Files
obsidian-vault/work/briefs/inbox/2026-04-09.md
T

55 lines
3.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
I now have everything I need. Let me compile the triage.
---
## Inbox Triage — 2026-04-09 (since 17:58)
> **Snapshot basis**: Generated 2026-04-09 12:29 UTC. No new Asana activity in DB after the snapshot. All items below reflect today's changes captured in the snapshot.
---
### New / Changed — Action Required
---
**[OVERDUE] [DRI] — Remove or re-evaluate Warn Before Quit pixels**
Context: Due 2026-03-19 — **21 days overdue**. An automated Asana reminder fired this morning: *"This pixel is overdue for removal by 3 weeks, please prepare a PR. If you need more time, add a comment and adjust the due date as needed."*
Action: Prepare a PR to remove the pixel, OR add a comment explaining the delay and push the due date. Do not leave it silently past due again.
---
**[OVERDUE] [DRI] — PR Check is failing on main - testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce**
Context: Due **today (Apr 9)**. Sam assigned this to you yesterday (Apr 8) with the comment: *"Looks like a flaky test here — from the failure I'm guessing it's due to the runner having an unreliable Internet connection. Any chance you can take a look?"* No response from you yet.
Action: Investigate the test failure. If confirmed flaky/network-related, disable or fix the test and respond to Sam.
---
**[NEEDS ACTION] [DRI] — Ship-Review: [iOS] Introduce a new screen (Search or Duck.ai toggle) [2-3 days]**
Context: Due **tomorrow (Apr 10)**. Three AOR comments landed today from Gary and Alessandro:
- **GJ13** (outstanding): Search dialogs still triggering on scroll when *"You've got this!"* screen is visible. Gary: *"We're so close — just this one remaining."*
- **AB1** (Alessandro): Control-cohort bug reproduced — something incorrect in the linear flow.
- **AB2** (Alessandro): New Tab is accessible during the *"You've got this!"* dialogue — should be disabled.
GJ12, GJ14, SH1 were confirmed fixed. Alessandro has commented directly on the PR.
Action: Confirm with the implementer that GJ13, AB1, and AB2 are being addressed today. If any are blocked or unacknowledged, follow up directly — the Ship Review is due tomorrow.
---
**[NEEDS ACTION] [DELEGATOR] — macOS AppStore UI tests** *(delegated to Dominik)*
Context: Due **tomorrow (Apr 10)**. SLA was auto-breached on Apr 7; Dominik reset the timeline to Apr 610 on Apr 8. Today's only change was an automated SLA countdown tick ("2d → 1d"). No completion or progress comment from Dominik.
Action: Ping Dominik — *"Are the macOS AppStore UI tests on track for tomorrow? Anything blocking you?"*
---
### New / Changed — Monitoring
**[MONITORING] [DRI] — iOS: Demo tracker blocking after chat in onboarding** *(top_priority, due May 11)*
Context: Gary updated the date range today to Apr 14 May 11 and cross-referenced it in the "DRI <> Project Advisor async" task. No blockers raised. Start of active work pushed one week.
Action: None — monitoring. Check in after Apr 14 if no update.
---
### Rhythms
**⚠️ 1-Must — Not set today.**
Two *"What is your 1 Must today?"* tasks were completed today (07:43 and 07:55 UTC), but neither has a comment from Alex identifying the committed task. Per the ritual, the 1-Must isn't formally set without that comment. No action now, but worth noting for tomorrow's morning routine.