Files
obsidian-vault/work/briefs/daily/2026-05-31.md
T

99 lines
6.1 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-05-31
*Sunday. Light brief — the work week (Mon 6/1 Fri 6/5) starts tomorrow. Today's focus per weekly plan: rest / preview. New signals since Friday: 1 task changed (Warn Before Quit pixels — bot reminder, already on next week's AOR list), 1 new comment, 0 PR state changes.*
### ✨ Morning
On this day in **1859**, the Great Bell at Westminster — nicknamed *Big Ben* — chimed for the very first time. The original 16-ton bell cracked within months under the hammer; the replacement (still cracked, just gently) has been keeping London's time for 166 years. Even icons get the v2 patch eventually.
🌿 Sunday — step outside for 5 minutes before opening anything work-related.
---
## Plan for Today
It's Sunday. Suggested shape: light. If you want to touch one thing, pick the easy win.
1.**Confirm [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) is merged** — PR #5149 is ✅ approved; one-click check on GitHub, then mark the Asana task complete. (≤5 min.)
2. 📋 **Preview tomorrow's shape** — see [weekly plan-2026-06-01](https://app.asana.com/0/0/1215009192158950): incoming TP is *Persist 'You've got this' dialogue*; 3 carry-over PRs need to land (Treatment B CI red, "Stop chat" awaiting review, Monterrey-only PR is the Big Sur project blocker that closes Mon).
Everything else can wait for Monday.
---
### 🔴 Urgent / Overdue
All five are last-week carry-overs. Nothing moved Saturday — all of these are Monday's first stack.
- **[OVERDUE] [DRI] — [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)**
Context: PR #5145 CI is 🔴. Due 5/28, overdue 3d. De-facto TP carry from last week — blocks the iOS Duck.ai onboarding ship.
Action (Mon): diagnose CI failure, push fix, re-request review.
- **[OVERDUE] [DRI] — [Hide "stop chat" button in input box [0.5d]](https://app.asana.com/0/0/1215009192158954)**
Context: PR #5173 ✅ CI, waiting on reviewer. Due 5/29, overdue 2d.
Action (Mon): post "ready for review, can you take a look?" ping in PR thread.
- **[OVERDUE] [DRI] — [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)**
Context: Parent "Drop Big Sur" project closes Mon 6/1 per Diego. Alex's PR is the merge-blocker. Due 5/27, overdue 4d.
Action (Mon, first thing): land the PR or escalate to Diego with concrete blocker.
- **[OVERDUE] [DRI] — [Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
Context: PR #4663 draft, ✅ CI, waiting review. macOS Release Board follow-up. Due 5/28, overdue 3d.
Action (Mon): decide — push to land this week, or formally defer (comment + new due date).
- **[OVERDUE] [DRI] — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
Context: anonymous 5-min timeboxed survey. Due 5/26, overdue 5d.
Action (Mon): fill it in (5 min, no thinking required).
**Backlog cluster** (informational, not action): 7 inbox/planning items overdue >30d — *Pinned tab opens link in background tab* (5/1), *Text selection in address bar* (5/1), *PR Check failing on main* (4/22), *PR Check failing on main* (5/15), *Review Overdue Tasks Summary - 22 Tasks* (1/27), *Assertion Failure Pixel Anomaly 2025/09/15*, *Bug: Tab preview stuck around* (2025-04-15). These live in next week's Sprint Backlog — don't surface daily.
---
### 🟠 Needs Action Today
None on Sunday.
**Monday heads-up — PR Reviews queue**: 11 GitHub items waiting on Alex (6 review-requested, 5 mentions across `apple-browsers` and `privacy-configuration`). Batch after the TP block, not as a first-thing distraction.
---
### 🟡 Delegated — Follow Up Needed
- **[OVERDUE] — [Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — Jake Abel
Due 5/21, no activity since 5/20. 10d overdue. The parent task is [ON HOLD] so the triage may be moot — but the open Asana task is misleading.
Suggest: comment on task: "Jake — parent is on hold. Should this triage close, or stay open for when the project resumes?"
- **[OVERDUE] — [Localization - 2-5 days](https://app.asana.com/0/0/1214147157456477)** — unassigned
Due 4/28. 33d overdue and **no assignee**. Stale since 4/21.
Suggest: either assign to a localization owner or close with reason.
- **[STALE] — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields](https://app.asana.com/0/0/1207521936429896)**
75d no activity, no matching GitHub PR found.
Suggest: check if work was abandoned; close or reassign.
- **[STALE] — [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177)** — Deepankar
No activity since 2025-12-08. Was due 2025-11-17.
Suggest: "Deepankar — is this still active? If not, can we close?"
(Other ~110 open delegated items have no due date and no fresh signal — defer to weekly review.)
No "PR merged but Asana task still open" matches in the snapshot — nothing to close from delegated GitHub.
---
### 🔵 Rhythms
**TP**: Last week's TP was [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — **incomplete, carries forward** as a blocker (PR #5145 CI red). Incoming week's TP per the plan: [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950), due Mon 6/1. Set it Monday morning.
**Next TP Thread**: not yet — outgoing TP (Treatment B) is not at "close to completion" while CI is red. No thread to open this morning.
**Upcoming this week (6/1 6/5)**:
- **1:1 with Dominik — CANCELLED** all week (Dominik OOO: LDX3 MonWed, public holiday ThuFri). Next realistic 1:1: week of 6/15. Do not raise the agenda — keep collecting.
- Standing meetings: O-L Weekly Mon, Apple Weekly Tue, O-N Weekly Wed.
- **AFK prep**: WWDC partly-AFK starts Mon 6/8 — 8 days out. Handoff window opens this week; nothing urgent yet, but flag in-flight items at Tue's team meeting.
- Career slot: 30-min Project Advisor Readiness doc Part 1 — Thu 6/4 (uses the freed 1:1 slot).
- No active rotation.
---