110 lines
7.5 KiB
Markdown
110 lines
7.5 KiB
Markdown
---
|
||
## Daily Brief — 2026-05-14
|
||
|
||
### ✨ Morning
|
||
On May 14, 1796, Edward Jenner vaccinated 8-year-old James Phipps against smallpox using cowpox — the first vaccine ever administered. Jenner coined the word "vaccine" from *vacca* (Latin: cow). The child survived. Smallpox killed ~300 million people in the 20th century alone; Jenner's rural curiosity eventually eradicated it entirely.
|
||
🧖 Sauna day — don't skip it.
|
||
💧 Start with a glass of water.
|
||
|
||
---
|
||
|
||
## Plan for Today
|
||
|
||
1. ⚡ Check [Failing pixels report for Alex M](https://app.asana.com/0/0/1214280588891026) — Samantha linked PR #4648. Verify merged; close if done. ~5 min.
|
||
2. 🔴 **SHIP REVIEW DEMO TRACKER — DUE TOMORROW (May 15).** Unhold now. Message Costas re QA (last said he'd do it May 1 — 13 days ago). Post UTI-redesign-fixes build (promised Apr 30, never posted). Resolve GJ1 animation scope with Gary.
|
||
3. 🔴 Unhold TP task — [[ON HOLD] iOS: Demo tracker blocking](https://app.asana.com/0/0/1213551050320249) — 3 days overdue. Remove hold, update due date, link Ship Review status.
|
||
4. 🟠 Reschedule Dominik 1:1 — 9 days overdue. 2-min message.
|
||
5. 🟠 Triage inbox: Text selection, Pinned tab, iPad Ship Review, NA Analysis, EP2/EP3 calibrations, DRI<>Advisor async (Gary).
|
||
6. 🟠 Batch PR reviews — after TP block.
|
||
|
||
---
|
||
|
||
### 🔴 Urgent / Overdue
|
||
|
||
**🚨 CRITICAL — DRI — [[ON HOLD] Ship Review: iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214147157456478)** · due **May 15 — TOMORROW**
|
||
- Context: On hold since Apr 30. Build posted Apr 30 (without UTI fixes). Costas never confirmed QA. GJ1 (animation thumbnail) unresolved with Gary. Pete's requirement: UTI-compatible before May 25. Deadline is **tomorrow**.
|
||
- Action: Unhold. Message Costas: "Back — did you get a chance to QA the Apr 30 build? What's still open?" Post UTI-redesign-fixes build. Ping Gary on GJ1 scope. This is today's singular mission.
|
||
|
||
**OVERDUE — DRI — [[ON HOLD] iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** · due May 11 **(3 days overdue)** · top_priority
|
||
- Context: TP task. On hold for May holidays. Ship Review deadline is tomorrow.
|
||
- Action: Remove hold. Update due date to May 15. Drive Ship Review to done.
|
||
|
||
**OVERDUE — DRI — [[ON HOLD] iOS: Introduce a new screen (toggle with Search/Duck.ai)](https://app.asana.com/0/0/1213320237636425)** · due May 15 (tomorrow) · top_priority · Staffing
|
||
- Context: Last comment Apr 14 — "PR merged, getting to internal release." Status unclear; may already be complete but task never closed.
|
||
- Action: Verify if closeable — check internal release status, close or confirm what's pending.
|
||
|
||
**OVERDUE — DRI — [PR Check failing on main - testWhenTabWithConnectionLostError...](https://app.asana.com/0/0/1213975496167929)** · due Apr 22 (22 days overdue) · active
|
||
- Context: Apple CI Failing Tests. 19 days since last touch.
|
||
- Action: Check current CI state; close if fixed, or assign investigation.
|
||
|
||
**OVERDUE — DRI — [Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214339792109087)** · due May 5 (9 days overdue)
|
||
- Action: Message Dominik to pick a new date. 2 min.
|
||
|
||
**OVERDUE — DRI — [Follow-up: restore onboarding state for duck.ai non-experiment flow](https://app.asana.com/0/0/1213992139518104)** · due Apr 27 (17 days overdue) · inbox
|
||
- Action: Triage — fold into main project or close if current iOS onboarding work covers it.
|
||
|
||
**OVERDUE — DRI — [Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)** · due May 1 (13 days overdue) · inbox
|
||
- Action: File bug, assign to appropriate engineer, or defer with new date.
|
||
|
||
**OVERDUE — DRI — [Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)** · due May 1 (13 days overdue) · inbox
|
||
- Action: File bug, assign, or defer.
|
||
|
||
> **Backlog cluster (informational):** "Bug: Tab preview stuck around" (due 2025-04-15, inbox), "Assertion Failure Pixel Anomaly" (Sep 2025, planning), "Review Overdue Tasks Summary" (Jan 2026, planning), "Duo login Grafana" (Jul 2025, inbox) — stale backlog, no action today.
|
||
|
||
---
|
||
|
||
### 🟠 Needs Action Today
|
||
|
||
**Ship Reviews (DRI)**
|
||
|
||
**[[ON HOLD] Ship Review: iOS: Demo tracker blocking](https://app.asana.com/0/0/1214147157456478)** — due **TOMORROW** — see Urgent section above. This is today's #1 mission.
|
||
|
||
**[Ship Review: (iOS Only) Ensure compatibility on iPad](https://app.asana.com/0/0/1214396826612252)** — no due date
|
||
- Arrived Apr 29, still unreviewed. Open and determine role and whether action needed.
|
||
|
||
**PR Reviews (batch)**
|
||
Review requests queued (as of Apr 29; project syncs stale Apr 30) — batch after TP block.
|
||
|
||
**Inbox — Triage**
|
||
- **[Failing pixels report for Alex M](https://app.asana.com/0/0/1214280588891026)** — ⚡ Quick win: verify PR #4648 merged, close.
|
||
- **[NA Analysis: iOS Duck.ai Onboarding Experiment](https://app.asana.com/0/0/1214126868034912)** — Alessandro asked questions Apr 28. Check if a response is needed.
|
||
- **[EP2 TD Calibration - Alex](https://app.asana.com/0/0/1214121856485500)** + **[EP3 Implementation Calibration - Alex](https://app.asana.com/0/0/1214121856485502)** — inbox. Triage your role.
|
||
- **[DRI <> Project Advisor async for Demo tracker blocking](https://app.asana.com/0/0/1213551072611261)** — Update Gary on current status (5 stacked PRs, ship review tomorrow).
|
||
- **[Follow-up: Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — inbox, macOS Release Board. Triage.
|
||
- **[macOS: Fire Window animation not played closing with cmd+w](https://app.asana.com/0/0/1213760440471324)** — inbox, macOS Release Board. Triage.
|
||
- **[[Executor] Open PRs & Queue — 2026-04-28](https://app.asana.com/0/0/1214346059379151)** — stale executor note; likely close.
|
||
|
||
---
|
||
|
||
### 🟡 Delegated — Follow Up Needed
|
||
|
||
**OVERDUE — [Pinned tab activates in other window unpinning](https://app.asana.com/0/0/1210705465887828)** · due Apr 30 · Juan Pereira · 14 days overdue
|
||
- Action: Ping Juan: "Back from holidays — what's the status on this?"
|
||
|
||
**STALE — [assertionFailure when DBP url is opened](https://app.asana.com/0/0/1212305913722018)** · due Dec 2025 · Anh Do · 5+ months stale
|
||
- Action: Ping Anh for status or close if resolved.
|
||
|
||
**STALE — [Login autofill shows empty field in macOS Browser](https://app.asana.com/0/0/1211742725064177)** · due Nov 2025 · Deepankar Bajpeyi · 6+ months stale
|
||
- Action: Message Deepankar for status. Consider closing or escalating.
|
||
|
||
**STALE — [Subfeature settings converted to&from String](https://app.asana.com/0/0/1212016050823964)** · Sabrina · last activity Jan 2026 · 4+ months stale
|
||
- Action: Ping Sabrina for status.
|
||
|
||
**STALE — [Document font usage standards](https://app.asana.com/0/0/1206389088453914)** · Stephen · last activity Apr 28 · 16 days stale
|
||
- Action: Check with Stephen on status.
|
||
|
||
---
|
||
|
||
### 🔵 Rhythms
|
||
|
||
**TP:** [[ON HOLD] iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) · due May 11 (3 days overdue) · last updated Apr 30 · ⚠️ UNHOLD TODAY — Ship Review due **tomorrow**.
|
||
|
||
**Upcoming:**
|
||
- **Ship Review deadline: May 15 (TOMORROW)** — zero margin.
|
||
- **Unified Input deadline: May 25** — all iOS onboarding work must be UTI-compatible before then.
|
||
- **WWDC'26** — Alex partially AFK Jun 8–12. Plan around it.
|
||
|
||
---
|
||
|
||
_Data: my_tasks synced 12:02 today (fresh). Project/story syncs last run Apr 30 — no new comment signals available. No tasks completed since Apr 30._
|