From 04d20f8cd927d901c002477756970216031bf3be Mon Sep 17 00:00:00 2001 From: Alexey Martemyanov Date: Tue, 19 May 2026 08:01:01 +0600 Subject: [PATCH] Failed to authenticate. API Error: 401 Invalid authentication credentials [2026-05-19] vault sync --- work/briefs/daily/2026-05-19.md | 110 ++++++++++++++++++++++++++++++++ 1 file changed, 110 insertions(+) create mode 100644 work/briefs/daily/2026-05-19.md diff --git a/work/briefs/daily/2026-05-19.md b/work/briefs/daily/2026-05-19.md new file mode 100644 index 00000000..ed7a2cf3 --- /dev/null +++ b/work/briefs/daily/2026-05-19.md @@ -0,0 +1,110 @@ +--- +## Daily Brief โ€” 2026-05-19 + +### โœจ Morning +On May 19, 1962, Marilyn Monroe stepped on stage at Madison Square Garden and sang a breathless, sequin-clad "Happy Birthday, Mr. President" to JFK โ€” 10 days *before* his actual birthday. The dress was so form-fitting it had to be sewn directly onto her body. Still one of pop culture's most iconic 60 seconds. ๐ŸŽ‚๐ŸŽค +๐Ÿšถ Take a short walk before diving in. + +--- + +## Plan for Today + +_Today's focus per weekly plan: 1:1 with Dominik + SR Design Review push. New signals since yesterday: builds posted last night by Alex, Alessandro replied on "Try Visiting a Site: Background" this morning (action needed), DRI async must-haves summary from Alessandro (unread)._ + +1. โšก Mark old [Dominik :: Alex 1:1 Agenda (May 5)](https://app.asana.com/0/0/1214339792109087) complete โ€” meeting has long passed (โ‰ค2 min) +2. ๐Ÿ”ด Reply to Alessandro on [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) โ€” he clarified the design change at 06:02 today (taller background); Alex noted it as non-blocker in SR comment โ€” confirm scope/decision +3. ๐Ÿ”ด Prep agenda + meet with Dominik today โ€” [1:1 Agenda task](https://app.asana.com/0/0/1214742648120931) due today; topics: Project Advisor role kick-off, primary AOR, EP3/EP2 calibration, [ON HOLD] iOS toggle screen status +4. ๐ŸŸ  SR: monitor Alessandro's QA results (builds posted last night); coordinate merge once QA passes +5. Review [DRI <> Project Advisor async](https://app.asana.com/0/0/1213551072611261) โ€” Alessandro's must-haves summary from yesterday (Alex hasn't responded) +6. PR [privacy-configuration #5189](https://app.asana.com/0/0/1214895946163976) โ€” add individual reviewer on GitHub (auto-reminder in inbox, due today) +7. Open Next TP Thread โ€” once SR ships, comment on [iOS Address onboarding conflicts](https://app.asana.com/0/0/1214592943696234) announcing as incoming TP +8. PR Check failing on main โ€” [gid 1213975496167929](https://app.asana.com/0/0/1213975496167929) โ€” 27 days overdue; triage/close when AOR block opens + +--- + +### ๐Ÿ”ด Urgent / Overdue + +**โš ๏ธ iOS: Demo tracker blocking after chat in onboarding** +- [Feature task](https://app.asana.com/0/0/1213551050320249) โ€” due 2026-05-18 (yesterday), top_priority +- [Ship Review](https://app.asana.com/0/0/1214147157456478) โ€” due 2026-05-19 (today) +- **Status (last night):** Alex posted updated builds at 22:29 with all SR issues addressed except toggle animation (flagged as non-blocker). Two fresh build links in SR comments. +- **Waiting for:** Alessandro's QA results โ€” he confirmed yesterday morning he'd run another round today. +- **Action:** Watch for Alessandro's test update. If QA passes โ†’ Costas authorized merge even before Design Review tick. + +**โš ๏ธ Try Visiting a Site: Background** โ€” SR subtask +- [Task](https://app.asana.com/0/0/1214828145455342) โ€” due 2026-05-15, overdue 4 days +- **New comment (06:02 today):** Alessandro clarified the required change: use a taller background image to fill the empty screen (linear-bg-address-bar-preference). Alex had noted this as "not a blocker" in the SR comment. +- **Action:** Reply to Alessandro confirming scope decision โ€” either implement the taller background or explicitly scope out with rationale. + +**โš ๏ธ PR Check is failing on main** +- [Task](https://app.asana.com/0/0/1213975496167929) โ€” due 2026-04-22, active section, **27 days overdue** +- Test: `testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce` +- No new activity since May 13. Separate inbox entry also exists (gid 1214797526093576, due May 15). +- **Action:** Triage when AOR block opens โ€” disable flaky test or confirm fix. + +**โš ๏ธ Dominik :: Alex 1:1 Agenda (May 5)** +- [Task](https://app.asana.com/0/0/1214339792109087) โ€” due 2026-05-05, inbox, overdue 14 days +- **Action:** Mark complete (meeting long passed). + +**โš ๏ธ [ON HOLD] iOS: Introduce new toggle screen** +- [Task](https://app.asana.com/0/0/1213320237636425) โ€” due 2026-05-15, top_priority. ON HOLD. +- **Action:** Confirm hold status with Dominik at today's 1:1. + +**Backlog cluster (no action today):** +- "Bug: Tab preview stuck around" (2025-04-15, macOS Browser Bugs) +- "Assertion Failure Pixel Anomaly" (2025-09-17, planning) +- "Review Overdue Tasks Summary" (2026-01-27, planning) +- "Pinned tab opens link in background" + "Text selection in address bar" (2026-05-01, Internal Product Feedback inbox) + +--- + +### ๐ŸŸ  Needs Action Today + +**Ship Review: Demo tracker (DRI)** +- Builds posted last night โ€” waiting for Alessandro's QA verdict. +- Background subtask design question needs response (see Urgent above). +- [DRI <> Project Advisor async](https://app.asana.com/0/0/1213551072611261): Alessandro summarized must-haves yesterday (last comment unread by Alex). Review the list and confirm which tasks are โญ๏ธ skipped vs. โœ… done. + +**1:1 with Dominik โ€” today** +- [Agenda task](https://app.asana.com/0/0/1214742648120931) due today. Topics from weekly plan: + - Project Advisor role for iOS Address onboarding conflicts (Gary OOO May 19โ€“30 โ€” window to formalize) + - Primary AOR target + - EP2โ†’EP3 calibration status (Christie) + - [ON HOLD] iOS toggle screen โ€” confirm if still needed after demo tracker outcome + +**PR privacy-configuration #5189** +- [Task](https://app.asana.com/0/0/1214895946163976) โ€” inbox, due today +- Auto-reminder: add individual reviewer on GitHub to ensure the PR gets reviewed. + +**On Radar** +- [O-G: Investigate drop in completed-onboarding counts](https://app.asana.com/0/0/1214738867458457) โ€” Alessandro @mentioned someone on Alex's team yesterday re: AB1 question. Monitor โ€” engage if @mentioned. + +--- + +### ๐ŸŸก Delegated โ€” Follow Up Needed + +| Task | Assignee | Due | Status | +|------|----------|-----|--------| +| [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177) | Deepankar Bajpeyi | 2025-11-17 | **Overdue** โ€” last activity Dec 2025 | +| [assertionFailure when DBP url is opened](https://app.asana.com/0/0/1212305913722018) | Anh Do | 2025-12-12 | **Overdue** โ€” last activity Dec 2025 | +| [Subfeature settings converted to&from String](https://app.asana.com/0/0/1212016050823964) | Sabrina | โ€” | **Stale** โ€” last activity Jan 2026 | +| [Document font usage standards](https://app.asana.com/0/0/1206389088453914) | Stephen (Design) | โ€” | **Stale** โ€” last activity Apr 2026 | + +> Deepankar and Anh Do tasks are ancient โ€” ping or close when you have a free moment. + +--- + +### ๐Ÿ”ต Rhythms + +**TP:** [Ship Review: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214147157456478) โ€” due today. Builds ready, waiting on Alessandro QA. Not stale โ€” active crunch. + +**Next TP Thread:** [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) โ€” due Jun 2. No Next TP Thread comment from Alex yet. โ†’ **Add to plan: open Next TP Thread once current SR ships.** + +**Upcoming this week:** +- **Today:** 1:1 with Dominik ยท Apple Weekly Team Meeting ยท O-N Weekly Meeting +- **Friday May 22:** [macOS App Maintenance](https://app.asana.com/0/0/1214837564647979) due ยท [macOS - Add Pixels: Downloads](https://app.asana.com/0/0/1213572720491214) due (no recent activity since May 15 โ€” block 30 min Thu or Fri) +- **Gary OOO May 19โ€“30** โ€” window to formalize Project Advisor role on iOS Address onboarding + +--- + +*Data freshness: my_tasks synced 07:05 local. Project streams synced 07:05 local. asana_context.md stale (generated 01:05 UTC) โ€” brief derived from direct DB queries.*