Files
obsidian-vault/work/briefs/daily/2026-06-08.md
T

98 lines
6.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-06-08
### ✨ Morning
**Today is World Oceans Day.** Oceans produce over half of Earth's oxygen and have absorbed ~30% of all human CO₂ emissions since industrialization. The sea is doing a lot of the work quietly.
🚶 Take a short walk before diving in.
---
## Plan for Today
_WWDC'26 week — partly AFK Jun/812. No weekly plan found for this week. 6 task updates since Friday, 0 new comments._
_Today's focus: Ship Review build update (committed Friday) + O-L Weekly Meeting._
1. ⚡ Desktop Browser Feature Owner Survey — 5-min anonymous survey, overdue 13d. [→ open it now](https://app.asana.com/0/0/1214940335721015)
2. 🔴 **Update Ship Review build** — you said Friday you'd push an updated build on Monday. [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) is due today. Design (Costas reviewing) + PR (Alessandro) + iPad compatibility (you are DRI) all open.
3. 🔴 **Review: Add installType/installAge to Duck.ai native config** — due today, review request in GitHub. Highest-priority in batch.
4. 🟠 **O-L Weekly Meeting** — today. Ivy: "leaning heavily toward discussion topics, add kick-offs/Ship Reviews I'm missing."
5. 🟠 **Create Mattermost Bots request** — reply to Jake/Isabel comments on channel lifecycle. Due today. ([→ task](https://app.asana.com/0/0/1214799615211686))
6. 🟠 **6 more PR reviews queued** — batch after TP work (phishing datasets, nativeStorage rollout, ad blocking soft launch, macOS observability, force-unwrap fix, Maestro tests)
7. 🟡 Inbox due today: [Address Bar Toggle Selection: Animation Delay](https://app.asana.com/0/0/1215444621777798) · [Chat Response: Liquid Glass Button Disabled Styling](https://app.asana.com/0/0/1215443604066309) · [Localize duck.ai onboarding path](https://app.asana.com/0/0/1215401767389378)
---
### 🔴 Urgent / Overdue
**[ACTIVE] [Ship Review: iOS Address onboarding conflicts](https://app.asana.com/0/0/1215009192158961)** — due Jun 8 (today)
- Context: Ship Review opened Jun 5. Alex commented Jun 5: "will update the build on Monday." Design subtask → Costas (reviewing, said she'd check Jun 5). PR subtask → Alessandro. iPad compatibility subtask → Alex M (open, no activity).
- Action: Push updated build to TestFlight today → comment in Ship Review. Check iPad compatibility subtask.
**[INBOX] [PR: Add installType and installAge — apple-browsers](https://app.asana.com/0/0/1215447467162920)** — due Jun 8 (today), also in GitHub review queue
- Action: Review the PR.
**[ACTIVE] [PR Check is failing on main — testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929)** — due Apr 22 (47d overdue)
- Context: Sam S posted a fix PR Jun 5; fix succeeded overnight. Verify Sam's PR has landed. If not, follow up.
- Action: Check CI on main; close task if green.
_Backlog cluster (do_later / quick_wins + chronic stale inbox — not urgent today):_ "Bug: Tab preview stuck" (419d), "Duo login to Grafana" (320d), "Assertion Failure Pixel Anomaly" (264d), "Review Overdue Tasks Summary Jan 2026" (132d), "Proposal: Phase out Singletons" (1050d in do_later), and ~15 quick_wins items. Not surfaced individually — dates are stale by design.
---
### 🟠 Needs Action Today
**Ship Reviews (DRI)**
[Ship Review: iOS Address onboarding conflicts](https://app.asana.com/0/0/1215009192158961) — 3 open subtasks:
- Design: [Ship Review: Design](https://app.asana.com/0/0/1215412195096173) → Costas is reviewing (said she'd look Jun 5). **Waiting for Costas** after today's build push.
- PR: [Ship Review: Pull Request(s)](https://app.asana.com/0/0/1215412058990638) → Alessandro reviewing. **Waiting for Alessandro.**
- iPad: [Ship Review: (iOS Only) Ensure compatibility on iPad](https://app.asana.com/0/0/1215411924225093) → Alex M is DRI. **Alex is the blocker** — no activity, needs checking.
**PR Reviews**
7 review requests queued — batch after TP block:
1. Add installType/installAge to Duck.ai native config ← due today, top priority
2. Update phishing protection datasets to 1742170
3. Bump nativeStorage rollout to 100%
4. Enable ad blocking feature availability — soft launch
5. [macOS] Improve value transformer failure observability
6. [macOS] Avoid a force unwrap crash when calling debugDescription
7. Fix maestro tests
**Mattermost Bots request**
Jake (Jun 5): "Best to have only 13 channels; consider using Asana tasks for lifecycle tracking instead of opening/closing Mattermost channels."
Isabel (Jun 5): "Channels persist even when archived — MM doesn't delete channels."
Action: Reply with revised approach (consolidate channels, use Asana tasks for signaling resolution). ([→ task](https://app.asana.com/0/0/1214799615211686))
**Try a Search or AI Chat: Search box height** — Costas commented Jun 5 "let's do it." Action: confirm scope + next step. ([→ task](https://app.asana.com/0/0/1215443604066305))
---
### 🟡 Delegated — Follow Up Needed
**[OVERDUE] Pinned tab activates in other window unpinning** → Juan Pereira — due Jun 5 (3d overdue). Juan changed due date Jun 3; no activity since.
Suggest: "Hey Juan, any update on this one?"
**[STALE 14d] 🤖 Check for dependabot PRs** → Tom Strba — due May 25. Assigned May 25; no further activity.
Suggest: Ping Tom or close if handled separately.
**[STALE] macOS App Maintenance rotation tasks** (Daily Status MonFri, May 22 batch) — 5 overdue delegated subtasks. Last activity May 22. These appear abandoned mid-rotation.
Action: Check if rotation was completed or needs handoff.
---
### 🔵 Rhythms
**TP**: [iOS Address onboarding conflicts](https://app.asana.com/0/0/1214592943696234) — in Ship Review phase. Last meaningful update Jun 4 (status comment + PR up). Current TP is not stale. **Not yet close to completion** (Design + PR approvals still pending) → no Next TP Thread needed yet.
**Active rotation**: None.
**Upcoming this week:**
- 1:1 with Dominik — [agenda task Jun 9](https://app.asana.com/0/0/1215321590086377). First 1:1 since June 15 Dominik OOO (LDX3). Agenda items ready?
- Apple Weekly Team Meeting — Jun 9
- O-N Weekly Meeting — Jun 9
- **WWDC'26 partly AFK Jun/812** — have you communicated coverage expectations to team?
- [Check Experiment before Jun/15](https://app.asana.com/0/0/1215319739446270) — reminder set Jun 2; window closes in 7 days
- [EP2 TD Calibration - Alex](https://app.asana.com/0/0/1214121856485500) — last activity Jun 6; check if Christie needs a response