Files
obsidian-vault/work/briefs/weekly/plan-2026-06-01.md
T

145 lines
10 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan — Week of 2026-06-01
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — Ship Review milestone Fri 2026-06-05, three of four 0.5d/2d subtasks still open and overdue; WWDC AFK starts Mon Jun 8 so this MUST land before Friday.
**Ship Review consolidation**: All SR signals live here. The umbrella TP is in `top_priority`, modified today (not stale). Subtask state:
- [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — PR #5145 CI 🔴, review ⏳. Fix the failing job first thing today.
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 CI ✅, review ✅. Alessandro (2026-06-01 06:53) "let me know when the PR is ready for another look" — reply + merge. **Reaction-only sign-off ≠ approval; rely on his actual comment.**
- [Hide "stop chat" button [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 CI ✅, review ✅. Land today.
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — due today, unstarted, biggest remaining slice. Protect Mon/Tue.
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — due today, unstarted. Wed.
- [Ship Review: iOS Address onboarding…](https://app.asana.com/0/0/1215009192158961) — Alex created/delegated, no reviewer comments yet → MONITORING. Verify scope + green build Thu before Fri.
- [[ON HOLD] iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) — modified 2026-06-01 00:31; on hold pending privacy triage from Jake Abel.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 75% | SR week — bumped from 60% target. Tradeoff: AOR/Career trimmed. |
| AOR | 5% | Light: PRs already pending merge + 1 follow-up review. No new bug intake. |
| Career | 10% | Dominik OOO all week (Jun 15), no 1:1 prep needed. Use slot for Project Advisor doc Part 1. |
| Strategy | 10% | Windows AOT delivery plan reply Tue + WWDC AFK handoff Fri. |
### Shape
**Mon (Jun 1):** TP ramp + Monday ritual — process inbox, set 1-Must
- [Hide "stop chat" button [0.5d]](https://app.asana.com/0/0/1215009192158954) — land
- [Hide Free plan • Upgrade [0.5d]](https://app.asana.com/0/0/1215009192158952) — reply to Alessandro, merge
- [Ship AI onboarding winner [0.5d]](https://app.asana.com/0/0/1215009192158955) — CI fix
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — start
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457)
**Tue (Jun 2):** Continue TP deep work + Strategy reply
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — continue
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987)
- [Desktop Browsers: Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — substantive reply (Ivy starts work this week)
**Wed (Jun 3):** Finish Persist + start Try Visiting
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — close
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — start
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364)
- Triage paired CI-failing-on-main tasks together (see AOR Quick Wins)
**Thu (Jun 4):** SR readiness + PR review queue
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — finish
- Verify [Ship Review](https://app.asana.com/0/0/1215009192158961) scope + green build
- Clear GitHub review-requested queue (6 review-requests + 5 mentions, batch ~30 min)
- [PR: macOS Monterrey-only](https://app.asana.com/0/0/1215150214975916) — push to merge (Diego's Jun 15 critical path)
**Fri (Jun 5):** Ship Review milestone + weekly review + AFK prep
- [Ship Review milestone](https://app.asana.com/0/0/1215009192158961)
- [DRI <> Project Advisor async for Demo tracker](https://app.asana.com/0/0/1213551072611261) — close
- Draft Part 1 of Advisor Readiness doc (30 min) — career action
- Weekly review + WWDC AFK handoff comment if Persist/Try Visiting slip into next week
- [Follow-up: Inline Text Images for TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — REVIEWER, PR #4663 promote out of draft
### Must-Not-Forget
- [ ] **[Ship Review: iOS Address onboarding…](https://app.asana.com/0/0/1215009192158961)** — assignee: Alex
due 2026-06-05 — Alex is DRI; SR scope must be verified Thu, no reviewer comments yet so no sign-off is in motion.
- [ ] **[Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 — Largest unstarted TP subtask; the only one whose slip pushes SR into Alex's AFK window.
- [ ] **[Privacy Triage: iOS Demo tracker blocking after chat](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
Jake's triage overdue since 2026-05-21 — directly blocks the on-hold Demo tracker subtask under this week's TP umbrella. Ping before Fri's SR.
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (5d overdue) — On Diego's confirmed Jun 15 Monterey+ critical path; if Alex's PR doesn't land this week, Diego's release slips.
- [ ] **[WWDC AFK Jun 812 — handoff prep](https://app.asana.com/0/0/1212684797790491)** — assignee: Alex
Partly AFK starts next Mon (Jun 8). If Persist or Try Visiting slip, leave handoff comments on Fri. Otherwise no action — but easy to forget.
### AOR Quick Wins This Week
- **[Desktop Browser Feature Owner Survey [anonymous, 5-min timebox]](https://app.asana.com/0/0/1214940335721015)**
overdue 6 days — 5-minute timebox per task title; clear in any gap.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
overdue 31 days — Stuck in inbox; triage to repro / quick fix or close as dup.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
overdue 31 days — Stuck in inbox; triage to repro / quick fix or close.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check failing on main — testWhenTab…errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 (40d overdue) — AOR: flake vs real regression. Sam S fixed a paired crashy macOS suite overnight; this one still open.
- **[PR Check failing on main](https://app.asana.com/0/0/1214797526093576)**
due 2026-05-15 (17d overdue) — Likely same family. Triage Wed alongside it — one fix may cover both.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (125d overdue) — Planning task; 30-min sweep to triage what's still alive vs close.
(+ 3 aged items >180 days in backlog — not listed: Tab preview stuck 412d, Duo Grafana 313d, Assertion Failure Pixel Anomaly 257d.)
### On Radar
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego confirmed last Big Sur release Mon Jun 8; first Monterey+ merges next week. Alex's Monterrey-only PR feeds this — already a MNF.
- **[SIGKILL inside MainViewController chrome bar reveal animation](https://app.asana.com/0/0/1215224247451374)** — Eduardo Pinto's defensive-weak-captures PR is up. AOR-adjacent (macOS UI lifecycle); monitor for review request.
- **[CEF: Failing tests when 'setTabTitlesEarly' is enabled](https://app.asana.com/0/0/1214378030768173)** — Kris Wright zeroing in on root cause; worth a glance if test-helpers come up at Apple Weekly Tue.
### Career Action This Week
**Draft Part 1 of Advisor Readiness doc** (30 min, Fri block).
Why this and not the others:
- Project Advisor (Not started) is the highest-leverage EP3 lever, zero motion → **picked**.
- Primary AOR discussion needs 1:1; Dominik OOO all week → defer to Jun 15+.
- Calibration follow-up (Christie EP2/3) — defer; doesn't pair well with SR week.
- Assessment visibility — no active O-N/O-L Assessment this week; Windows AOT reply (Strategy) already covers it.
- 1:1 career prep — Dominik OOO Jun 15, no 1:1. Skip.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
Ivy + Mark replied Sat; Ivy picking it up Mon/Tue as her next TP. Alex's prior pushback ("don't get why the decision to spin off another project") is unanswered on substance. Silence reads as acquiescence — **engage Tue with substantive reply** (already in Shape).
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
Boli + Bulcsu discussing isolated worlds w/ new native script injection APIs (~couple days to a week). Apple/macOS-adjacent — **monitor**, engage only if pinged.
### Carried Forward from Last Week
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
→ see TP section above.
- **[PR review queue — 11 items on GitHub](https://github.com/duckduckgo)** — assignee: Alex (reviewer)
6 review-requests (privacy-configuration + apple-browsers) + 5 mentions. None overdue >5d as blocker; batch as one ~30-min Thu block.
- **[DRI <> Project Advisor async for Demo tracker](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
Open async with no clear next-action. Close this loop Friday before SR — either get the Project Advisor's call, or close with "moved to Ship Review thread" comment.
- **[Privacy Triage: Apple - iOS: Demo tracker blocking after chat](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
→ see Must-Not-Forget (10d overdue, blocks TP umbrella).
- **[🤖 Check for dependabot PRs](https://app.asana.com/0/0/1215057989642782)** — assignee: Tom Strba
Maintenance rotation item, due 2026-05-25 (7d overdue). Quick ping — confirm in-progress or pull back.
- **[PR: C-S-S Fix site copy/cut/paste/text selection](https://app.asana.com/0/0/1207521936429896)** — assignee: delegated (unassigned in DB)
Stale 76d, no GitHub PR match. Decide this week: chase, descope, or close.
---
*Based on weekly-review absent (no Friday review on file for 2026-05-29) + DB state as of 2026-06-01 04:21 UTC (snapshot fresh)*
Plan saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-06-01.md`.