Files
obsidian-vault/work/briefs/weekly/plan-2026-05-18.md
T

123 lines
9.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan — Week of 2026-05-25
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — confirmed next TP per Alex's own comment (May/22); current TP (Demo tracker) wraps Monday with one PR review pass + handoff to Alessandro.
The project starts May/25. Both kick-off slots are taken; Alex proposed running kick-off async to Dominik on May/22 — pending response. Wed/27 is AFK (public holiday) so effective week is 4 days. Tension points: design assets ([Animated Assets gid:1214627423981798](https://app.asana.com/0/0/1214627423981798) due 2026-05-28), three sub-deliverables created (Hide Free plan, Hide stop-chat, Disable back button), and dependency on shipping AI onboarding winner (Treatment B).
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 65% | New TP starts May/25; Wed AFK shortens to 4 days. Animated assets due Thu. |
| AOR | 10% | Light AOR week — overdue CI failing-test PR check + standalone bug triage only. |
| Career | 20% | 1:1 with Dominik on Tue (he is NOT OOO — next AFK is June 3+). Empty 1:1 agenda needs prep. Project Advisor doc is highest-leverage EP3 action. |
| Strategy | 5% | Monitor O-L/O-N Assessments; one comment if a relevant TD lands. |
### Shape
**Mon May/25:** Ramp-up + close current TP
- [Alex M next Top Priority (May/25)](https://app.asana.com/0/0/1215058019347550) — close once new TP is set
- [PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350) — review pass per Friday commit; answer Alessandro's toggle-visibility question; reassign to Alessandro
- [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) — wrap up; verify Privacy Triage (Jake Abel)
- O-N Weekly Meeting (gid:1214950287303110)
- O-L Weekly Meeting (gid:1214908681776067) — Dominik is host; light agenda
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — due today
- [Disable back button during duck.ai onboarding [1d]](https://app.asana.com/0/0/1215009192158960) — delegated subtask, monitor
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — delegated subtask, monitor
**Tue May/26:** New TP kick-off + 1:1 with Dominik
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — async kick-off (if Dominik confirms); scope the three sub-deliverables
- [Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756) — agenda is empty; populate before meeting
- Apple Weekly Team Meeting (gid:1214929922983741)
- [PR: Simplify tab access in TabBarViewController](https://app.asana.com/0/0/1215059168411571) — review/finalize
- [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min, knock out
**Wed May/27:** AFK — Public Holiday
- [Alex M AFK May/27, Wed (holiday)](https://app.asana.com/0/0/1212694796293421)
**Thu May/28:** Deep work on TP + design hand-off
- [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due today; coordinate with design
- [Persist 'You've got this' dialogue in non-focused state [0.5d]](https://app.asana.com/0/0/1215009192158950) — was due Tue, slipped past AFK
- [PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929) — address if PR work allows
**Fri May/29:** Close loops + weekly review + maintenance handoff
- macOS Maintenance week-close (handover comment, feedback, mark complete) — delegated maintenance week ends today
- Weekly review write-up
- Next-week prep (June 1-5: Dominik AFK June 1-3 + June 4-5 — verify 1:1 cadence)
### Must-Not-Forget
- [ ] **[PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350)** — assignee: Alex
Alex committed Friday to "review pass on Monday and assign to Alessandro"; Alessandro is waiting on Alex's response to the toggle-visibility question (May/22). Blocks current TP closure.
- [ ] **[iOS Address onboarding conflicts with unified input…](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
TP starts Mon May/25 — kick-off slots both taken; Alex asked Dominik for async kick-off approval May/22 and has not heard back. If no response by Mon AM, ping again or proceed async.
- [ ] **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — assignee: Alex
due 2026-05-26 — agenda is empty (no items posted since duplication May/19). Populate before Tue 1:1.
- [ ] **[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)** — assignee: Alex
due 2026-05-28 — protect Thu after AFK Wed; coordinate with design ahead of time.
- [ ] **[PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)** — assignee: Alex
31 days overdue, blocks CI quality. Address mid-week if TP allows; otherwise carry forward.
### AOR Quick Wins This Week
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
overdue 22 days — Internal Product Feedback bug; likely small repro + fix scope.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
overdue 22 days — Internal Product Feedback; likely 1-2h investigation.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 8 days — CI failing-tests inbox; investigate failure mode.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 — flaky/failing CI test, 31d overdue.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 — 116d overdue; meta-triage task.
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 — 248d overdue; needs close-or-fix decision.
(+ 2 aged items >180 days in backlog — not listed)
### On Radar
- **TD: Monthly pixels for iOS and macOS** ([gid:1214950124367781](https://app.asana.com/0/0/1214950124367781)) — Jonathan returning to monthly pixel approach with new ATB analysis (May/23). Touches pixel infrastructure Alex has shipped against. Watch for direct ask.
- **Elevated visible tab crashes on 158.2** ([gid:1215003880609879](https://app.asana.com/0/0/1215003880609879)) — Kris posted UAF hotfix update; touches Sentry/crash reporting AOR (Alex's secondary). Engage if hotfix needs macOS input.
- **Internal product feedback form broken** ([gid:1214820313616334](https://app.asana.com/0/0/1214820313616334)) — Samantha posted PR up; not Alex's, but feeds Alex's Internal Product Feedback inbox.
### Career Action This Week
**Draft Part 1 of Advisor Readiness doc (30 min)** — priority #1 from career-notes.md. Project Advisor is the most direct lever for EP3 visibility this cycle and is currently "Not started" in the DB. Other items deferred: Primary AOR target → discuss at 1:1 as agenda item (not separate action); Christie EP2/3 calibration → confirm in same 1:1; Assessment visibility → no active O-N/O-L Assessment requiring a comment this week. Time-box: Mon or Thu afternoon, 30 min, doc gid:1210386994396212.
### On Radar / Participation Needed
- **[Address Universal Input (UTI) issues](https://app.asana.com/0/0/1214965000075517)** — Alex stated May/22 he is currently completing this. Wrap up before Tue if it spans into new TP, otherwise carry into TP's first sub-task. Status check needed Mon AM.
### Carried Forward from Last Week
- **[iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** — assignee: Alex
Current TP, 1d overdue (due 2026-05-22). PR open and under review with Alessandro. → see TP section above for closure path.
- **[Address Universal Input (UTI) issues](https://app.asana.com/0/0/1214965000075517)** — assignee: Alex
Alex's May/22 comment indicates this is the gap-filler before new TP starts. Confirm done on Mon.
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
Async coordination task for current TP; close once TP closes.
- **[PR: Simplify tab access in TabBarViewController](https://app.asana.com/0/0/1215059168411571)** — assignee: Alex
due 2026-05-27 (slips to AFK day) — push to Tue.
- **[PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350)** — assignee: Alex
due 2026-05-26 — see Must-Not-Forget; explicit Monday commitment.
- **[Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
due 2026-05-21 (overdue) — blocks Demo tracker ship; ping Jake on Mon if no movement.
---
*Based on snapshot 2026-05-23 01:31 UTC + DB state as of 2026-05-23. Weekly review file for 2026-05-22 not present (briefs/weekly/ directory created fresh); plan built from Asana snapshot + career-notes + recurring-rhythms.*
*Note: User-supplied MONDAY_DATE=2026-05-18 appears off — plan covers forward-looking week of 2026-05-25 (the actual upcoming Monday from Sat 2026-05-23). Saved as `plan-2026-05-25.md`.*