Files
obsidian-vault/work/briefs/weekly/plan-2026-05-25.md
T

146 lines
10 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan — Week of 2026-06-01
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella task due Fri 2026-06-05; three PRs already in flight (#5149 approved, #5173 awaiting review, #5145 CI red); one remaining subtask ("You've got this" dialogue) due today; Ship Review opens after.
> ⚠️ **No weekly review found for 2026-05-29** — `/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md` does not exist. Plan derived from DB state + last 24h deltas + snapshot only. Restart Friday rhythm so next week's plan has a proper base.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | TP shipping window — ship review opens once "You've got this" lands |
| AOR | 15% | Light week: Warn Before Quit pixel PR (commenter pinged Fri), Monterrey-only PR review, two CI-failing tests |
| Career | 10% | Dominik AFK MonFri (LDX3 + holiday) → no 1:1; use slot for Project Advisor doc Part 1 |
| Strategy | 5% | Monitor Windows AOT delivery plan thread (open disagreement) + Big Sur drop closure |
Bumped Project to 70% because TP has a hard Friday deadline and Ship Review must open this week. Career boost is **not** triggered (no 1:1 happening) but Project Advisor doc is still owed and Dominik's absence frees the slot.
### Shape
**Mon 2026-06-01:** TP — close out queued duck.ai onboarding subtasks
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due today, in progress per Friday status
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457)
- Set 1-Must; clear weekend inbox; respond to #5145 CI failure (Ship AI onboarding winner)
**Tue 2026-06-02:** TP push + standing meetings
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987) — Brindy noted she'll attend early
- Drive review on [#5173 (Hide stop-generating button)](https://app.asana.com/0/0/1215009192158954); ping reviewers
- Merge [#5149 (Hide Free Plan title)](https://app.asana.com/0/0/1215009192158952) — already approved
**Wed 2026-06-03:** TP integration work + AOR
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364)
- [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916) — review and ship (4 days overdue, but waits on Big Sur drop closing)
- [Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — commenter Fri 5/30 explicitly asked for a PR
**Thu 2026-06-04:** Deep work day (Dominik OOO public holiday — no escalation overhead)
- Open Ship Review for [iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)
- Address remaining optionals from Friday status update
- Career: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) (30 min)
**Fri 2026-06-05:** TP deadline + weekly retro
- TP closeout: confirm Ship Review attendees, finalize artifacts
- [Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — already 3 days overdue, small follow-up from last sprint
- Write weekly review (restore the Friday rhythm)
- **Skip 1:1 prep** — no 1:1 next week (next earliest window is Tue 2026-06-09)
### Must-Not-Forget
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 (today) — Friday status said "plan to complete on Mon"; this is the last queued subtask before Ship Review can open
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
3 days overdue — PR #5145 has 🔴 CI; either fix CI or reassess; this blocks the umbrella TP
- [ ] **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — assignee: Alex
due 2026-05-29 — commenter pinged Fri 5/30 with "please prepare a PR. If you need more time, add a comment and adjust the due date." This needs a reply *or* a PR by mid-week.
- [ ] **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — assignee: Alex
due 2026-05-26 (5 days overdue) — 5 minute timebox, anonymous; just do it Monday morning
- [ ] **[PR Check is failing on main — testWhenTabWithConnectionLostErrorActivatedAndReload…](https://app.asana.com/0/0/1213975496167929)** — assignee: Alex
due 2026-04-22 (39 days overdue, "active" section) — CI failing tests on main left to rot; either fix or hand off this week
### AOR Quick Wins This Week
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
overdue 37 days — feature flag cleanup, ~30 min once the pixel removal PR is up (related work)
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
overdue 16 days — second CI failure entry; combine triage with the older one above
- **[Confirm defaultValue for popupBlocking migration](https://app.asana.com/0/0/1214004917427136)**
inbox, no due date but stale — single confirmation decision, <30 min
### Sprint Backlog (pick 12 if time allows)
- **[Bug: Tab preview stuck around - 2d](https://app.asana.com/0/0/1208347387296425)**
due 2025-04-15 — old macOS Browser Bugs ticket, paired bug with a recent feedback report; review whether still reproducing
- **[Duo login to Grafana doesn't persist through browser restart](https://app.asana.com/0/0/1210861740617086)**
due 2025-07-23 — Internal Support Inbox, low cost to validate / close
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
due 2025-09-17 — pixel anomaly investigation, may already be resolved
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 — meta task to triage your own backlog; ironically the right tool to clear the rest of this list
(+ ~5 aged items >180 days in backlog — not listed)
### On Radar
- **[macOS] Reduce real WKWebView loads during unit tests** — Sam S posted Fri "fix isn't good enough yet". Touches macOS test infra you co-own. Engage if asked.
- **Sorting in big HTML is 15sec compared to Vivaldi's 2 second** — Ivy proposed a performance test framework approach Fri. Performance work that may touch macOS browser. Monitor.
- **[macOS/iOS] Faster CI builds through compilation caching** — Diego reported WMO neutralized wall-time gains; ~38 min compute gain remains. Relevant to your Apple DevEx AOR.
- **CEF: Failing tests when 'setTabTitlesEarly' is enabled** — Kris zeroing in on root cause. Watch for a fix-and-merge ping.
- **Drop macOS 11 Big Sur Support — project closing Mon 2026-06-01** — Diego confirmed; ties into your Monterrey-only PR.
- **TD: AOR: Desktop Browsers Operational Health** — Elle flagged macOS no longer sending `site_loading_performance` pixel. Touches macOS instrumentation. Engage.
### Career Action This Week
**Picked**: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) — 30 min block on Thursday.
Skipped:
- 1:1 prep — Dominik is AFK June 15 (LDX3 trip + UK public holiday). Next 1:1 window is Tue 2026-06-09.
- Primary AOR discussion — needs 1:1 timing; deferred to 2026-06-09 agenda.
- Christie calibration ping — defer one more week; raise with Dominik on 2026-06-09.
- Assessment visibility comment — no active O-N/O-L Assessment surfaced in DB this week.
### On Radar / Participation Needed
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
You posted twice Fri 5/30 expressing concern about duplication with your existing plan (gid 1214387907502685). Ivy clarified intent; this needs a follow-up from you Mon — engage.
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
Boli asked Bulcsu what's missing to support isolated worlds. May intersect with your Windows scope concern above. Monitor.
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
Elle flagged missing macOS `site_loading_performance` pixel. This is in your wheelhouse — short comment to acknowledge / route the fix would be appropriate.
### Carried Forward from Last Week
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — Alex (DRI)
→ see TP section above
- **[PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields](https://app.asana.com/0/0/1207521936429896)** — delegated (unassigned)
Stale 75 days — no matching merged GitHub PR found. Action: ping or close this week.
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
Last 1:1 was 2026-05-26; Dominik AFK all week. Don't add new items until 2026-06-08 (next agenda window).
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — Alex
Due 2026-05-28 (3 days overdue), inbox, macOS Release Board. Small follow-up from last sprint — slot Friday.
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — Alex
No due date but related to the on-hold TP item — confirm whether NA analysis prerequisite changes the "ON HOLD" status before end of week.
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — Alex
→ also surfaced in Must-Not-Forget; complete Monday and remove from rolling list.
---
*Based on DB state as of 2026-05-31 11:09 (sync fresh). No weekly review file for 2026-05-29 — that rhythm needs restoring this Friday.*
**Notes on the inputs you provided:**
- You specified `MONDAY_DATE=2026-05-25`, but today is Sunday 2026-05-31, so the upcoming Monday is 2026-06-01. I saved the plan as `plan-2026-06-01.md` (the week the plan actually covers). If you intended a retroactive plan for the week of 2026-05-25, let me know and I'll regenerate.
- `LAST_FRIDAY_DATE=2026-05-29` matched the Friday immediately before today. The weekly review file for that date doesn't exist on disk — flagged in the plan; restoring the Friday rhythm this week would give next Monday a proper base.