Files
obsidian-vault/work/briefs/inbox/2026-04-25.md
T

36 lines
1.6 KiB
Markdown

## Inbox Triage — 2026-04-25 (since 18:28)
_Window: 18:28 +06 → now (19:00 +06). Latest sync: 2026-04-25 18:58 +06. Supersedes earlier same-day runs (17:55, 17:23, 16:44, 16:12, 15:39, 15:07, 14:35, 14:02, 13:30)._
### New / Changed — Action Required
_None._
No new task assignments, no new comments on `my_tasks`, no new comments on delegated tasks, no Ship Review / Tech Design / incident / rotation activity in this 32-minute window.
### New / Changed — Monitoring
_None._
### Nothing new
- 0 tasks modified on `my_tasks` since 18:28.
- 0 new comments on `my_tasks` or delegated tasks since 18:28.
- 0 new assignments to me.
- 0 movement on Ship Review / Tech Design / incident / rotation tasks.
- 0 new PR review activity surfaced by sync.
### Rhythms
- **1-Must (today)**: Today is Saturday — no 1-Must expected (weekend pattern). Last 1-Must (due 2026-04-24, Fri) was completed on time at 16:31 +06. No flag.
### Carry-over (still open, unchanged in this window)
- **[1212808567112832] Remove or re-evaluate Warn Before Quit pixels** — DRI · due 2026-04-24 (overdue 1d). Open PR to remove the warnBeforeQuit pixels + flag (paired with 1212444166689969), or bump due date.
- **[1213975496167929] PR Check failing on main** — OVERDUE since 2026-04-22.
- **[1214147157456480] Pre-ship-review** (Costas, due 2026-04-28) — delegated, monitor.
- **[1214167538194692] GH Workflow Failure - UI Tests** — DRI, no due date.
- **[1213798709181906] macOS AppStore UI tests** (delegated → Dominik, due 2026-04-27) — waiting on Monday progress per his last update.
Next signal will arrive on the next sync.