--- ## Daily Brief — 2026-05-31 *Sunday. Light brief — the work week (Mon 6/1 – Fri 6/5) starts tomorrow. Today's focus per weekly plan: rest / preview. New signals since Friday: 1 task changed (Warn Before Quit pixels — bot reminder, already on next week's AOR list), 1 new comment, 0 PR state changes.* ### ✨ Morning On this day in **1859**, the Great Bell at Westminster — nicknamed *Big Ben* — chimed for the very first time. The original 16-ton bell cracked within months under the hammer; the replacement (still cracked, just gently) has been keeping London's time for 166 years. Even icons get the v2 patch eventually. 🌿 Sunday — step outside for 5 minutes before opening anything work-related. --- ## Plan for Today It's Sunday. Suggested shape: light. If you want to touch one thing, pick the easy win. 1. ⚡ **Confirm [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) is merged** — PR #5149 is ✅ approved; one-click check on GitHub, then mark the Asana task complete. (≤5 min.) 2. 📋 **Preview tomorrow's shape** — see [weekly plan-2026-06-01](https://app.asana.com/0/0/1215009192158950): incoming TP is *Persist 'You've got this' dialogue*; 3 carry-over PRs need to land (Treatment B CI red, "Stop chat" awaiting review, Monterrey-only PR is the Big Sur project blocker that closes Mon). Everything else can wait for Monday. --- ### 🔴 Urgent / Overdue All five are last-week carry-overs. Nothing moved Saturday — all of these are Monday's first stack. - **[OVERDUE] [DRI] — [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** Context: PR #5145 CI is 🔴. Due 5/28, overdue 3d. De-facto TP carry from last week — blocks the iOS Duck.ai onboarding ship. Action (Mon): diagnose CI failure, push fix, re-request review. - **[OVERDUE] [DRI] — [Hide "stop chat" button in input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** Context: PR #5173 ✅ CI, waiting on reviewer. Due 5/29, overdue 2d. Action (Mon): post "ready for review, can you take a look?" ping in PR thread. - **[OVERDUE] [DRI] — [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** Context: Parent "Drop Big Sur" project closes Mon 6/1 per Diego. Alex's PR is the merge-blocker. Due 5/27, overdue 4d. Action (Mon, first thing): land the PR or escalate to Diego with concrete blocker. - **[OVERDUE] [DRI] — [Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** Context: PR #4663 draft, ✅ CI, waiting review. macOS Release Board follow-up. Due 5/28, overdue 3d. Action (Mon): decide — push to land this week, or formally defer (comment + new due date). - **[OVERDUE] [DRI] — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** Context: anonymous 5-min timeboxed survey. Due 5/26, overdue 5d. Action (Mon): fill it in (5 min, no thinking required). **Backlog cluster** (informational, not action): 7 inbox/planning items overdue >30d — *Pinned tab opens link in background tab* (5/1), *Text selection in address bar* (5/1), *PR Check failing on main* (4/22), *PR Check failing on main* (5/15), *Review Overdue Tasks Summary - 22 Tasks* (1/27), *Assertion Failure Pixel Anomaly 2025/09/15*, *Bug: Tab preview stuck around* (2025-04-15). These live in next week's Sprint Backlog — don't surface daily. --- ### 🟠 Needs Action Today None on Sunday. **Monday heads-up — PR Reviews queue**: 11 GitHub items waiting on Alex (6 review-requested, 5 mentions across `apple-browsers` and `privacy-configuration`). Batch after the TP block, not as a first-thing distraction. --- ### 🟡 Delegated — Follow Up Needed - **[OVERDUE] — [Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — Jake Abel Due 5/21, no activity since 5/20. 10d overdue. The parent task is [ON HOLD] so the triage may be moot — but the open Asana task is misleading. Suggest: comment on task: "Jake — parent is on hold. Should this triage close, or stay open for when the project resumes?" - **[OVERDUE] — [Localization - 2-5 days](https://app.asana.com/0/0/1214147157456477)** — unassigned Due 4/28. 33d overdue and **no assignee**. Stale since 4/21. Suggest: either assign to a localization owner or close with reason. - **[STALE] — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields](https://app.asana.com/0/0/1207521936429896)** 75d no activity, no matching GitHub PR found. Suggest: check if work was abandoned; close or reassign. - **[STALE] — [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177)** — Deepankar No activity since 2025-12-08. Was due 2025-11-17. Suggest: "Deepankar — is this still active? If not, can we close?" (Other ~110 open delegated items have no due date and no fresh signal — defer to weekly review.) No "PR merged but Asana task still open" matches in the snapshot — nothing to close from delegated GitHub. --- ### 🔵 Rhythms **TP**: Last week's TP was [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — **incomplete, carries forward** as a blocker (PR #5145 CI red). Incoming week's TP per the plan: [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950), due Mon 6/1. Set it Monday morning. **Next TP Thread**: not yet — outgoing TP (Treatment B) is not at "close to completion" while CI is red. No thread to open this morning. **Upcoming this week (6/1 – 6/5)**: - **1:1 with Dominik — CANCELLED** all week (Dominik OOO: LDX3 Mon–Wed, public holiday Thu–Fri). Next realistic 1:1: week of 6/15. Do not raise the agenda — keep collecting. - Standing meetings: O-L Weekly Mon, Apple Weekly Tue, O-N Weekly Wed. - **AFK prep**: WWDC partly-AFK starts Mon 6/8 — 8 days out. Handoff window opens this week; nothing urgent yet, but flag in-flight items at Tue's team meeting. - Career slot: 30-min Project Advisor Readiness doc Part 1 — Thu 6/4 (uses the freed 1:1 slot). - No active rotation. ---