Files
obsidian-vault/work/briefs/daily/2026-06-01.md
T

6.6 KiB
Raw Blame History


Daily Brief — 2026-06-01

Morning

On June 1, 1869, Thomas Edison received his very first patent — for an electric vote-recording machine. Politicians hated it (they wanted hand-counts slow enough for backroom bargaining), so it never sold. Even Edison shipped a PR with no reviewers willing to merge. 💧 Start with a glass of water.

Plan for Today

  1. Hide Free plan • Upgrade (#5149) — PR approved; ping Alessandro "ready for another look" and merge. ~10 min, easy win.
  2. 🔴 Ship AI onboarding winner (#5145) — fix the failing CI job, get it green, merge.
  3. 🔴 Hide "stop chat" button (#5173) — CI , review ; land it.
  4. 🔴 Persist 'You've got this' dialogue [2d] — due today, biggest unstarted TP-cluster item; start now and protect Mon/Tue for it.
  5. 🟠 PR: macOS Monterrey-only — 5d overdue, on Diego's Monterey+ Jun-15 critical path; push to merge this week.
  6. 🟠 O-L Weekly Meeting (recurring, today).
  7. 🟠 PR review batch — 6 review-requests + 5 mentions queued; single ~30-min block.
  8. 🟡 Set today's 1-Must in Asana (Monday ritual; no active "1 Must" task in inbox).

Today's focus per weekly plan: ramp + ship the 0.5d's of the TP cluster. New signals since the plan was written: CI-fixing task 1215264800186724 was completed overnight by Sam S (one less AOR thing in your way), and Alessandro's "ready for another look" ping on #5149 is on GitHub, not Asana — so it doesn't appear in story threads.


🔴 Urgent / Overdue

TP cluster (Ship Review Fri 2026-06-05):

  • [OVERDUE 4d] [DRI] — Ship AI onboarding winner (Treatment B)

    • Context: PR #5145 CI is red 🔴, review waiting on green.
    • Action: Fix the failing job, push, confirm green, request review or merge.
  • [OVERDUE 4d] [DRI] — Hide Free plan • Upgrade in onboarding

    • Context: PR #5149 approved , CI . Per weekly plan, Alessandro asked yesterday "let me know when the PR is ready for another look."
    • Action: Reply on the PR (or ping Alessandro), then merge.
  • [OVERDUE 3d] [DRI] — Hide "stop chat" button in input box

    • Context: PR #5173 CI , review .
    • Action: Land it today.

Other active overdue:

Backlog cluster (informational — items deprioritized to do_later / quick_wins / aged planning / inbox): Tab preview stuck (412d), Duo login Grafana (313d), Assertion Failure Pixel Anomaly (257d), Review Overdue Tasks Summary (125d), Pinned tab opens in background (31d), Text selection address bar (31d), Desktop Browser Feature Owner Survey (6d — 5-min timebox if room).

🟠 Needs Action Today

Ship Reviews (DRI)

  • Ship Review: iOS Address onboarding… — Alex created and delegated; downstream of the TP cluster. No reviewer comments yet → MONITORING, not blocking on Alex. Weekly plan slot is Thu (verify scope + green build) before Fri.

PR Reviews (Reviewer)

  • 11 items queued on GitHub: 6 review requests (privacy-configuration + apple-browsers) + 5 mentions. Batch as one ~30-min block after the TP work — no single PR flagged as overdue >5d or blocker-directed at Alex.

Strategy (awareness only — engage Tue per plan)

  • Desktop Browsers: Windows AOT delivery plan — Ivy + Mark replied Sat; Ivy is picking it up Mon/Tue as her next top priority. Silence reads as acquiescence. Weekly plan slots a substantive reply for Tue 2026-06-02.

🟡 Delegated — Follow Up Needed

(Older delegated items 100+ days stale exist but are O-L backlog stash, not active commitments — not surfaced.)

🔵 Rhythms

TP: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — Ship Review due Fri 2026-06-05; modified today, not stale. Three of four 0.5d/2d subtasks still open and overdue. Next TP Thread not needed — TP is mid-flight, not close to completion.

Career Advisor: 1:1 with Dominik SKIPPED this week (Dominik OOO Jun 15: LDX3 + holiday). Next realistic 1:1: week of Jun 15. No prep needed today.

Upcoming this week:

  • Tue 2026-06-02: Apple Weekly Team Meeting; engage on Windows AOT delivery plan (Strategy reply).
  • Wed 2026-06-03: O-N Weekly Meeting; triage two CI-failing-on-main tasks together.
  • Thu 2026-06-04: Clear GitHub review-requested queue; verify Ship Review scope + green build.
  • Fri 2026-06-05: Ship Review milestone; close DRI <> Project Advisor async on Demo tracker; draft Part 1 of Advisor Readiness doc (career action, 30 min).
  • Mon 2026-06-08: WWDC AFK starts (Partly AFK Jun 812) — if Persist or Try Visiting slip, leave a handoff comment Fri.