115 lines
9.7 KiB
Markdown
115 lines
9.7 KiB
Markdown
---
|
||
## Daily Brief — 2026-05-28
|
||
|
||
### ✨ Morning
|
||
On May 28, 1959, two monkeys — Able (a rhesus) and Baker (a squirrel monkey small enough to fit in a coconut) — rode a Jupiter rocket 360 miles up at 10,000 mph and became the first primates ever recovered alive from space. Baker lived another 25 years afterward, mostly on a diet of bananas at the U.S. Space & Rocket Center.
|
||
💧 Start with a glass of water.
|
||
🧖 Sauna day — don't skip it.
|
||
|
||
Today's focus per weekly plan: Deep work on new TP — **Address Bar Toggle: Animated Assets [2-3d]** (primary) + Try Visiting a Site Background (secondary). Buffer for CI/AOR.
|
||
New signals since yesterday: 15 task changes (mostly AFK auto-rolls), 0 new comments (AFK respect held). One correction from yesterday's brief: the **Demo tracker PR (1214425079182350) is NOT deleted** — it's still open and now 1d overdue.
|
||
|
||
---
|
||
|
||
## Plan for Today
|
||
|
||
1. ⚡ **Desktop Browser Feature Owner Survey** — anonymous, 5-min timebox. Was item #1 Wed; still uncompleted. Knock it out before anything else.
|
||
2. 🔴 **Draft Incident Postmortem: AI Agent use** — **DUE TODAY**. Security incident, 7 days since assigned, no draft. First real work block.
|
||
3. 🔴 **Nudge Jake on Privacy Triage** (7d overdue) — one-line ping; blocks closing old TP.
|
||
4. 🔴 **Demo tracker PR — verify state + reassign reviewer** (1d overdue). Yesterday's brief mistakenly assumed it was completed; it's not.
|
||
5. 🟠 **Reply to Alessandro AB1–AB5** on TP kick-off + close Project Advisor async (Ship Review subtask already exists).
|
||
6. 🟠 **TP deep work block — Animated Assets [2-3d]** (primary block of the day).
|
||
7. 🟠 **TP subtask: Ship AI onboarding winner [0.5d]** (due today) — pair into TP block if room.
|
||
8. 🟠 **Triage: Inline Text Images to TypingTextAnimation** (due today; macOS Release Board).
|
||
9. 🟠 **Reply to Nastia** on Warn Before Quit pixels — quick yes/no.
|
||
10. 📋 **8 PR reviews queued** — batch after TP block.
|
||
|
||
Ordering notes: No 1-Must override (yesterday's 1-Must was completed at 05:08 today). Item 1 is the easy momentum starter. Items 2–4 are hard-due-today / overdue blockers. Items 5–7 are the weekly plan focus. Items 8–10 are smaller asks / batched work.
|
||
|
||
---
|
||
|
||
### 🔴 Urgent / Overdue
|
||
|
||
**[DUE TODAY] DRI** — [Incident Postmortem: AI Agent use via likely external Discord service](https://app.asana.com/0/0/1214996544314182) (due 2026-05-28)
|
||
Context: Assigned 2026-05-22; 7 days; no draft visible. Security-category incident. Sibling task [Postmortem: Security Triage AI: edit link](https://app.asana.com/0/0/1214996544314187) has no due date, 7 days old.
|
||
Action: Draft postmortem OR post status comment with timeline today. Handle this BEFORE the TP deep block — security postmortems are not negotiable on due date.
|
||
|
||
**[OVERDUE 1d] DRI / PR-author** — [PR: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214425079182350) (due 2026-05-27)
|
||
Context: Last week's TP shipping PR. Alessandro asked 2026-05-22 about toggle visibility during onboarding. Alex publicly committed Mon to "review pass and reassign to [reviewer]." No new activity since Mon.
|
||
Action: Open PR, answer Alessandro's toggle question if not done, hand reviewer baton off. ~30 min.
|
||
|
||
**[OVERDUE 6d] DRI** — [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) (due 2026-05-22)
|
||
Context: Parent task of old TP. Still blocked by (a) Privacy Triage (Jake, 7d overdue), (b) the PR above. Costas asked Mon for a wrap-up pinned comment; Alex posted one at 14:29 Mon.
|
||
Action: Once PR is handed off and Jake nudged, this is positioned to close on Fri. No action on the parent today beyond unblocking pieces.
|
||
|
||
**[OVERDUE 2d] DRI** — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) (due 2026-05-26)
|
||
Context: 5-min anonymous timebox. Was item #1 Wednesday; AFK absorbed it. No content blocker.
|
||
Action: First 5 minutes of the day. Done.
|
||
|
||
**[OVERDUE 6d] DRI** — [Full Analysis](https://app.asana.com/0/0/1214900901154134) (due 2026-05-22)
|
||
Context: Ambiguous title; no project context in snapshot. Stale since 2026-05-21.
|
||
Action: Open, either action or close. 10 min budget; if it's not obvious what it is, close or re-scope.
|
||
|
||
**[OVERDUE 13d] AOR** — [PR Check is failing on main](https://app.asana.com/0/0/1214797526093576) (due 2026-05-15)
|
||
Context: Main-branch CI failure; in inbox. No activity since May 17. Has been carried across two daily briefs without progress.
|
||
Action: Diagnose during AOR buffer block (after TP). If it's not a 30-min fix, post a status comment naming the test and add to backlog. Don't let it sit unacknowledged a third day.
|
||
|
||
**Backlog cluster** (informational — stale dates expected, do_later / quick_wins / aged inbox): CI failing test - testWhenTabWithConnectionLost (active, Apr 22) · Pinned tab opens link in background (May 1) · Text selection in address bar (May 1) · Tab preview stuck (Apr 2025) · Duo login Grafana · Assertion Failure Pixel · Review Overdue Tasks meta (Jan 2026) · Feature flag warnBeforeQuit · mac_malicious-site-protection client-timeout. Not actioned today.
|
||
|
||
---
|
||
|
||
### 🟠 Needs Action Today
|
||
|
||
**AUTHOR — New TP: reply to Alessandro AB1–AB5**
|
||
[iOS Address onboarding TP](https://app.asana.com/0/0/1214592943696234) — Alessandro posted 5 scope questions on the [kick-off task](https://app.asana.com/0/0/1214592851898713) at 14:25 Mon. Alex posted a kick-off update at 21:30 Mon, but it didn't explicitly answer AB1–AB5. No new comments since (AFK respected).
|
||
Action: Reply in-thread to each of AB1–AB5. Specifically AB1 — add implementation estimate to [Ship AI onboarding winner](https://app.asana.com/0/0/1215009192158955). AB2 — clarify animated assets scope/assignment.
|
||
Also: post on [DRI ↔ Project Advisor async](https://app.asana.com/0/0/1213551072611261) confirming Ship Review task [1215009192158961](https://app.asana.com/0/0/1215009192158961) already exists.
|
||
|
||
**DRI — TP deep work: Animated Assets [2-3d] (primary block today)**
|
||
[Address Bar Toggle Selection: Animated Assets [2-3d]](https://app.asana.com/0/0/1214627423981798) — due 2026-06-04. Per weekly plan, this is Thursday's primary block.
|
||
Action: After items 1–5 above, this is the long block of the day. Try Visiting a Site Background is the secondary if assets land faster than estimated.
|
||
|
||
**DRI — TP subtask due today: Ship AI onboarding winner (Treatment B) [0.5d]**
|
||
[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — due 2026-05-28. Half-day estimate; small relative to Animated Assets.
|
||
Action: Fold into TP block if there's a natural break. Add Alessandro's-requested estimate to the task notes (covers AB1 simultaneously).
|
||
|
||
**DRI — Follow-up: Inline Text Images to TypingTextAnimation (due today)**
|
||
[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — due 2026-05-28. macOS Release Board. New in cycle; not yet triaged. There is a related [PR #4663](https://github.com/duckduckgo/apple-browsers/pull/4663) in your open PRs ("Add inline image support to AnimatableTypingText") — likely tied.
|
||
Action: Open both, decide if the task is "PR is the work" (close task when PR merges) or further work needed. 10 min.
|
||
|
||
**DRI — Nastia's query on Warn Before Quit pixels**
|
||
[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — Nastia commented Mon 16:50: "do you still need these pixels?"
|
||
Action: Quick yes/no reply. Same task as the linked feature-flag-warnBeforeQuit removal in backlog — pair them if you can answer in one go.
|
||
|
||
**PR Reviews — batch (8 queued, no change vs yesterday)**
|
||
Drop macOS Big Sur · Simplify TabBarViewController · Bump nativeStorage 100% · Enable ad blocking soft launch · Improve value transformer failure observability · Avoid force unwrap crash · Fix maestro tests · Enable iPad toggle iOS 7.211.
|
||
Action: After TP block, single batch pass. Full list is in `asana_context.md`.
|
||
|
||
---
|
||
|
||
### 🟡 Delegated — Follow Up Needed
|
||
|
||
**OVERDUE 7d** — [Privacy Triage: Apple — iOS: Demo tracker blocking](https://app.asana.com/0/0/1214965405681675) — Jake Abel, due 2026-05-21
|
||
No activity since May 20. Directly blocks closing old TP. Yesterday's brief flagged this; AFK day passed without contact.
|
||
Follow-up: "Hi Jake — back from the holiday. Any update on this privacy triage? It was due May 21 and is the last open piece blocking close-out of the Demo tracker TP."
|
||
|
||
**OVERDUE 3d** — [🤖 Check for dependabot PRs](https://app.asana.com/0/0/1215057989642782) — Tom Strba, due 2026-05-25
|
||
Maintenance cycle subtask. Likely just a rolled-forward maintenance item; verify if it should be marked done or extended into Tom's current week.
|
||
|
||
**Due tomorrow** — [Pinned tab activates in other window unpinning](https://app.asana.com/0/0/1210705465887828) — Juan Pereira, due 2026-05-29. No follow-up needed today.
|
||
|
||
**GitHub ↔ Asana correlation**: no merged-but-not-closed delegated tasks detected.
|
||
|
||
---
|
||
|
||
### 🔵 Rhythms
|
||
|
||
**TP:** [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — due 2026-06-05. Kick-off complete ✅. Alessandro AB1–AB5 reply still pending (#1 conversational debt on TP). Animated Assets is today's primary block. Next TP Thread: ✅ already open.
|
||
|
||
**Upcoming:**
|
||
- 📅 Fri 2026-05-29: Close loops + weekly review (catch up on missing 2026-05-22 review) + handoff [macOS App Maintenance](https://app.asana.com/0/0/1215057986055515) to Tom (already assigned).
|
||
- 📅 Mon 2026-06-01: O-L Weekly Meeting. Dominik OOO begins 2026-06-01 (LDX3 through Jun 3).
|
||
- 📅 Tue 2026-06-02: Apple Weekly Team Meeting — Dominik OOO, host needed (Dominik flagged Mon).
|
||
- 📅 Wed 2026-06-03: O-N Weekly Meeting.
|
||
- 📅 Jun 8–12: WWDC'26 (partly AFK) — 11 days out.
|