Files
obsidian-vault/work/briefs/daily/2026-05-01.md
T

99 lines
6.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-05-01 (Friday) — 🏖️ AFK Day 1
### ✨ Morning
On May 1, 1931, the Empire State Building officially opened in New York City — the tallest building in the world at the time, built in just 410 days with 3,400 workers on site daily. It held the record for 40 years.
🚶 Take a short walk before diving in.
---
## Plan for Today
**🏖️ AFK May 18 — enjoy the break.**
Today is the first day of Alex's holiday week. The brief is a clean handoff snapshot. No deep work expected — but two items from yesterday were not confirmed completed and are flagged below before going fully offline.
1. ⚡ Post 2-line "investigating, AFK May 18, will resume May 11" comment on testWhenTabWithConnectionLost [`gid:1213975496167929`](https://app.asana.com/0/0/1213975496167929) — 5 min, still OVERDUE +9d with zero Alex comment ever. Even a placeholder before going dark prevents a 4th weekly plan carry.
2. 🟠 Post Asana status on Text selection PR [`gid:1214071796247142`](https://app.asana.com/0/0/1214071796247142) — PR #4548 CI ✅, due TODAY. Comment "PR #4548 ready for review — going AFK May 18" takes 2 min.
3. 🟡 On return (May 11): full Ship Review resumption — Zac/Gary/Costas/Pete feedback queued.
---
### 🔴 Urgent / Overdue
**[OVERDUE +9d] [DRI]** — PR Check failing on main: testWhenTabWithConnectionLost… [`gid:1213975496167929`](https://app.asana.com/0/0/1213975496167929)
Context: Due Apr 22. Sam S asked Apr 8 (flaky runner suspected). Five automated reminders since. **Alex has never commented.** Carried through 4 weekly plans. AFK without any acknowledgment = worst outcome.
Action: 2 lines to Sam S before going offline: "Investigating — flaky runner suspected. AFK May 18, will RCA on return May 11."
**[OVERDUE +4d] [DRI]** — Follow-up: restore onboarding state for duck.ai non-experiment flow [`gid:1213992139518104`](https://app.asana.com/0/0/1213992139518104)
Context: Due Apr 27, still open in inbox. No comments, no status. Was "close-out or move to planning" per weekly plan.
Action: On return — complete the task if shipped, or move to planning with May 11+ date.
**[OVERDUE TODAY] [DRI]** — Text selection in address bar [`gid:1214071796247142`](https://app.asana.com/0/0/1214071796247142) — due TODAY
Context: PR #4548 CI ✅ (confirmed yesterday). Zero Asana updates. Alessandro assigned Apr 16 after original reporter went OOO.
Action: Post Asana status comment "PR #4548 up and CI green — AFK May 18, will follow up May 11." 2 min.
**[BACKLOG CLUSTER]** — `do_later`/`quick_wins` with stale dates: warnBeforeQuit feature flag (Apr 24), Warn Before Quit pixels (Apr 30), page reload JS wrapping (Apr 22), Phase out Singletons (2023). Realistically deferred to post-AFK.
---
### 🟠 Needs Action Today
**Ship Review — ON HOLD (new signal from Pete)**
[MONITORING] [DRI] — Ship Review: iOS: Demo tracker blocking after chat in onboarding [`gid:1214147157456478`](https://app.asana.com/0/0/1214147157456478) — ON HOLD until May 11
Context: ON HOLD as agreed with Alessandro. Ship Review is now properly paused. Latest Dax build bot posted new alpha at 19:45 (Apr 30) — automated, no action.
**New signal**: Pete clarified (Apr 30 ~19:15, after snapshot): "This could ship right now without breaking unified input (still internal), but you'll need to ensure compatibility with unified input before May 25 ship date." — No action today; file this as context for May 11 resumption.
Monitoring note: On return, check Zac (address bar padding clipping, dialog-reopening issue), Gary (GJ1 thumbnail animation, GJ2 X-button removal), Costas (QA pass promised), Pete (unified input compatibility deadline May 25).
**PR Review Inbox**
6 review requests still queued (carried from yesterday):
- Enable ad blocking feature availability — soft launch [privacy-configuration]
- Bump prettier-plugin-multiline-arrays 4.0.3→4.1.7 [privacy-configuration]
- [macOS] Improve value transformer failure observability [apple-browsers]
- [macOS] Avoid force unwrap crash in debugDescription [apple-browsers]
- Fix maestro tests [apple-browsers]
- attributed_metric_data_store_error definition fix [apple-browsers]
Action: On return May 11 — batch triage. Two config-only ones (multiline-arrays, iPad toggle) are trivial approvals.
---
### 🟡 Delegated — Follow Up Needed
[OVERDUE 5.5mo] — Login autofill shows empty field [`gid:1211742725064177`](https://app.asana.com/0/0/1211742725064177) → Deepankar
Context: Due 2025-11-17. Last activity Dec 8, 2025. Decision deferred to post-AFK — ping or close on May 11.
[OVERDUE 4.5mo] — assertionFailure when DBP url is opened [`gid:1212305913722018`](https://app.asana.com/0/0/1212305913722018) → Anh Do
Context: Due 2025-12-12. Last activity Dec 12, 2025. Same — ping or close May 11.
[MONITORING] — Pinned tab activates in other window [`gid:1210705465887828`](https://app.asana.com/0/0/1210705465887828) → Juan Pereira — due Apr 30 (yesterday)
Context: No completion recorded. Check on return; if still open, re-evaluate assignment.
(GitHub Delegated PR Correlation: no merged-but-not-closed Asana tasks.)
---
### 🔵 Rhythms
**TP**: [[ON HOLD] iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) `gid:1213551050320249` — due May 11. Last modified Apr 30. ON HOLD. Alessandro reviews stacked PRs from Monday May 4. **Not close to completion → no Next TP Thread action needed.**
**AFK**: Alex M AFK May 18 [`gid:1212694796293417`](https://app.asana.com/0/0/1212694796293417) — starts today. Task still open in DB.
**Upcoming on return (May 11)**:
- Ship Review resumption — full reviewer round (Zac, Gary, Costas, Pete unified-input note)
- Text selection address bar — confirm PR #4548 review status
- testWhenTabWithConnectionLost — reproduce + RCA
- 6 PR review requests queued
- O-L Weekly Meeting: May 4 (Alex OOO) — monitor async
- Apple Weekly Team Meeting: May 5 (Alex OOO) — Brindy updated timing
- O-N Weekly Meeting: May 5 (Alex OOO)
- Dominik :: Alex 1:1 Agenda: due May 5 — both AFK, will slip to May 11 week
- macOS Weekly Maintenance DRI: May 22 — 3 weeks out, low urgency
---
*Brief generated 2026-05-01 from `asana_context.md` snapshot 14:06 UTC (Apr 30) + live DB queries. No new human signals on Alex's tasks since the Apr 30 snapshot. AFK handoff state captured.*