Failed to authenticate. API Error: 401 Invalid authentication credentials

[2026-05-19] vault sync
This commit is contained in:
Alexey Martemyanov
2026-05-19 08:01:01 +06:00
parent 15d0c25a64
commit 04d20f8cd9
+110
View File
@@ -0,0 +1,110 @@
---
## Daily Brief — 2026-05-19
### ✨ Morning
On May 19, 1962, Marilyn Monroe stepped on stage at Madison Square Garden and sang a breathless, sequin-clad "Happy Birthday, Mr. President" to JFK — 10 days *before* his actual birthday. The dress was so form-fitting it had to be sewn directly onto her body. Still one of pop culture's most iconic 60 seconds. 🎂🎤
🚶 Take a short walk before diving in.
---
## Plan for Today
_Today's focus per weekly plan: 1:1 with Dominik + SR Design Review push. New signals since yesterday: builds posted last night by Alex, Alessandro replied on "Try Visiting a Site: Background" this morning (action needed), DRI async must-haves summary from Alessandro (unread)._
1. ⚡ Mark old [Dominik :: Alex 1:1 Agenda (May 5)](https://app.asana.com/0/0/1214339792109087) complete — meeting has long passed (≤2 min)
2. 🔴 Reply to Alessandro on [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) — he clarified the design change at 06:02 today (taller background); Alex noted it as non-blocker in SR comment — confirm scope/decision
3. 🔴 Prep agenda + meet with Dominik today — [1:1 Agenda task](https://app.asana.com/0/0/1214742648120931) due today; topics: Project Advisor role kick-off, primary AOR, EP3/EP2 calibration, [ON HOLD] iOS toggle screen status
4. 🟠 SR: monitor Alessandro's QA results (builds posted last night); coordinate merge once QA passes
5. Review [DRI <> Project Advisor async](https://app.asana.com/0/0/1213551072611261) — Alessandro's must-haves summary from yesterday (Alex hasn't responded)
6. PR [privacy-configuration #5189](https://app.asana.com/0/0/1214895946163976) — add individual reviewer on GitHub (auto-reminder in inbox, due today)
7. Open Next TP Thread — once SR ships, comment on [iOS Address onboarding conflicts](https://app.asana.com/0/0/1214592943696234) announcing as incoming TP
8. PR Check failing on main — [gid 1213975496167929](https://app.asana.com/0/0/1213975496167929) — 27 days overdue; triage/close when AOR block opens
---
### 🔴 Urgent / Overdue
**⚠️ iOS: Demo tracker blocking after chat in onboarding**
- [Feature task](https://app.asana.com/0/0/1213551050320249) — due 2026-05-18 (yesterday), top_priority
- [Ship Review](https://app.asana.com/0/0/1214147157456478) — due 2026-05-19 (today)
- **Status (last night):** Alex posted updated builds at 22:29 with all SR issues addressed except toggle animation (flagged as non-blocker). Two fresh build links in SR comments.
- **Waiting for:** Alessandro's QA results — he confirmed yesterday morning he'd run another round today.
- **Action:** Watch for Alessandro's test update. If QA passes → Costas authorized merge even before Design Review tick.
**⚠️ Try Visiting a Site: Background** — SR subtask
- [Task](https://app.asana.com/0/0/1214828145455342) — due 2026-05-15, overdue 4 days
- **New comment (06:02 today):** Alessandro clarified the required change: use a taller background image to fill the empty screen (linear-bg-address-bar-preference). Alex had noted this as "not a blocker" in the SR comment.
- **Action:** Reply to Alessandro confirming scope decision — either implement the taller background or explicitly scope out with rationale.
**⚠️ PR Check is failing on main**
- [Task](https://app.asana.com/0/0/1213975496167929) — due 2026-04-22, active section, **27 days overdue**
- Test: `testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce`
- No new activity since May 13. Separate inbox entry also exists (gid 1214797526093576, due May 15).
- **Action:** Triage when AOR block opens — disable flaky test or confirm fix.
**⚠️ Dominik :: Alex 1:1 Agenda (May 5)**
- [Task](https://app.asana.com/0/0/1214339792109087) — due 2026-05-05, inbox, overdue 14 days
- **Action:** Mark complete (meeting long passed).
**⚠️ [ON HOLD] iOS: Introduce new toggle screen**
- [Task](https://app.asana.com/0/0/1213320237636425) — due 2026-05-15, top_priority. ON HOLD.
- **Action:** Confirm hold status with Dominik at today's 1:1.
**Backlog cluster (no action today):**
- "Bug: Tab preview stuck around" (2025-04-15, macOS Browser Bugs)
- "Assertion Failure Pixel Anomaly" (2025-09-17, planning)
- "Review Overdue Tasks Summary" (2026-01-27, planning)
- "Pinned tab opens link in background" + "Text selection in address bar" (2026-05-01, Internal Product Feedback inbox)
---
### 🟠 Needs Action Today
**Ship Review: Demo tracker (DRI)**
- Builds posted last night — waiting for Alessandro's QA verdict.
- Background subtask design question needs response (see Urgent above).
- [DRI <> Project Advisor async](https://app.asana.com/0/0/1213551072611261): Alessandro summarized must-haves yesterday (last comment unread by Alex). Review the list and confirm which tasks are ⏭️ skipped vs. ✅ done.
**1:1 with Dominik — today**
- [Agenda task](https://app.asana.com/0/0/1214742648120931) due today. Topics from weekly plan:
- Project Advisor role for iOS Address onboarding conflicts (Gary OOO May 1930 — window to formalize)
- Primary AOR target
- EP2→EP3 calibration status (Christie)
- [ON HOLD] iOS toggle screen — confirm if still needed after demo tracker outcome
**PR privacy-configuration #5189**
- [Task](https://app.asana.com/0/0/1214895946163976) — inbox, due today
- Auto-reminder: add individual reviewer on GitHub to ensure the PR gets reviewed.
**On Radar**
- [O-G: Investigate drop in completed-onboarding counts](https://app.asana.com/0/0/1214738867458457) — Alessandro @mentioned someone on Alex's team yesterday re: AB1 question. Monitor — engage if @mentioned.
---
### 🟡 Delegated — Follow Up Needed
| Task | Assignee | Due | Status |
|------|----------|-----|--------|
| [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177) | Deepankar Bajpeyi | 2025-11-17 | **Overdue** — last activity Dec 2025 |
| [assertionFailure when DBP url is opened](https://app.asana.com/0/0/1212305913722018) | Anh Do | 2025-12-12 | **Overdue** — last activity Dec 2025 |
| [Subfeature settings converted to&from String](https://app.asana.com/0/0/1212016050823964) | Sabrina | — | **Stale** — last activity Jan 2026 |
| [Document font usage standards](https://app.asana.com/0/0/1206389088453914) | Stephen (Design) | — | **Stale** — last activity Apr 2026 |
> Deepankar and Anh Do tasks are ancient — ping or close when you have a free moment.
---
### 🔵 Rhythms
**TP:** [Ship Review: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214147157456478) — due today. Builds ready, waiting on Alessandro QA. Not stale — active crunch.
**Next TP Thread:** [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — due Jun 2. No Next TP Thread comment from Alex yet. → **Add to plan: open Next TP Thread once current SR ships.**
**Upcoming this week:**
- **Today:** 1:1 with Dominik · Apple Weekly Team Meeting · O-N Weekly Meeting
- **Friday May 22:** [macOS App Maintenance](https://app.asana.com/0/0/1214837564647979) due · [macOS - Add Pixels: Downloads](https://app.asana.com/0/0/1213572720491214) due (no recent activity since May 15 — block 30 min Thu or Fri)
- **Gary OOO May 1930** — window to formalize Project Advisor role on iOS Address onboarding
---
*Data freshness: my_tasks synced 07:05 local. Project streams synced 07:05 local. asana_context.md stale (generated 01:05 UTC) — brief derived from direct DB queries.*