon — write Part 1 of the self-reflection doc (one project I'd be a strong advisor on, why, what unique perspective I bring). Don't polish; goal is to break the "not started" state.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
Ivy + Mark replied Sat to Alex's two pushback comments ("spinning off another project without discussing... I don't get how this is different"). Ivy: "your plan is the foundation for this... I plan to pick it up Mon/Tue as my next top priority." **Engage Mon/Tue** with substantive reply — this is a scoping decision Alex wanted to influence; silence reads as acquiescence.
- **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)**
Ivy proposed setting up a perf test using Boli's framework. Touches macOS perf AOR adjacent — **monitor**; engage if Apple team input requested.
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
Boli asked Bulcsu about isolated worlds on new native script injection APIs; CPM-related discussion. **Monitor**; not Apple-side.
### Carried Forward from Last Week
No prior weekly review exists — nothing to carry forward formally. The closest equivalents are:
- **[Cursor integration: configure VSCode support](https://app.asana.com/0/0/1209808486380252)** — assignee: Alex
In `active` section, last modified 2026-05-06; not advanced in 3+ weeks. Decide: pick up or move to `do_later`.
- **[GH Workflow Failure - UI Tests](https://app.asana.com/0/0/1213729659282440)** — assignee: Alex
In `active` section, last modified 2026-03-20; very stale. Decide: still relevant? Close or revive.
- **[UI Tests refinement](https://app.asana.com/0/0/1210056873095697)** — assignee: Alex
In `active` section, last modified 2026-02-11; almost certainly stale. Status decision needed.
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214339792109087)** — possibly deleted (per snapshot ⚠️) — flagged for verification; do not act until confirmed. Current active agenda task is gid 1214933759913756 (due 2026-05-26).
---
*Based on DB state as of 2026-06-01 (no prior weekly review available). Sync freshness: 2026-06-01 01:01 UTC.*