2026-06-01 daily brief

This commit is contained in:
Alexey Martemyanov
2026-06-01 07:06:04 +06:00
parent dd76975725
commit 27ce93a5a8
2 changed files with 246 additions and 0 deletions
+96
View File
@@ -0,0 +1,96 @@
---
## Daily Brief — 2026-06-01
### ✨ Morning
On June 1st 1980, CNN launched as the world's first 24-hour news channel — and Pac-Man hit North American arcades — both on the same Monday. Two machines engineered for continuous human attention, born together.
💧 Start with a glass of water.
_No weekly plan found for 2026-06-01 — brief derived from DB state only. New signals since Friday: 3 task changes (1 completed: PR Check on main via Sam S fix), 1 new comment._
---
## Plan for Today
1. ⚡ Fill out [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5 min, anonymous, overdue 5d
2. 🔴 Merge PR #5149 — Hide Free Plan in onboarding (CI ✅, review ✅ — just needs merge)
3. 🔴 Fix CI on PR #5145 — Ship AI onboarding winner; CI failing
4. 🔴 Start [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950) [2d] — top_priority, due today
5. 🟠 Start [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) [1d] — due today
6. 🟠 Respond to [DRI <> Project Advisor async — Demo tracker blocking](https://app.asana.com/0/0/1213551072611261)
7. 🟠 6 GitHub review requests — batch after TP block
8. 📅 O-L Weekly Meeting — today
---
### 🔴 Urgent / Overdue
**[OVERDUE +3d] [DRI] — [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) [0.5d]**
Context: Due 2026-05-28. PR #5149 has ✅ CI and ✅ review — fully unblocked.
Action: Merge PR #5149.
**[OVERDUE +3d] [DRI] — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158957) [0.5d]**
Context: Due 2026-05-28. PR #5145 has 🔴 CI.
Action: Fix CI failures on PR #5145 and merge.
**[OVERDUE +2d] [DRI] — [Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954) [0.5d]**
Context: Due 2026-05-29. PR #5173 has ✅ CI, awaiting reviewer response.
Action: Ping reviewer to unblock.
**[OVERDUE +40d] [DRI] — [PR Check is failing on main (CI)](https://app.asana.com/0/0/1213975496167929)**
Context: Due 2026-04-22. Sam S has an overnight fix PR succeeding in almost every run. New comment today.
Action: Review Sam's fix PR; close this task once merged.
**[OVERDUE +5d] [DRI] — [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916) [1-3d]**
Context: Due 2026-05-27, inbox. No recent activity.
Action: Start implementation or confirm if blocked/descoped.
**Backlog cluster** (stale inbox/planning — informational, not blocking today):
Tab preview stuck (due 2025-04-15), Duo login Grafana (due 2025-07-23), Pinned tab opens link in background (due 2026-05-01), Text selection address bar (due 2026-05-01), PR Check gid:1214797526093576 (due 2026-05-15), Assertion Failure Pixel Anomaly (due 2025-09-17), Review Overdue Tasks Summary (due 2026-01-27).
---
### 🟠 Needs Action Today
**[DUE TODAY] [DRI] — [Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950) [2d]**
Context: top_priority, due today, modified yesterday — active task starting today.
Action: Begin implementation.
**[DUE TODAY] [DRI] — [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) [1d]**
Context: Inbox, due today, modified yesterday.
Action: Start work.
**[DRI-async] — [DRI <> Project Advisor async for Demo tracker blocking](https://app.asana.com/0/0/1213551072611261)**
Context: macOS Release Board, inbox, modified 2026-05-29. Alex is DRI; needs response.
Action: Check async thread and respond.
**PR Reviews — batch** (6 review requests queued — batch after TP block):
- Bump nativeStorage rollout to 100% [privacy-configuration]
- Enable ad blocking feature availability — soft launch [privacy-configuration]
- [macOS] Improve value transformer failure observability [apple-browsers]
- [macOS] Avoid force unwrap crash when calling debugDescription [apple-browsers]
- Fix maestro tests [apple-browsers]
- Enable iPad toggle for iOS 7.211 [privacy-configuration]
---
### 🟡 Delegated — Follow Up Needed
**[OVERDUE +11d] — [Privacy Triage: Apple - iOS: Demo tracker blocking](https://app.asana.com/0/0/1214965405681675)** → Jake Abel
Context: Due 2026-05-21. No update since 2026-05-20.
Action: Ping Jake — triage complete? Can close?
**[OVERDUE +7d] — [🤖 Check for dependabot PRs](https://app.asana.com/0/0/1215057989642782)** → Tom Strba
Context: Due 2026-05-25. Part of maintenance rotation.
Action: Verify Tom completed; follow up if not.
---
### 🔵 Rhythms
**TP**: iOS Duck.ai onboarding cluster — 5 active tasks in top_priority (iOS Release Board + O-N Meta). Multiple 0.5d tasks overdue since last week. TP is ~1 week old — not stale. Clear the quick tasks (merge/CI-fix) first, then pick up the [2d] work.
Upcoming:
- **Today**: O-L Weekly Meeting
- **Tue Jun 2**: Apple Weekly Team Meeting
- **Wed Jun 3**: O-N Weekly Meeting
- **Jun 812**: WWDC — Alex partly AFK. Prep any handoffs before end of this week.
+150
View File
@@ -0,0 +1,150 @@
# Weekly Plan
---
## Weekly Plan — Week of 2026-06-01
**Note**: No prior weekly review file found (`weekly/` directory was empty). This plan is seeded from current Asana state, not from a Friday review setup. Subsequent weeks will reference the prior review.
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella project task due Fri 2026-06-05; four sub-tasks in `top_priority` (Persist dialogue [2d], Hide Free Plan, Hide stop button, Ship AI onboarding winner) all converge on this; Ship Review task (1215009192158961) is already created and downstream. This is the visible deliverable for the week.
**Career Advisor status**: Dominik OOO entire week (LDX3 Jun 1-3 + Public Holiday Jun 4-5). **1:1 SKIPPED.** Next likely 1:1 window is bi-weekly cadence after Jun 8 — but Alex is partly AFK for WWDC'26 Jun 8-12. Realistic next 1:1: week of Jun 15.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | **70%** | TP cluster is large; Ship Review by Fri is the gating event — Project bumped above 60% target. |
| AOR | **10%** | Light week — two CI-failing-on-main tasks need triage; otherwise PRs pending review. |
| Career | **15%** | Above 5% floor: 1:1 skipped but Project Advisor draft is overdue per career-notes. |
| Strategy | **5%** | Windows AOT delivery plan response to Ivy/Mark — a strategic comment, not a project deliverable. |
### Shape
**Mon 06-01:** Ramp + ship the 0.5d's
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457) (recurring, today)
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — start; due today
- [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — overdue 4d; PR #5145 has CI failing → fix CI first, then merge
- [PR Check is failing on main](https://app.asana.com/0/0/1215264800186724) — Sam has a PR up overnight; confirm if green and close, otherwise unblock
- Set 1-Must for today
**Tue 06-02:** Onboarding cluster + strategic comment
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987) (recurring)
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — continue / finish
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 approved → merge
- **Strategy:** Reply on [Desktop Browsers: Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy responded Sat; Alex's two earlier comments need follow-up before Ivy "picks it up Mon/Tue as TP"
**Wed 06-03:** Ship Review prep
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364) (recurring)
- [Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 waiting review → push for review
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — start
- Triage CI-failing-on-main tasks (1213975496167929, 1214797526093576)
**Thu 06-04:** Close loops; cover PR review backlog
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — finish
- Clear GitHub review-requested queue (6 PRs pending Alex's review)
- Verify SR scope: [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — ensure subtasks listed
**Fri 06-05:** Ship Review day + retro + career
- [iOS Address onboarding conflicts...](https://app.asana.com/0/0/1214592943696234) — Ship Review milestone (project due today)
- [DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261) — close out async DRI sync
- **Career action** — Draft Part 1 of Advisor Readiness doc (see Career Action below)
- Write weekly retrospective (note: Dominik OOO → no 1:1 prep needed)
- WWDC AFK starts Mon Jun 8 — write handoff comment on TP cluster if Persist or Try Visiting slip
### Must-Not-Forget
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (overdue 4d) — PR #5145 CI is red; this is the bottleneck for the AI onboarding ship. Alex needs to fix the failing job before merge can happen.
- [ ] **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
due 2026-05-28 (overdue 4d) — PR #5149 is **approved**; merge today/Tue to clear from the cluster. Alessandro asked "let me know when the PR is ready for another look" on the related task.
- [ ] **[Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
due 2026-05-29 (overdue 3d) — PR #5173 ⏳ waiting review; ping reviewers Mon.
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 (today) — biggest unstarted TP-cluster item; protect Mon/Tue for it. Will need draft PR by EOW for SR Fri.
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (overdue 5d) — Diego's comment Sat: "last Big Sur version releases Jun 8, Monterey+ version merges next week, public release Jun 15." Alex's PR is on the critical path.
### AOR Quick Wins This Week
<!-- Quick-actionable overdue tasks (<2h each). Schedule in gap days. -->
- **[PR Check is failing on main - testWhenTab...errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
overdue 40 days — CI failing test on main; investigate flake vs real regression, disable or fix.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 17 days — second CI failing task; likely related or a flake batch.
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
overdue 4 days — PR #4663 is already up (draft); review and promote out of draft.
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
due 2026-04-24 (do_later section but flagged today) — feature flag cleanup; quick win if related ship is shipped.
### Sprint Backlog (pick 12 if time allows)
<!-- Mid-age overdue assigned tasks (14-180 days). -->
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (31d overdue) — Internal Product Feedback inbox; likely AOR-touching.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (31d overdue) — Internal Product Feedback; PR #4630 already up addressing similar (cross-domain from pinned).
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (125d overdue) — meta task, 5min to read & either close or schedule.
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 (257d overdue) — pixel investigation; verify still relevant before working.
(+ 3 aged items >180 days in backlog — not listed: tab preview stuck 412d, Duo login Grafana 313d, Assertion Pixel 257d.)
### On Radar
<!-- Non-assigned items touching Alex's AOR or work. -->
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: SR completed, last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's "Make Monterrey-only" PR is on this critical path — keep in sync.
- **[SIGKILL inside MainViewController chrome bar reveal animation](https://app.asana.com/0/0/1215224247451374)** — Eduardo Pinto added defensive weak captures; Sentry/crash AOR touchpoint, monitor merge.
- **[CEF: Failing tests when 'setTabTitlesEarly' is enabled](https://app.asana.com/0/0/1214378030768173)** — Kris Wright zeroing in on root cause; touches `OnDocumentTitleChanged`. Monitor; engage if it blocks Apple work.
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged missing `site_loading_performance` pixel on macOS. AOR-adjacent, monitor.
### Career Action This Week
**Picked: Draft Part 1 of Advisor Readiness doc (30 min) — task already exists: [Readiness Self-Reflection for Potential Project Advisor - Alex M](https://app.asana.com/0/0/1210386994396212).**
Why this one (priority 1 from career-notes):
- Project Advisor is the **single most direct EP3 lever** identified in the 2026-02 review.
- Status in career-notes: "Not started" — and the task has been sitting since Feb.
- 1:1 prep (priority 5) is moot — Dominik OOO all week.
- Calibration follow-up with Christie (priority 3) deferred — better raised at next 1:1 once Dominik is back (week of Jun 15).
- Strategic visibility (priority 4) is partially covered already this week by the Windows AOT comment (under Strategy quadrant).
**Concrete deliverable**: 30-min block Fri afternoon — write Part 1 of the self-reflection doc (one project I'd be a strong advisor on, why, what unique perspective I bring). Don't polish; goal is to break the "not started" state.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
Ivy + Mark replied Sat to Alex's two pushback comments ("spinning off another project without discussing... I don't get how this is different"). Ivy: "your plan is the foundation for this... I plan to pick it up Mon/Tue as my next top priority." **Engage Mon/Tue** with substantive reply — this is a scoping decision Alex wanted to influence; silence reads as acquiescence.
- **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)**
Ivy proposed setting up a perf test using Boli's framework. Touches macOS perf AOR adjacent — **monitor**; engage if Apple team input requested.
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
Boli asked Bulcsu about isolated worlds on new native script injection APIs; CPM-related discussion. **Monitor**; not Apple-side.
### Carried Forward from Last Week
No prior weekly review exists — nothing to carry forward formally. The closest equivalents are:
- **[Cursor integration: configure VSCode support](https://app.asana.com/0/0/1209808486380252)** — assignee: Alex
In `active` section, last modified 2026-05-06; not advanced in 3+ weeks. Decide: pick up or move to `do_later`.
- **[GH Workflow Failure - UI Tests](https://app.asana.com/0/0/1213729659282440)** — assignee: Alex
In `active` section, last modified 2026-03-20; very stale. Decide: still relevant? Close or revive.
- **[UI Tests refinement](https://app.asana.com/0/0/1210056873095697)** — assignee: Alex
In `active` section, last modified 2026-02-11; almost certainly stale. Status decision needed.
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214339792109087)** — possibly deleted (per snapshot ⚠️) — flagged for verification; do not act until confirmed. Current active agenda task is gid 1214933759913756 (due 2026-05-26).
---
*Based on DB state as of 2026-06-01 (no prior weekly review available). Sync freshness: 2026-06-01 01:01 UTC.*