[2026-06-01] taiga sync: .stfolder/syncthing-folder-940f59.txt personal/gift-ideas.md work/briefs/daily/2026-06-01.md work/briefs/inbox/2026-06-01.md

This commit is contained in:
Тайга
2026-06-01 05:00:45 +00:00
parent bf7ef06d8a
commit 881dd9def0
4 changed files with 0 additions and 111 deletions
View File
-95
View File
@@ -1,95 +0,0 @@
---
## Daily Brief — 2026-06-01
### ✨ Morning
On June 1, 1869, Thomas Edison received his very first patent — for an electric vote-recording machine. Politicians hated it (they wanted hand-counts slow enough for backroom bargaining), so it never sold. Even Edison shipped a PR with no reviewers willing to merge.
💧 Start with a glass of water.
## Plan for Today
1. ⚡ **Hide Free plan • Upgrade** (#5149) — PR approved; ping Alessandro "ready for another look" and merge. ~10 min, easy win.
2. 🔴 **Ship AI onboarding winner** (#5145) — fix the failing CI job, get it green, merge.
3. 🔴 **Hide "stop chat" button** (#5173) — CI ✅, review ✅; land it.
4. 🔴 **Persist 'You've got this' dialogue [2d]** — due today, biggest unstarted TP-cluster item; start now and protect Mon/Tue for it.
5. 🟠 **PR: macOS Monterrey-only** — 5d overdue, on Diego's Monterey+ Jun-15 critical path; push to merge this week.
6. 🟠 **O-L Weekly Meeting** (recurring, today).
7. 🟠 **PR review batch** — 6 review-requests + 5 mentions queued; single ~30-min block.
8. 🟡 **Set today's 1-Must** in Asana (Monday ritual; no active "1 Must" task in inbox).
> Today's focus per weekly plan: ramp + ship the 0.5d's of the TP cluster. New signals since the plan was written: CI-fixing task `1215264800186724` was completed overnight by Sam S (one less AOR thing in your way), and Alessandro's "ready for another look" ping on #5149 is on GitHub, not Asana — so it doesn't appear in story threads.
---
### 🔴 Urgent / Overdue
**TP cluster (Ship Review Fri 2026-06-05):**
- [OVERDUE 4d] [DRI] — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)
- Context: PR #5145 CI is red 🔴, review ⏳ waiting on green.
- Action: Fix the failing job, push, confirm green, request review or merge.
- [OVERDUE 4d] [DRI] — [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952)
- Context: PR #5149 approved ✅, CI ✅. Per weekly plan, Alessandro asked yesterday "let me know when the PR is ready for another look."
- Action: Reply on the PR (or ping Alessandro), then merge.
- [OVERDUE 3d] [DRI] — [Hide "stop chat" button in input box](https://app.asana.com/0/0/1215009192158954)
- Context: PR #5173 CI ✅, review ✅.
- Action: Land it today.
**Other active overdue:**
- [OVERDUE 5d] [DRI] — [PR: Make our macOS app Monterrey-only (1-3d)](https://app.asana.com/0/0/1215150214975916)
- Context: Diego confirmed last Big Sur release Jun 8, Monterey+ Jun 15. This PR is on the critical path.
- Action: Push the PR through this week; if blocked, comment with the blocker.
- [OVERDUE 40d] [AOR] — [PR Check failing on main — testWhenTab…errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)
- Context: CI failing test on main. A separate crashy macOS suite was fixed overnight by Sam S, but this one is still open.
- Action: Investigate flake vs. real regression — disable or fix.
- [OVERDUE 17d] [AOR] — [PR Check failing on main](https://app.asana.com/0/0/1214797526093576)
- Context: Likely the same family as above.
- Action: Triage together — confirm whether one fix covers both.
- [OVERDUE 4d] [REVIEWER] — [Follow-up: Inline Text Images for TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)
- Context: PR #4663 (draft) is up.
- Action: Review, promote out of draft, merge if clean.
**Backlog cluster** (informational — items deprioritized to `do_later` / `quick_wins` / aged `planning` / `inbox`):
Tab preview stuck (412d), Duo login Grafana (313d), Assertion Failure Pixel Anomaly (257d), Review Overdue Tasks Summary (125d), Pinned tab opens in background (31d), Text selection address bar (31d), Desktop Browser Feature Owner Survey (6d — 5-min timebox if room).
### 🟠 Needs Action Today
**Ship Reviews (DRI)**
- [Ship Review: iOS Address onboarding…](https://app.asana.com/0/0/1215009192158961) — Alex created and delegated; downstream of the TP cluster. No reviewer comments yet → **MONITORING**, not blocking on Alex. Weekly plan slot is Thu (verify scope + green build) before Fri.
**PR Reviews (Reviewer)**
- 11 items queued on GitHub: 6 review requests (privacy-configuration + apple-browsers) + 5 mentions. **Batch as one ~30-min block** after the TP work — no single PR flagged as overdue >5d or blocker-directed at Alex.
**Strategy (awareness only — engage Tue per plan)**
- [Desktop Browsers: Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy + Mark replied Sat; Ivy is picking it up Mon/Tue as her next top priority. Silence reads as acquiescence. Weekly plan slots a substantive reply for Tue 2026-06-02.
### 🟡 Delegated — Follow Up Needed
- [OVERDUE 10d] — [Privacy Triage: iOS Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675) — assignee: Jake Abel, due 2026-05-21.
- Tied to the on-hold Demo tracker task and the TP umbrella. Action: ping Jake for triage status before Fri's Ship Review.
- [OVERDUE 7d] — [🤖 Check for dependabot PRs](https://app.asana.com/0/0/1215057989642782) — assignee: Tom Strba, due 2026-05-25.
- Maintenance rotation item. Action: quick ping — confirm in-progress or pull back.
- [STALE 76d] — [PR: C-S-S Fix site copy/cut/paste/text selection](https://app.asana.com/0/0/1207521936429896) — no GitHub PR match found per snapshot correlation.
- Action: decide — chase, descope, or close.
_(Older delegated items 100+ days stale exist but are O-L backlog stash, not active commitments — not surfaced.)_
### 🔵 Rhythms
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — Ship Review due Fri 2026-06-05; modified today, not stale. Three of four 0.5d/2d subtasks still open and overdue. Next TP Thread not needed — TP is mid-flight, not close to completion.
**Career Advisor**: 1:1 with Dominik SKIPPED this week (Dominik OOO Jun 15: LDX3 + holiday). Next realistic 1:1: week of Jun 15. No prep needed today.
**Upcoming this week**:
- Tue 2026-06-02: Apple Weekly Team Meeting; engage on Windows AOT delivery plan (Strategy reply).
- Wed 2026-06-03: O-N Weekly Meeting; triage two CI-failing-on-main tasks together.
- Thu 2026-06-04: Clear GitHub review-requested queue; verify Ship Review scope + green build.
- Fri 2026-06-05: Ship Review milestone; close DRI <> Project Advisor async on Demo tracker; draft Part 1 of Advisor Readiness doc (career action, 30 min).
- Mon 2026-06-08: WWDC AFK starts (Partly AFK Jun 812) — if Persist or Try Visiting slip, leave a handoff comment Fri.
-16
View File
@@ -1,16 +0,0 @@
## Inbox Triage — 2026-06-01 (since 2026-06-01 09:17)
### New / Changed — Action Required
_None._
### New / Changed — Monitoring
_None._
### Nothing new
Inbox quiet — nothing new.
No @mentions, no new comments from others on your open tasks, no new assignments, and no Ship Review / Tech Design / incident state changes since the last sync (Jun 1, 09:47 Almaty).
The only activity in the 24h window was Sam S on **[PR Check is failing on main](https://app.asana.com/0/0/1215264800186724)** at May 31 21:49 UTC — but that task auto-completed at the same timestamp, so no action needed.
_Overdue tasks and active focus items are tracked in `status.md` and the daily brief — not re-surfaced here._