Files
obsidian-vault/work/briefs/weekly/plan-2026-05-25.md
T

138 lines
9.2 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan — Week of 2026-05-31
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — DRI, project due 2026-06-05, all four onboarding subtasks land this week, then Ship Review.
Current state (from May/29 status update):
- [Hide Free plan • Upgrade](https://app.asana.com/0/0/1215009192158952) — PR #5149 CI ✅ waiting review
- [Hide "stop chat" button](https://app.asana.com/0/0/1215009192158954) — PR #5173 CI ✅ waiting review
- [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950) — in progress, plan to complete Mon Jun 1
- [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — PR #5145 CI 🔴 + scope question open (Alessandro flagged conflict with running tracker-blocker experiment; Costas confirmed iPhone-only). Decision needed before merge.
- [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — subtask exists, needs to open during Tue O-N or Wed kickoff slot
- Kickoff: Costas (May/25) offered the O-N Weekly slot for Tue Jun 2
**Why this is TP**: Hard due Jun 5; reviewer sign-off still pending on three PRs (only ✅ are CI reactions, not approvals); Alex is at WWDC Jun 812 next week — this MUST close before AFK or the project slips two weeks.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | SR-driven; pre-AFK close-out |
| AOR | 10% | Light week — overdue feature flag + pixel cleanups; Monterey-only PR |
| Career | 15% | No 1:1 (Dominik OOO Jun 15) — bank the time on Project Advisor doc instead |
| Strategy | 5% | One assessment/AOR-thread comment |
Adjustments: Ship Review week → Project pushed to 70% (tradeoff: AOR sprint backlog deferred). Career boosted because no 1:1 means an uninterrupted 30 min Project Advisor block — direct EP3 lever.
### Shape
Today is Sunday 2026-05-31 — shape starts Monday.
**Mon Jun 1:** TP deep work + week setup
- [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950) — finish implementation
- [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — reply to Alessandro/Costas on experiment-conflict decision; fix CI 🔴 on PR #5145
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457)
- Set 1-Must = finish Persist 'You've got this' PR
**Tue Jun 2:** TP kickoff + Apple Weekly
- [iOS project Kick-off](https://app.asana.com/0/0/1214592943696234) — propose at [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364) (Costas offered the slot)
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987)
- Address review feedback as PRs come back (#5149, #5173)
**Wed Jun 3:** TP — open Ship Review
- [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — open SR, post status + linked PRs, request reviewers
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364)
- Career block: 30 min — [Project Advisor Readiness Self-Reflection — Part 1](https://app.asana.com/0/0/1210386994396212)
**Thu Jun 4:** TP — address SR feedback + AOR clean-up
- Merge any approved onboarding PRs
- [PR: Monterrey-only](https://app.asana.com/0/0/1215150214975916) — push to merge before WWDC AFK (Diego confirmed Jun 8 = last Big Sur version)
- AOR quick wins (see below)
**Fri Jun 5:** Close the loop + pre-AFK handoff
- SR sign-off — chase any pending reviewer
- Mark [iOS Address onboarding project](https://app.asana.com/0/0/1214592943696234) complete
- Write weekly review
- Handoff brief for WWDC AFK Jun 812 (note who covers [ON HOLD] demo experiment monitoring)
**Note: no 1:1 with Dominik this week** — he is OOO Jun 15 (LDX3 + Public Holiday). Next likely 1:1 = week of Jun 15 (Alex AFK Jun 812 immediately after Dominik's return). Skipping 1:1 prep.
### Must-Not-Forget
- [ ] **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (overdue 3d) — Alessandro asked May/29 whether to wait for experiment min-sample-size before flipping Treatment B; this blocks merge. PR #5145 CI is 🔴. Decision + fix needed.
- [ ] **[Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 — committed in May/29 status to land Mon. Protect Monday for this.
- [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (overdue 4d) — Diego confirmed last Big Sur version ships Jun 8 and Monterey+ merges next week. WWDC week is Alex's AFK → land this Thu Jun 4 or it slips.
- [ ] **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — assignee: Alex
due 2026-05-28 (overdue 3d) — executor PR #4663 is draft + ✅, waiting on Alex to flip to ready and request review.
- [ ] **[Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961)** — assignee: Alex (subtask of TP)
due Jun 5 — only Alex/system stories in thread; reviewer comments are zero. Must open SR no later than Wed so reviewers have 2 days.
### AOR Quick Wins This Week
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
overdue 2d — Dax bot reminder May/30 + Nastia ping May/26 "do you still need these pixels?" → answer + PR or extend due date.
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
overdue 37d — pair this with the pixel removal above; same feature, single cleanup PR.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check is failing on main — testWhenTabWithConnectionLostError...](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 (overdue 39d) — active CI failure on main; quiet since May/13.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
due 2026-05-15 (overdue 16d) — Apple CI Failing Tests inbox; needs triage.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (overdue 30d) — Internal Product Feedback; one-line repro needed.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (overdue 30d) — Internal Product Feedback; quick triage candidate.
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
due 2026-05-26 (overdue 5d) — 5-min timebox; do during Mon inbox sweep.
(+ 3 aged items >180 days in backlog — not listed)
### On Radar
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged May/30 that the `site_loading_performance` pixel is no longer sending on macOS. Touches Alex's secondary AOR (crash/pixels). Watch the thread; engage only if a macOS owner is needed.
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — Dax bot posted enrollment data May/28 showing no `app_use d5-7` conversions yet. Directly relevant to Treatment B ship decision — monitor this thread as input to MNF #1.
### Career Action This Week
**Selected**: Draft Part 1 of [Project Advisor Readiness Self-Reflection](https://app.asana.com/0/0/1210386994396212) — 30 min, Wed afternoon.
Why this one:
- Project Advisor is the highest-leverage EP3 signal (career-notes #1, status: Not started).
- No 1:1 prep needed (Dominik OOO Jun 15) → Career time is free.
- Primary AOR target discussion (#2) requires a 1:1 to land — defer to week of Jun 15.
- Christie calibration follow-up (#4) is overdue but should bundle into the next 1:1.
- Assessment visibility comment (#3) covered separately under Strategy quadrant.
### On Radar / Participation Needed
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
Elle (May/30): macOS `site_loading_performance` pixel missing — engage if no other macOS owner picks it up by mid-week.
### Carried Forward from Last Week
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)**
→ see TP section above
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — Alex
Created by Alessandro on May/29 ("Since you were OOO I created that"). Asynchronous task to coordinate with project advisor while tracker-demo experiment is on hold. Next action: post initial sync comment Mon.
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
Was due 2026-05-26 (last Tue's 1:1, likely already happened). No new agenda items posted since. Defer all career items to next 1:1 (target week of Jun 15 — Dominik OOO this week, Alex AFK next week).
- **[Discord GDPR follow-up](https://app.asana.com/0/0/1215193471130270)** — Alex
Due Jun 15; just a watch item this week.
---
*Based on DB state as of 2026-05-31 11:12 UTC (sync snapshot); no prior weekly review found on disk — built from snapshot + career-notes + recurring-rhythms. Saved to `plan-2026-05-25.md` per supplied MONDAY_DATE.*