[2026-05-23] briefs: daily 2026-05-23, weekly plans 2026-05-18 and 2026-05-25

This commit is contained in:
Alexey Martemyanov
2026-05-23 08:00:33 +06:00
parent 7bec38176d
commit 21602372ab
3 changed files with 310 additions and 0 deletions
+63
View File
@@ -0,0 +1,63 @@
---
## Daily Brief — 2026-05-23 (Saturday)
### ✨ Morning
On this day in 1995, Sun officially unveiled Java at SunWorld — a language whose "write once, run anywhere" pitch survived 30 years of platform wars and is still running everything from Minecraft to half the world's enterprise stack. ☕
🚶 Take a short walk before diving in.
## Plan for Today
1. ⚡ Close [Alex M next Top Priority (May/25)](https://app.asana.com/0/0/1215058019347550) — comment already posted yesterday identifying [iOS Address onboarding](https://app.asana.com/0/0/1214592943696234) as next TP; task is a placeholder, ready to close (~30s).
2. 🟠 [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min anonymous timebox, due Tue. Knock out over coffee.
3. 🔵 Populate [Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756) — agenda is empty, Tue 1:1 needs it. Drop in: Project Advisor doc Part 1 status, Primary AOR target, EP2/3 calibration ask.
It's Saturday — everything else carries to Monday. Anchor for Mon: review pass on Demo tracker PR + assign to Alessandro; close current TP; start ramp-up on new TP.
---
### 🔴 Urgent / Overdue
- **MONITORING [DRI]** — [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) (current TP, 1d overdue)
Context: PR review pass committed for Monday; Alessandro posted toggle-visibility question Fri (May/22) that Alex needs to answer on review pass.
Action: Monday — answer toggle question on [PR task](https://app.asana.com/0/0/1214425079182350), do review pass, reassign to Alessandro.
- **NEEDS ACTION [AUTHOR]** — [Full Analysis](https://app.asana.com/0/0/1214900901154134) (1d overdue, security postmortem writeup)
Context: Alex's own writeup of the Hermes/Security Triage AI postmortem; due Fri, no new activity since.
Action: Finalize or set a new due date — currently stale at 1d overdue but writeup is Alex's responsibility.
- **STALLED [DRI]** — [PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929) (31d overdue, active)
Context: Failing CI test on main; no activity since 2026-05-13. Carry-forward from weekly plan as mid-week slot if TP allows.
Action: Mon or Thu — investigate flake vs. real failure, post triage note.
- **Backlog cluster (informational)** — 6 items in inbox/planning >90d overdue (Pinned tab opens link in background, Text selection in address bar, Duo login to Grafana, Bug: Tab preview stuck around, Assertion Failure Pixel Anomaly, Review Overdue Tasks Summary). Plan calls 2 of them out as AOR Quick Wins this week — pick 1 if TP rhythm has slack.
### 🟠 Needs Action Today
None — Saturday. Monday batch awaits:
- **PR Reviews (REVIEWER)** — 12 review requests + mentions queued on GitHub (apple-browsers, privacy-configuration). Batch after Mon TP block; see `asana_context.md` for full list.
### 🟡 Delegated — Follow Up Needed
- **OVERDUE [DRI-via-delegate]** — [Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675) — Jake Abel, due 2026-05-21 (2d overdue)
Blocks current TP closure. Suggest Monday: *"Hey Jake, friendly nudge on this — TP is wrapping Monday and Privacy Triage is the last gate. Anything I can clarify or unblock?"*
- **OVERDUE [DRI-via-delegate]** — [Pinned tab activates in other window unpinning](https://app.asana.com/0/0/1210705465887828) — Juan Pereira, due 2026-05-22 (1d overdue)
Bug task; Monday check-in if no movement.
(121 open delegated tasks total — most without due dates. No GitHub merged-but-not-closed correlation flags this morning ✅)
### 🔵 Rhythms
**TP**: [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) — wrapping Mon (PR review pass + handoff to Alessandro). Next TP Thread open ✅ ([iOS Address onboarding](https://app.asana.com/0/0/1214592943696234) announced via [placeholder comment](https://app.asana.com/0/0/1215058019347550) May/22). Not stale.
**Rotations**: None active. macOS Maintenance week closed Fri; week of May/25 handed to Tom Strba.
**Upcoming this week** (Mon May/25 → Fri May/29):
- **Tue May/26** — 1:1 with Dominik (agenda empty, populate by Mon EOD); Apple Weekly Team Meeting.
- **Wed May/27** — AFK (public holiday). 4-day effective week.
- **Thu May/28** — [Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) due; protect post-AFK for design coordination.
- **Fri May/29** — macOS Maintenance week-close (handover from Tom); weekly review.
- **Career action**: Draft Part 1 of [Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) — 30 min slot Mon or Thu PM (per weekly plan).
---
*Brief derived from weekly plan (plan-2026-05-25.md) + asana_context.md snapshot (2026-05-23 01:31 UTC). No yesterday brief on file (plan-2026-05-18 also absent); briefs/ chain effectively starts here.*
+122
View File
@@ -0,0 +1,122 @@
# Weekly Plan — Week of 2026-05-25
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — confirmed next TP per Alex's own comment (May/22); current TP (Demo tracker) wraps Monday with one PR review pass + handoff to Alessandro.
The project starts May/25. Both kick-off slots are taken; Alex proposed running kick-off async to Dominik on May/22 — pending response. Wed/27 is AFK (public holiday) so effective week is 4 days. Tension points: design assets ([Animated Assets gid:1214627423981798](https://app.asana.com/0/0/1214627423981798) due 2026-05-28), three sub-deliverables created (Hide Free plan, Hide stop-chat, Disable back button), and dependency on shipping AI onboarding winner (Treatment B).
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 65% | New TP starts May/25; Wed AFK shortens to 4 days. Animated assets due Thu. |
| AOR | 10% | Light AOR week — overdue CI failing-test PR check + standalone bug triage only. |
| Career | 20% | 1:1 with Dominik on Tue (he is NOT OOO — next AFK is June 3+). Empty 1:1 agenda needs prep. Project Advisor doc is highest-leverage EP3 action. |
| Strategy | 5% | Monitor O-L/O-N Assessments; one comment if a relevant TD lands. |
### Shape
**Mon May/25:** Ramp-up + close current TP
- [Alex M next Top Priority (May/25)](https://app.asana.com/0/0/1215058019347550) — close once new TP is set
- [PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350) — review pass per Friday commit; answer Alessandro's toggle-visibility question; reassign to Alessandro
- [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) — wrap up; verify Privacy Triage (Jake Abel)
- O-N Weekly Meeting (gid:1214950287303110)
- O-L Weekly Meeting (gid:1214908681776067) — Dominik is host; light agenda
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — due today
- [Disable back button during duck.ai onboarding [1d]](https://app.asana.com/0/0/1215009192158960) — delegated subtask, monitor
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — delegated subtask, monitor
**Tue May/26:** New TP kick-off + 1:1 with Dominik
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — async kick-off (if Dominik confirms); scope the three sub-deliverables
- [Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756) — agenda is empty; populate before meeting
- Apple Weekly Team Meeting (gid:1214929922983741)
- [PR: Simplify tab access in TabBarViewController](https://app.asana.com/0/0/1215059168411571) — review/finalize
- [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min, knock out
**Wed May/27:** AFK — Public Holiday
- [Alex M AFK May/27, Wed (holiday)](https://app.asana.com/0/0/1212694796293421)
**Thu May/28:** Deep work on TP + design hand-off
- [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due today; coordinate with design
- [Persist 'You've got this' dialogue in non-focused state [0.5d]](https://app.asana.com/0/0/1215009192158950) — was due Tue, slipped past AFK
- [PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929) — address if PR work allows
**Fri May/29:** Close loops + weekly review + maintenance handoff
- macOS Maintenance week-close (handover comment, feedback, mark complete) — delegated maintenance week ends today
- Weekly review write-up
- Next-week prep (June 1-5: Dominik AFK June 1-3 + June 4-5 — verify 1:1 cadence)
### Must-Not-Forget
- [ ] **[PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350)** — assignee: Alex
Alex committed Friday to "review pass on Monday and assign to Alessandro"; Alessandro is waiting on Alex's response to the toggle-visibility question (May/22). Blocks current TP closure.
- [ ] **[iOS Address onboarding conflicts with unified input…](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
TP starts Mon May/25 — kick-off slots both taken; Alex asked Dominik for async kick-off approval May/22 and has not heard back. If no response by Mon AM, ping again or proceed async.
- [ ] **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — assignee: Alex
due 2026-05-26 — agenda is empty (no items posted since duplication May/19). Populate before Tue 1:1.
- [ ] **[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)** — assignee: Alex
due 2026-05-28 — protect Thu after AFK Wed; coordinate with design ahead of time.
- [ ] **[PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)** — assignee: Alex
31 days overdue, blocks CI quality. Address mid-week if TP allows; otherwise carry forward.
### AOR Quick Wins This Week
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
overdue 22 days — Internal Product Feedback bug; likely small repro + fix scope.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
overdue 22 days — Internal Product Feedback; likely 1-2h investigation.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 8 days — CI failing-tests inbox; investigate failure mode.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 — flaky/failing CI test, 31d overdue.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 — 116d overdue; meta-triage task.
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 — 248d overdue; needs close-or-fix decision.
(+ 2 aged items >180 days in backlog — not listed)
### On Radar
- **TD: Monthly pixels for iOS and macOS** ([gid:1214950124367781](https://app.asana.com/0/0/1214950124367781)) — Jonathan returning to monthly pixel approach with new ATB analysis (May/23). Touches pixel infrastructure Alex has shipped against. Watch for direct ask.
- **Elevated visible tab crashes on 158.2** ([gid:1215003880609879](https://app.asana.com/0/0/1215003880609879)) — Kris posted UAF hotfix update; touches Sentry/crash reporting AOR (Alex's secondary). Engage if hotfix needs macOS input.
- **Internal product feedback form broken** ([gid:1214820313616334](https://app.asana.com/0/0/1214820313616334)) — Samantha posted PR up; not Alex's, but feeds Alex's Internal Product Feedback inbox.
### Career Action This Week
**Draft Part 1 of Advisor Readiness doc (30 min)** — priority #1 from career-notes.md. Project Advisor is the most direct lever for EP3 visibility this cycle and is currently "Not started" in the DB. Other items deferred: Primary AOR target → discuss at 1:1 as agenda item (not separate action); Christie EP2/3 calibration → confirm in same 1:1; Assessment visibility → no active O-N/O-L Assessment requiring a comment this week. Time-box: Mon or Thu afternoon, 30 min, doc gid:1210386994396212.
### On Radar / Participation Needed
- **[Address Universal Input (UTI) issues](https://app.asana.com/0/0/1214965000075517)** — Alex stated May/22 he is currently completing this. Wrap up before Tue if it spans into new TP, otherwise carry into TP's first sub-task. Status check needed Mon AM.
### Carried Forward from Last Week
- **[iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** — assignee: Alex
Current TP, 1d overdue (due 2026-05-22). PR open and under review with Alessandro. → see TP section above for closure path.
- **[Address Universal Input (UTI) issues](https://app.asana.com/0/0/1214965000075517)** — assignee: Alex
Alex's May/22 comment indicates this is the gap-filler before new TP starts. Confirm done on Mon.
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
Async coordination task for current TP; close once TP closes.
- **[PR: Simplify tab access in TabBarViewController](https://app.asana.com/0/0/1215059168411571)** — assignee: Alex
due 2026-05-27 (slips to AFK day) — push to Tue.
- **[PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350)** — assignee: Alex
due 2026-05-26 — see Must-Not-Forget; explicit Monday commitment.
- **[Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
due 2026-05-21 (overdue) — blocks Demo tracker ship; ping Jake on Mon if no movement.
---
*Based on snapshot 2026-05-23 01:31 UTC + DB state as of 2026-05-23. Weekly review file for 2026-05-22 not present (briefs/weekly/ directory created fresh); plan built from Asana snapshot + career-notes + recurring-rhythms.*
*Note: User-supplied MONDAY_DATE=2026-05-18 appears off — plan covers forward-looking week of 2026-05-25 (the actual upcoming Monday from Sat 2026-05-23). Saved as `plan-2026-05-25.md`.*
+125
View File
@@ -0,0 +1,125 @@
# Weekly Plan — Week of 2026-05-25
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — confirmed next TP per Alex's own comment (May/22) on the "next Top Priority" task; current TP (Demo tracker) wraps Monday with one PR review pass + handoff to Alessandro.
The project starts May/25 (this Monday). Both kick-off slots for the standing kick-off task (gid:1214950287303110) are already taken; Alex proposed running kick-off async to Dominik on May/22 — pending response. Scope per Alex's note: "looks straightforward, most tension may occur during Ship Review (as usual)". Wed/27 is AFK (public holiday), so effective week is 4 days. Tension points: design assets ([Animated Assets gid:1214627423981798](https://app.asana.com/0/0/1214627423981798) due 2026-05-28), three sub-deliverables already created (Hide Free plan, Hide stop-chat, Disable back button), and dependency on shipping AI onboarding winner (Treatment B).
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 65% | New TP starts May/25; Wed AFK shortens to 4 days. Animated assets due Thu. |
| AOR | 10% | Light AOR week — overdue CI failing-test PR check + standalone bug triage only. |
| Career | 20% | 1:1 with Dominik on Tue (he is NOT OOO — next AFK is June 3+). Empty 1:1 agenda needs prep. Project Advisor doc is highest-leverage EP3 action. |
| Strategy | 5% | Monitor O-L/O-N Assessments; one comment if a relevant TD lands. |
### Shape
**Mon May/25:** Ramp-up + close current TP
- [Alex M next Top Priority (May/25)](https://app.asana.com/0/0/1215058019347550) — close this task once new TP is set in the system
- [PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350) — review pass per Alex's Friday comment; address Alessandro's question on toggle visibility during onboarding, then assign to Alessandro
- [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) — wrap up; verify Privacy Triage status (delegated to Jake Abel)
- O-N Weekly Meeting (gid:1214950287303110)
- O-L Weekly Meeting (gid:1214908681776067) — Dominik is host, agenda is light per Friday comment
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — due today
- [Disable back button during duck.ai onboarding [1d]](https://app.asana.com/0/0/1215009192158960) — delegated subtask, monitor
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — delegated subtask, monitor
**Tue May/26:** New TP kick-off + 1:1 with Dominik
- [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — kick-off (async if Dominik confirms); start scoping the three sub-deliverables
- [Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756) — agenda is currently empty; populate before meeting
- Apple Weekly Team Meeting (gid:1214929922983741)
- [PR: Simplify tab access in TabBarViewController](https://app.asana.com/0/0/1215059168411571) — review/finalize
- [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min anonymous, knock out
**Wed May/27:** AFK — Public Holiday
- [Alex M AFK May/27, Wed (holiday)](https://app.asana.com/0/0/1212694796293421)
**Thu May/28:** Deep work on TP + design hand-off
- [Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due today; coordinate with design
- [Persist 'You've got this' dialogue in non-focused state [0.5d]](https://app.asana.com/0/0/1215009192158950) — was due Tue, slipped past AFK
- [PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929) — 31d overdue, address if PR work allows
**Fri May/29:** Close loops + weekly review + maintenance handoff
- macOS Maintenance week-close (handover comment, feedback, mark complete) — delegated maintenance week ends today
- Weekly review write-up
- Next-week prep (June 1-5 includes Dominik AFK June 1-3 + June 4-5 — verify 1:1 cadence)
### Must-Not-Forget
- [ ] **[PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350)** — assignee: Alex
Alex committed Friday to "review pass on Monday and assign to Alessandro"; Alessandro is waiting on Alex's response to the toggle-visibility question raised May/22. Blocks current TP closure.
- [ ] **[iOS Address onboarding conflicts with unified input…](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
TP starts Mon May/25 — kick-off slots both taken; Alex asked Dominik for async kick-off approval May/22 and has not heard back. If no response by Mon AM, ping again or proceed async.
- [ ] **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — assignee: Alex
due 2026-05-26 — agenda is empty (no items posted since duplication on May/19). Populate before Tue 1:1.
- [ ] **[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798)** — assignee: Alex
due 2026-05-28 — protect Thu after AFK Wed; coordinate with design ahead of time.
- [ ] **[PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)** — assignee: Alex
31 days overdue, blocks CI quality. Address mid-week if TP allows; otherwise carry forward.
### AOR Quick Wins This Week
<!-- Quick-actionable overdue tasks (<2h each). Not urgent but worth a gap slot. -->
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
overdue 22 days — Internal Product Feedback bug; likely small repro + fix scope.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
overdue 22 days — Internal Product Feedback; likely 1-2h investigation.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 8 days — CI failing tests inbox item; investigate failure mode.
### Sprint Backlog (pick 12 if time allows)
<!-- Mid-age overdue (14180 days). Daily planner picks from here during gaps. -->
- **[PR Check is failing on main - testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 — flaky/failing CI test, 31d overdue.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 — 116d overdue; meta-task to triage other overdue items.
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 — 248d overdue; needs decision to close or fix.
(+ 2 aged items >180 days in backlog — not listed)
### On Radar
<!-- Non-assigned TDs/reviews that touch Alex's AOR. No action unless directly mentioned. -->
- **TD: Monthly pixels for iOS and macOS** ([gid:1214950124367781](https://app.asana.com/0/0/1214950124367781)) — Jonathan returning to monthly pixel approach with new ATB analysis (May/23). Touches pixel infrastructure Alex has shipped against. Watch for direct ask.
- **Elevated visible tab crashes on 158.2** ([gid:1215003880609879](https://app.asana.com/0/0/1215003880609879)) — Kris posted a UAF hotfix update; touches Sentry/crash reporting AOR (Alex's secondary). Monitor; engage if hotfix needs macOS-specific input.
- **Internal product feedback form broken** ([gid:1214820313616334](https://app.asana.com/0/0/1214820313616334)) — Samantha posted PR up for review; not Alex's, but feeds Alex's Internal Product Feedback inbox.
### Career Action This Week
**Draft Part 1 of Advisor Readiness doc (30 min)** — priority #1 from career-notes.md. Project Advisor is the most direct lever for EP3 visibility this cycle and is currently "Not started" in the DB. Other priority items are deferred: Primary AOR target → discuss at 1:1 as agenda item (not separate action); Christie EP2/3 calibration confirmation → ask in same 1:1; Assessment visibility → no active O-N/O-L Assessment requiring a comment this week. Time-box: Mon or Thu afternoon, 30 min, doc gid:1210386994396212.
### On Radar / Participation Needed
- **[Address Universal Input (UTI) issues](https://app.asana.com/0/0/1214965000075517)** — Alex stated May/22 he is currently completing this. Wrap up before Tue if it spans into TP-start week, otherwise carry into next TP's first sub-task. Status check needed Mon AM.
### Carried Forward from Last Week
- **[iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** — assignee: Alex
Current TP, 1d overdue (due 2026-05-22). PR open and under review with Alessandro. → see TP section above for closure path.
- **[Address Universal Input (UTI) issues](https://app.asana.com/0/0/1214965000075517)** — assignee: Alex
Alex's May/22 comment indicates this is the gap-filler being completed before new TP starts. Confirm done on Mon.
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
Async coordination task for current TP; close once TP closes.
- **[PR: Simplify tab access in TabBarViewController](https://app.asana.com/0/0/1215059168411571)** — assignee: Alex
due 2026-05-27 (slips to AFK day) — push to Tue.
- **[PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350)** — assignee: Alex
due 2026-05-26 — see Must-Not-Forget; this is the explicit Monday commitment.
- **[Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
due 2026-05-21 (overdue) — blocks Demo tracker ship; ping Jake on Mon if no movement.
---
*Based on snapshot 2026-05-23 01:31 UTC + DB state as of 2026-05-23. Weekly review file for 2026-05-22 not present (briefs/weekly/ directory created fresh); plan built from Asana snapshot + career-notes + recurring-rhythms.*
*Note: User-supplied MONDAY_DATE was 2026-05-18; plan covers forward-looking week of 2026-05-25 (the actual upcoming Monday from Sat 2026-05-23), saved as plan-2026-05-25.md to match the planned week.*