Files
obsidian-vault/work/briefs/daily/2026-06-01.md
T

97 lines
4.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-06-01
### ✨ Morning
On June 1st 1980, CNN launched as the world's first 24-hour news channel — and Pac-Man hit North American arcades — both on the same Monday. Two machines engineered for continuous human attention, born together.
💧 Start with a glass of water.
_No weekly plan found for 2026-06-01 — brief derived from DB state only. New signals since Friday: 3 task changes (1 completed: PR Check on main via Sam S fix), 1 new comment._
---
## Plan for Today
1. ⚡ Fill out [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5 min, anonymous, overdue 5d
2. 🔴 Merge PR #5149 — Hide Free Plan in onboarding (CI ✅, review ✅ — just needs merge)
3. 🔴 Fix CI on PR #5145 — Ship AI onboarding winner; CI failing
4. 🔴 Start [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950) [2d] — top_priority, due today
5. 🟠 Start [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) [1d] — due today
6. 🟠 Respond to [DRI <> Project Advisor async — Demo tracker blocking](https://app.asana.com/0/0/1213551072611261)
7. 🟠 6 GitHub review requests — batch after TP block
8. 📅 O-L Weekly Meeting — today
---
### 🔴 Urgent / Overdue
**[OVERDUE +3d] [DRI] — [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) [0.5d]**
Context: Due 2026-05-28. PR #5149 has ✅ CI and ✅ review — fully unblocked.
Action: Merge PR #5149.
**[OVERDUE +3d] [DRI] — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158957) [0.5d]**
Context: Due 2026-05-28. PR #5145 has 🔴 CI.
Action: Fix CI failures on PR #5145 and merge.
**[OVERDUE +2d] [DRI] — [Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954) [0.5d]**
Context: Due 2026-05-29. PR #5173 has ✅ CI, awaiting reviewer response.
Action: Ping reviewer to unblock.
**[OVERDUE +40d] [DRI] — [PR Check is failing on main (CI)](https://app.asana.com/0/0/1213975496167929)**
Context: Due 2026-04-22. Sam S has an overnight fix PR succeeding in almost every run. New comment today.
Action: Review Sam's fix PR; close this task once merged.
**[OVERDUE +5d] [DRI] — [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916) [1-3d]**
Context: Due 2026-05-27, inbox. No recent activity.
Action: Start implementation or confirm if blocked/descoped.
**Backlog cluster** (stale inbox/planning — informational, not blocking today):
Tab preview stuck (due 2025-04-15), Duo login Grafana (due 2025-07-23), Pinned tab opens link in background (due 2026-05-01), Text selection address bar (due 2026-05-01), PR Check gid:1214797526093576 (due 2026-05-15), Assertion Failure Pixel Anomaly (due 2025-09-17), Review Overdue Tasks Summary (due 2026-01-27).
---
### 🟠 Needs Action Today
**[DUE TODAY] [DRI] — [Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950) [2d]**
Context: top_priority, due today, modified yesterday — active task starting today.
Action: Begin implementation.
**[DUE TODAY] [DRI] — [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) [1d]**
Context: Inbox, due today, modified yesterday.
Action: Start work.
**[DRI-async] — [DRI <> Project Advisor async for Demo tracker blocking](https://app.asana.com/0/0/1213551072611261)**
Context: macOS Release Board, inbox, modified 2026-05-29. Alex is DRI; needs response.
Action: Check async thread and respond.
**PR Reviews — batch** (6 review requests queued — batch after TP block):
- Bump nativeStorage rollout to 100% [privacy-configuration]
- Enable ad blocking feature availability — soft launch [privacy-configuration]
- [macOS] Improve value transformer failure observability [apple-browsers]
- [macOS] Avoid force unwrap crash when calling debugDescription [apple-browsers]
- Fix maestro tests [apple-browsers]
- Enable iPad toggle for iOS 7.211 [privacy-configuration]
---
### 🟡 Delegated — Follow Up Needed
**[OVERDUE +11d] — [Privacy Triage: Apple - iOS: Demo tracker blocking](https://app.asana.com/0/0/1214965405681675)** → Jake Abel
Context: Due 2026-05-21. No update since 2026-05-20.
Action: Ping Jake — triage complete? Can close?
**[OVERDUE +7d] — [🤖 Check for dependabot PRs](https://app.asana.com/0/0/1215057989642782)** → Tom Strba
Context: Due 2026-05-25. Part of maintenance rotation.
Action: Verify Tom completed; follow up if not.
---
### 🔵 Rhythms
**TP**: iOS Duck.ai onboarding cluster — 5 active tasks in top_priority (iOS Release Board + O-N Meta). Multiple 0.5d tasks overdue since last week. TP is ~1 week old — not stale. Clear the quick tasks (merge/CI-fix) first, then pick up the [2d] work.
Upcoming:
- **Today**: O-L Weekly Meeting
- **Tue Jun 2**: Apple Weekly Team Meeting
- **Wed Jun 3**: O-N Weekly Meeting
- **Jun 812**: WWDC — Alex partly AFK. Prep any handoffs before end of this week.