184 lines
10 KiB
Markdown
184 lines
10 KiB
Markdown
# Weekly Plan — Week of 2026-06-08
|
||
|
||
**Top Priority**: [Ship Review: iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1215009192158961) — due today (Jun 8), 4-day-old SR needs a close or explicit handoff before Alex goes deep into WWDC'26 this week.
|
||
|
||
**Context**: Alex is **partly AFK Jun 8–12 (WWDC'26)** — light async availability all week. This week is about closing loops from last sprint, not starting new work.
|
||
|
||
---
|
||
|
||
### Ship Review Consolidation
|
||
|
||
SR [iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) opened Jun 4, due **today**.
|
||
|
||
**Status as of Jun 5 (last comments):**
|
||
- Gary confirmed scope: ship only the original experiment winner — "Try visiting a site / tracker blocking" step is **not** included in this release. Costas aligned.
|
||
- Alex clarified the tracker blocker onboarding stays as-is per the validated experiment.
|
||
- Build is up (Jun 4 Alpha 7.223.0).
|
||
- No explicit sign-off comments from reviewers yet (Gary + Costas left scope discussion comments, not approvals).
|
||
|
||
**Action today**: Check if reviewers have approved asynchronously. If not, post a handoff comment ("Partly AFK Jun 8–12 for WWDC; tagging Costas/Gary to close by EOW if no blockers remain") and ensure all subtasks are resolved.
|
||
|
||
**PRs in scope (land-ready today):**
|
||
- [#5271 iOS: Animate search experience toggle](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5271) — CI ✅, approved ✅ → **merge now**
|
||
- [#5149 Hide Free Plan title](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5149) — CI ✅, approved ✅ → **merge now**
|
||
- [#5246 Try Visiting a Site: Background](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5246) — CI 🔴, approved ✅ → investigate CI, then merge
|
||
- [#5145 Ship AI onboarding winner](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5145) — CI 🔴 (3 checks), ⏳ review pending → critical path for Jun 15 deadline
|
||
|
||
**Next TP (queued):** [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — fix CI on #5145 before Jun 15, even async from WWDC.
|
||
|
||
---
|
||
|
||
### Quadrants
|
||
|
||
| Quadrant | This Week | Notes |
|
||
|---|---|---|
|
||
| Project | 70% | SR close + land-ready PR merges + CI fix on #5145 |
|
||
| AOR | 15% | Review requests + new inbox tasks (light) |
|
||
| Career | 10% | Calibration response (time-sensitive) + EP2 TD task |
|
||
| Strategy | 5% | O-L discussion today (WPF→Chrome/AI tools) |
|
||
|
||
---
|
||
|
||
### Shape
|
||
|
||
**Mon:** SR handoff + PR merges + O-L meeting
|
||
- [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — check reviewer status, post handoff comment if not closing today
|
||
- Merge [#5271](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5271) + [#5149](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5149) — land-ready, do it before WWDC sessions
|
||
- Investigate [#5246](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5246) CI failure
|
||
- O-L Weekly Meeting (today, discussion-heavy — AI tools + WPF→Chrome)
|
||
- Triage new inbox tasks: Address Bar Toggle Selection: Animation Delay, Chat Response: Liquid Glass Button Disabled Styling
|
||
|
||
**Tue:** WWDC + Apple Weekly + O-N Weekly (async)
|
||
- Apple Weekly Team Meeting
|
||
- O-N Weekly Meeting
|
||
- 1:1 with Dominik — Dominik **not OOO** this week, 1:1 Agenda task due Jun 9. Confirm whether meeting is happening given WWDC; if yes, keep it brief. If skipping, align with Dominik to move to Jun 15.
|
||
- Async: start CI investigation for #5145
|
||
|
||
**Wed:** WWDC — light async
|
||
- Monitor SR for close/reviewer sign-offs
|
||
- Handle any async review requests (installType/installAge PR, phishing protection datasets)
|
||
|
||
**Thu:** WWDC — light async
|
||
- Career action: EP2 TD calibration response to Sam S (15 min)
|
||
- Async: if CI on #5145 fixed, keep PR ready to land
|
||
|
||
**Fri:** WWDC close-out + loop check
|
||
- Confirm SR is closed or escalated
|
||
- Check [Check Experiment before Jun/15](https://app.asana.com/0/0/1215319739446270) — what experiment, what's needed?
|
||
- Weekly review (abbreviated — WWDC week)
|
||
|
||
---
|
||
|
||
### Must-Not-Forget
|
||
|
||
- [ ] **[Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)** — assignee: Alex
|
||
due **today Jun 8** — SR is 4 days old with scope questions resolved; needs sign-off from reviewers or explicit WWDC handoff comment today.
|
||
|
||
- [ ] **[Localize duck.ai onboarding path](https://app.asana.com/0/0/1215401767389378)** — assignee: Alex
|
||
due **today Jun 8** — Smartling job launched Jun 4; verify it completed and strings are in. If not, escalate before going into WWDC.
|
||
|
||
- [ ] **[Check Experiment before Jun/15](https://app.asana.com/0/0/1215319739446270)** — assignee: Alex
|
||
no due date noted, deadline Jun 15 — unclear what experiment this is; needs clarification before Alex is fully in WWDC mode.
|
||
|
||
- [ ] **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||
originally due 2026-05-28 (overdue) — CI on #5145 is 🔴 (3 failing checks); must clear before Jun 15 or the experiment window closes while Alex is AFK.
|
||
|
||
- [ ] **[EP2 TD Calibration - Alex](https://app.asana.com/0/0/1214121856485500)** — assignee: Alex
|
||
in inbox (no date) — calibration task sitting in inbox; Sam S also left scoring notes on the related EP2 TD Review Calibration - 7a2 asking for Alex's response. Time-sensitive — Sam asked Jun 8.
|
||
|
||
---
|
||
|
||
### AOR Quick Wins This Week
|
||
|
||
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
|
||
overdue 13 days — anonymous, 5-minute timebox. Do immediately.
|
||
|
||
- **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)**
|
||
overdue 12 days — review PR, approve or comment.
|
||
|
||
- **[Address Bar Toggle Selection: Animation Delay](https://app.asana.com/0/0/1215444621777798)**
|
||
due today Jun 8 (new inbox) — follow-up to last week's Animated Assets; assess scope before WWDC.
|
||
|
||
- **[Chat Response: Liquid Glass Button Disabled Styling](https://app.asana.com/0/0/1215443604066309)**
|
||
due today Jun 8 (new inbox) — new UI task; triage to determine if it blocks SR or is separate.
|
||
|
||
- **[PR: Apple: Add installType and installAge (review request)](https://app.asana.com/0/0/1215447467162920)**
|
||
due today Jun 8 — review PR assigned to Alex, can do async.
|
||
|
||
---
|
||
|
||
### Sprint Backlog (pick 1–2 if time allows)
|
||
|
||
- **[PR Check is failing on main - errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
|
||
overdue 47 days — Alex asked owner to disable the test (PR still pending from owner); follow up.
|
||
|
||
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
||
overdue 38 days — macOS bug in Internal Product Feedback; hasn't been touched.
|
||
|
||
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
|
||
overdue 11 days — follow-up from executor PR #4663; minor scope.
|
||
|
||
(+ 4 aged items >180 days in backlog — not listed)
|
||
|
||
---
|
||
|
||
### On Radar
|
||
|
||
- **TD: [Run E2E tests with internal feature flags (iOS & macOS)](https://app.asana.com/0/0/1215318048361450)** — Eduardo pinged the DRI of the feature flag override decoupling; if this touches Alex's feature flag work, engage.
|
||
|
||
- **TD: [Proposed AOR: DDG Auth Client - Apple](https://app.asana.com/0/0/1213532539230149)** — Federico asking if AOR can have no secondary (Federico going on paternity leave soon); relevant to Alex's AOR discussions. Monitor.
|
||
|
||
- **O-L Weekly meeting agenda** — Ivy flagged heavy discussion on AI tools during "upcoming WPF→Chrome" (comment truncated). Strategic signal — pay attention to this thread.
|
||
|
||
- **TD: [Hotfix Release Process Improvements](https://app.asana.com/0/0/1215441352155954)** — Eduardo asking team for process feedback. Low urgency; respond if you have a quick note.
|
||
|
||
---
|
||
|
||
### Career Action This Week
|
||
|
||
**Respond to Sam S on [EP2 TD Review Calibration - 7a2 (Alex)](https://app.asana.com/0/0/1215285052893281)** (15 min)
|
||
Sam left calibration score notes on Jun 8 asking for Alex's response on 2 mismatched criteria. Time-sensitive — respond before or during WWDC async time Thu/Fri.
|
||
|
||
*Skipped: Project Advisor readiness doc (Not started, highest long-term leverage) — WWDC week is not the right slot for a 30-min writing task; defer to Jun 15 when Alex returns. Primary AOR discussion and 1:1 career prep both depend on having a clear 1:1 slot — confirm with Dominik this week whether 1:1 is Jun 9 or Jun 15.*
|
||
|
||
---
|
||
|
||
### On Radar / Participation Needed
|
||
|
||
- **[EP2 TD Review Calibration - 7a2 (Alex)](https://app.asana.com/0/0/1215285052893281)**
|
||
Sam S commented Jun 8: "Let me know what you think about my rationale for having a lower score" on 2 mismatched calibration criteria — **engage** (career-relevant, responded within 48h expected).
|
||
|
||
- **[macOS App Maintenance](https://app.asana.com/0/0/1215492368428078)**
|
||
James Frost handed off to next person Jun 8 with a bug in Internal Incoming — **monitor** whether it lands in Alex's queue.
|
||
|
||
---
|
||
|
||
### Carried Forward from Last Week
|
||
|
||
- **[Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)**
|
||
→ see TP section above
|
||
|
||
- **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)**
|
||
CI on #5145 🔴 (3 failing checks: Test Non-Sandbox, Translated Strings, Test Report). Awaiting review. Must land by Jun 15. Next action: fix CI failures.
|
||
|
||
- **[Ship Review: (iOS Only) Ensure compatibility on iPad](https://app.asana.com/0/0/1215411924225093)**
|
||
Opened Jun 4, no due date, no reviewers yet. Likely post-WWDC work — flag for week of Jun 15.
|
||
|
||
- **[#5246 Try Visiting a Site: Background](https://dub.duckduckgo.com/duckduckgo/apple-browsers/pull/5246)**
|
||
CI 🔴 (flaky check), approved ✅. Next action: investigate CI, then merge.
|
||
|
||
- **[Integration test errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
|
||
Alex asked owner to push a disable PR — still waiting. Next action: follow up with owner.
|
||
|
||
- **[Pinned tab activates in other window unpinning](https://app.asana.com/0/0/1210705465887828)** — owner: Juan Pereira
|
||
Juan moved due date; last modified today (Jun 8). Monitor for resolution.
|
||
|
||
- **[AI Usage Limits submission](https://app.asana.com/0/0/1215446967141154)** — delegated
|
||
Jeffrey added as collaborator Jun 5; org-level API key question raised with HR/IT. Next action: check if resolved.
|
||
|
||
- **Localization Smartling job** — monitor completion (job launched Jun 4 for duck.ai onboarding path).
|
||
|
||
---
|
||
|
||
*Based on weekly-review 2026-06-05 + DB state as of 2026-06-08 08:05 UTC*
|