11 KiB
Weekly Plan
Weekly Plan — Week of 2026-06-01
Note: No prior weekly review file found (weekly/ directory was empty). This plan is seeded from current Asana state, not from a Friday review setup. Subsequent weeks will reference the prior review.
Top Priority: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — umbrella project task due Fri 2026-06-05; four sub-tasks in top_priority (Persist dialogue [2d], Hide Free Plan, Hide stop button, Ship AI onboarding winner) all converge on this; Ship Review task (1215009192158961) is already created and downstream. This is the visible deliverable for the week.
Career Advisor status: Dominik OOO entire week (LDX3 Jun 1-3 + Public Holiday Jun 4-5). 1:1 SKIPPED. Next likely 1:1 window is bi-weekly cadence after Jun 8 — but Alex is partly AFK for WWDC'26 Jun 8-12. Realistic next 1:1: week of Jun 15.
Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | TP cluster is large; Ship Review by Fri is the gating event — Project bumped above 60% target. |
| AOR | 10% | Light week — two CI-failing-on-main tasks need triage; otherwise PRs pending review. |
| Career | 15% | Above 5% floor: 1:1 skipped but Project Advisor draft is overdue per career-notes. |
| Strategy | 5% | Windows AOT delivery plan response to Ivy/Mark — a strategic comment, not a project deliverable. |
Shape
Mon 06-01: Ramp + ship the 0.5d's
- O-L Weekly Meeting (recurring, today)
- Persist 'You've got this' dialogue in non-focused state [2d] — start; due today
- Ship AI onboarding winner (Treatment B) [0.5d] — overdue 4d; PR #5145 has CI failing → fix CI first, then merge
- PR Check is failing on main — Sam has a PR up overnight; confirm if green and close, otherwise unblock
- Set 1-Must for today
Tue 06-02: Onboarding cluster + strategic comment
- Apple Weekly Team Meeting (recurring)
- Persist 'You've got this' dialogue [2d] — continue / finish
- Hide Free plan • Upgrade in onboarding [0.5d] — PR #5149 approved → merge
- Strategy: Reply on Desktop Browsers: Windows AOT delivery plan — Ivy responded Sat; Alex's two earlier comments need follow-up before Ivy "picks it up Mon/Tue as TP"
Wed 06-03: Ship Review prep
- O-N Weekly Meeting (recurring)
- Hide "stop chat" button in the input box [0.5d] — PR #5173 waiting review → push for review
- Try Visiting a Site: Background [1d] — start
- Triage CI-failing-on-main tasks (1213975496167929, 1214797526093576)
Thu 06-04: Close loops; cover PR review backlog
- Try Visiting a Site: Background [1d] — finish
- Clear GitHub review-requested queue (6 PRs pending Alex's review)
- Verify SR scope: Ship Review: iOS Address onboarding... — ensure subtasks listed
Fri 06-05: Ship Review day + retro + career
- iOS Address onboarding conflicts... — Ship Review milestone (project due today)
- DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding — close out async DRI sync
- Career action — Draft Part 1 of Advisor Readiness doc (see Career Action below)
- Write weekly retrospective (note: Dominik OOO → no 1:1 prep needed)
- WWDC AFK starts Mon Jun 8 — write handoff comment on TP cluster if Persist or Try Visiting slip
Must-Not-Forget
-
Ship AI onboarding winner (Treatment B) [0.5d] — assignee: Alex due 2026-05-28 (overdue 4d) — PR #5145 CI is red; this is the bottleneck for the AI onboarding ship. Alex needs to fix the failing job before merge can happen.
-
Hide Free plan • Upgrade in onboarding [0.5d] — assignee: Alex due 2026-05-28 (overdue 4d) — PR #5149 is approved; merge today/Tue to clear from the cluster. Alessandro asked "let me know when the PR is ready for another look" on the related task.
-
Hide "stop chat" button in the input box [0.5d] — assignee: Alex due 2026-05-29 (overdue 3d) — PR #5173 ⏳ waiting review; ping reviewers Mon.
-
Persist 'You've got this' dialogue in non-focused state [2d] — assignee: Alex due 2026-06-01 (today) — biggest unstarted TP-cluster item; protect Mon/Tue for it. Will need draft PR by EOW for SR Fri.
-
PR: Make our macOS app Monterrey-only - 1-3d — assignee: Alex due 2026-05-27 (overdue 5d) — Diego's comment Sat: "last Big Sur version releases Jun 8, Monterey+ version merges next week, public release Jun 15." Alex's PR is on the critical path.
AOR Quick Wins This Week
-
PR Check is failing on main - testWhenTab...errorPageIsShownOnce overdue 40 days — CI failing test on main; investigate flake vs real regression, disable or fix.
-
PR Check is failing on main overdue 17 days — second CI failing task; likely related or a flake batch.
-
Follow-up: add support of Inline Text Images to TypingTextAnimation overdue 4 days — PR #4663 is already up (draft); review and promote out of draft.
-
Feature flag: warnBeforeQuit due 2026-04-24 (do_later section but flagged today) — feature flag cleanup; quick win if related ship is shipped.
Sprint Backlog (pick 1–2 if time allows)
-
Text selection in the address bar doesn't work as standard due 2026-05-01 (31d overdue) — Internal Product Feedback inbox; likely AOR-touching.
-
Pinned tab opens link in background tab due 2026-05-01 (31d overdue) — Internal Product Feedback; PR #4630 already up addressing similar (cross-domain from pinned).
-
Review Overdue Tasks Summary - 22 Tasks (Jan 2026) due 2026-01-27 (125d overdue) — meta task, 5min to read & either close or schedule.
-
Assertion Failure Pixel Anomaly - 2025/09/15 due 2025-09-17 (257d overdue) — pixel investigation; verify still relevant before working.
(+ 3 aged items >180 days in backlog — not listed: tab preview stuck 412d, Duo login Grafana 313d, Assertion Pixel 257d.)
On Radar
- Drop macOS 11 Big Sur Support — Diego: SR completed, last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's "Make Monterrey-only" PR is on this critical path — keep in sync.
- SIGKILL inside MainViewController chrome bar reveal animation — Eduardo Pinto added defensive weak captures; Sentry/crash AOR touchpoint, monitor merge.
- CEF: Failing tests when 'setTabTitlesEarly' is enabled — Kris Wright zeroing in on root cause; touches
OnDocumentTitleChanged. Monitor; engage if it blocks Apple work. - AOR: Desktop Browsers Operational Health — Elle flagged missing
site_loading_performancepixel on macOS. AOR-adjacent, monitor.
Career Action This Week
Picked: Draft Part 1 of Advisor Readiness doc (30 min) — task already exists: Readiness Self-Reflection for Potential Project Advisor - Alex M.
Why this one (priority 1 from career-notes):
- Project Advisor is the single most direct EP3 lever identified in the 2026-02 review.
- Status in career-notes: "Not started" — and the task has been sitting since Feb.
- 1:1 prep (priority 5) is moot — Dominik OOO all week.
- Calibration follow-up with Christie (priority 3) deferred — better raised at next 1:1 once Dominik is back (week of Jun 15).
- Strategic visibility (priority 4) is partially covered already this week by the Windows AOT comment (under Strategy quadrant).
Concrete deliverable: 30-min block Fri afternoon — write Part 1 of the self-reflection doc (one project I'd be a strong advisor on, why, what unique perspective I bring). Don't polish; goal is to break the "not started" state.
On Radar / Participation Needed
-
Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build Ivy + Mark replied Sat to Alex's two pushback comments ("spinning off another project without discussing... I don't get how this is different"). Ivy: "your plan is the foundation for this... I plan to pick it up Mon/Tue as my next top priority." Engage Mon/Tue with substantive reply — this is a scoping decision Alex wanted to influence; silence reads as acquiescence.
-
Sorting in big HTML is 15sec compared to Vivaldi's 2 second Ivy proposed setting up a perf test using Boli's framework. Touches macOS perf AOR adjacent — monitor; engage if Apple team input requested.
-
Windows Browser: Re-enable isolated JS worlds Boli asked Bulcsu about isolated worlds on new native script injection APIs; CPM-related discussion. Monitor; not Apple-side.
Carried Forward from Last Week
No prior weekly review exists — nothing to carry forward formally. The closest equivalents are:
-
Cursor integration: configure VSCode support — assignee: Alex In
activesection, last modified 2026-05-06; not advanced in 3+ weeks. Decide: pick up or move todo_later. -
GH Workflow Failure - UI Tests — assignee: Alex In
activesection, last modified 2026-03-20; very stale. Decide: still relevant? Close or revive. -
UI Tests refinement — assignee: Alex In
activesection, last modified 2026-02-11; almost certainly stale. Status decision needed. -
Dominik :: Alex Regular 1:1 Agenda — possibly deleted (per snapshot ⚠️) — flagged for verification; do not act until confirmed. Current active agenda task is gid 1214933759913756 (due 2026-05-26).
Based on DB state as of 2026-06-01 (no prior weekly review available). Sync freshness: 2026-06-01 01:01 UTC.