Files
obsidian-vault/work/briefs/weekly/plan-2026-06-01.md
T

151 lines
11 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan
---
## Weekly Plan — Week of 2026-06-01
**Note**: No prior weekly review file exists for 2026-05-29. This plan is seeded from current Asana state and the existing carry-forward signals in My Tasks `top_priority` section.
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella deliverable due Fri 2026-06-05; four sub-tasks already in `top_priority` (Persist dialogue [2d], Hide Free Plan, Hide stop button, Ship AI onboarding winner) converge on it; Ship Review subtask `1215009192158961` is created and downstream. This is the visible shipping event for the week, and three of the four sub-tasks are already overdue 34 days.
**Career Advisor status**: Dominik OOO entire week — LDX3 Jun 13 + Public Holiday Jun 45. **1:1 SKIPPED this week.** Next bi-weekly window Jun 1517 is also at risk because Alex is partly AFK for WWDC'26 Jun 812. Realistic next 1:1: week of Jun 15.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | **70%** | TP cluster is large; Ship Review Fri is the gating event — bumped above 60% target. |
| AOR | **10%** | Light week — two CI-failing-on-main tasks need triage; one delegated review-request batch on GitHub. |
| Career | **15%** | Above 5% floor: 1:1 skipped, but Project Advisor draft is overdue per career-notes and needs the cycle. |
| Strategy | **5%** | Windows AOT delivery plan response to Ivy/Mark — a scoping decision Alex wanted to influence. |
### Shape
**Mon 06-01:** Ramp + ship the 0.5d's
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457) (recurring, today)
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — start; due today
- [Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955) — PR #5145 CI is red → fix CI failure first, then merge
- [Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952) — PR #5149 approved; Alessandro asked 06:53 today "let me know when the PR is ready for another look" → ping him + merge
- Set 1-Must for today
**Tue 06-02:** Onboarding cluster + strategic comment
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987) (recurring)
- [Persist 'You've got this' dialogue [2d]](https://app.asana.com/0/0/1215009192158950) — continue / finish
- [Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954) — PR #5173 CI ✅, review ✅ → land
- **Strategy:** Reply on [Desktop Browsers: Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy + Mark replied Sat; Ivy plans to "pick it up Mon/Tue as next top priority." Silence reads as acquiescence on a scoping decision.
**Wed 06-03:** Build out remaining TP + clear CI
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364) (recurring)
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — start
- Triage two CI-failing-on-main tasks (1213975496167929, 1214797526093576)
- [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916) — on Diego's critical path (Monterey+ release Jun 15); push to merge this week
**Thu 06-04:** Close loops; PR review backlog
- [Try Visiting a Site: Background [1d]](https://app.asana.com/0/0/1214828145455342) — finish
- Clear GitHub review-requested queue (6 PRs pending Alex's review)
- Verify SR scope: [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — confirm subtasks listed and build is green
**Fri 06-05:** Ship Review + retro + career
- [iOS Address onboarding conflicts...](https://app.asana.com/0/0/1214592943696234) — Ship Review milestone (project due today)
- [DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261) — close out async DRI sync before WWDC AFK
- **Career action** — Draft Part 1 of Advisor Readiness doc (see Career Action below)
- Write weekly retrospective (Dominik OOO → no 1:1 prep this week)
- WWDC AFK starts Mon Jun 8 — write handoff comment on TP cluster if Persist or Try Visiting slip
### Must-Not-Forget
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (overdue 4d) — PR #5145 CI is red; this is the bottleneck for the AI onboarding ship. Alex needs to fix the failing job before merge can happen.
- [ ] **[Hide Free plan • Upgrade in onboarding [0.5d]](https://app.asana.com/0/0/1215009192158952)** — assignee: Alex
due 2026-05-28 (overdue 4d) — PR #5149 is **approved**; Alessandro asked at 06:53 today "let me know when the PR is ready for another look." Ping + merge Mon.
- [ ] **[Hide "stop chat" button in the input box [0.5d]](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
due 2026-05-29 (overdue 3d) — PR #5173 CI ✅ + review ✅ → land Mon or Tue.
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 (today) — biggest unstarted TP-cluster item; protect Mon/Tue. Needs a draft PR by EOW for SR Fri.
- [ ] **[PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (overdue 5d) — Diego confirmed: last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's PR is on the critical path.
### AOR Quick Wins This Week
- **[PR Check is failing on main - testWhenTab...errorPageIsShownOnce](https://app.asana.com/0/0/1213975496167929)**
overdue 40 days — CI failing test on main; investigate flake vs real regression, disable or fix.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 17 days — second CI failing task; likely related or a flake batch.
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)**
overdue 4 days — PR #4663 is up (draft); review and promote out of draft.
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
due 2026-04-24 — feature flag cleanup; quick win if the related ship is shipped.
### Sprint Backlog (pick 12 if time allows)
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (31d overdue) — Internal Product Feedback; likely AOR-touching.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (31d overdue) — Internal Product Feedback; PR #4630 (cross-domain from pinned) addresses an adjacent case — verify and either consolidate or close.
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
due 2026-05-26 (6d overdue) — 5-minute timebox; complete and close.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (125d overdue) — meta task, 5min to read & either close or schedule.
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 (257d overdue) — pixel investigation; verify still relevant before working.
(+ 2 aged items >180 days in backlog — not listed: tab preview stuck 412d, Duo login Grafana 313d.)
### On Radar
- **[Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348)** — Diego: SR completed, last Big Sur release Jun 8, Monterey+ release Jun 15. Alex's "Make Monterrey-only" PR is on this critical path — keep in sync.
- **[SIGKILL inside MainViewController chrome bar reveal animation](https://app.asana.com/0/0/1215224247451374)** — Eduardo Pinto added defensive weak captures; Sentry/crash AOR touchpoint, monitor merge.
- **[CEF: Failing tests when 'setTabTitlesEarly' is enabled](https://app.asana.com/0/0/1214378030768173)** — Kris Wright zeroing in on root cause; touches `OnDocumentTitleChanged`. Monitor; engage if it blocks Apple work.
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged missing `site_loading_performance` pixel on macOS. AOR-adjacent, monitor.
### Career Action This Week
**Picked: Draft Part 1 of Advisor Readiness doc (30 min) — task: [Readiness Self-Reflection for Potential Project Advisor - Alex M](https://app.asana.com/0/0/1210386994396212).**
Why this one (priority 1 from career-notes):
- Project Advisor is the **single most direct EP3 lever** identified in the 2026-02 review.
- Status in career-notes: "Not started" — task has been sitting since Feb.
- 1:1 prep (priority 5) is moot — Dominik OOO all week.
- Calibration follow-up with Christie (priority 3) deferred — better raised at next 1:1 once Dominik is back (week of Jun 15).
- Strategic visibility (priority 4) is partially covered by the Windows AOT comment (Strategy quadrant).
**Concrete deliverable**: 30-min block Fri afternoon — write Part 1 of the self-reflection doc (one project I'd be a strong advisor on, why, what unique perspective I bring). Don't polish; goal is to break the "not started" state before WWDC AFK.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
Ivy + Mark replied Sat to Alex's two pushback comments ("spinning off another project without discussing... I don't get how this is different"). Ivy: "your plan is the foundation for this... I plan to pick it up Mon/Tue as my next top priority." **Engage Mon/Tue** with substantive reply — silence on a scoping decision reads as acquiescence.
- **[Sorting in big HTML is 15sec compared to Vivaldi's 2 second](https://app.asana.com/0/0/1215191840665591)**
Ivy proposed a perf test using Boli's framework. Touches macOS perf AOR adjacent — **monitor**; engage if Apple team input requested.
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
Boli asked Bulcsu about isolated worlds on new native script injection APIs; CPM-related. **Monitor**; not Apple-side.
### Carried Forward from Last Week
No prior weekly review exists — nothing to carry forward formally. The closest equivalents are stale `active`-section tasks needing a status decision:
- **[Cursor integration: configure VSCode support](https://app.asana.com/0/0/1209808486380252)** — assignee: Alex
In `active` section, last modified 2026-05-06; not advanced in 3+ weeks. Decide: pick up or move to `do_later`.
- **[GH Workflow Failure - UI Tests](https://app.asana.com/0/0/1213729659282440)** — assignee: Alex
In `active` section, last modified 2026-03-20; very stale. Decide: still relevant? Close or revive.
- **[UI Tests refinement](https://app.asana.com/0/0/1210056873095697)** — assignee: Alex
In `active` section, last modified 2026-02-11; almost certainly stale. Status decision needed.
- **[Dominik :: Alex Regular 1:1 Agenda (old)](https://app.asana.com/0/0/1214339792109087)** — possibly deleted (per snapshot ⚠️); do not act until confirmed. Current active agenda task is gid 1214933759913756.
---
*Based on DB state as of 2026-06-01 02:01 UTC (sync fresh). No prior weekly review available. Saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-06-01.md`.*