99 lines
6.3 KiB
Markdown
99 lines
6.3 KiB
Markdown
---
|
||
## Daily Brief — 2026-05-01 (Friday) — 🏖️ AFK Day 1
|
||
|
||
### ✨ Morning
|
||
|
||
On May 1, 1931, the Empire State Building officially opened in New York City — the tallest building in the world at the time, built in just 410 days with 3,400 workers on site daily. It held the record for 40 years.
|
||
|
||
🚶 Take a short walk before diving in.
|
||
|
||
---
|
||
|
||
## Plan for Today
|
||
|
||
**🏖️ AFK May 1–8 — enjoy the break.**
|
||
|
||
Today is the first day of Alex's holiday week. The brief is a clean handoff snapshot. No deep work expected — but two items from yesterday were not confirmed completed and are flagged below before going fully offline.
|
||
|
||
1. ⚡ Post 2-line "investigating, AFK May 1–8, will resume May 11" comment on testWhenTabWithConnectionLost [`gid:1213975496167929`](https://app.asana.com/0/0/1213975496167929) — 5 min, still OVERDUE +9d with zero Alex comment ever. Even a placeholder before going dark prevents a 4th weekly plan carry.
|
||
2. 🟠 Post Asana status on Text selection PR [`gid:1214071796247142`](https://app.asana.com/0/0/1214071796247142) — PR #4548 CI ✅, due TODAY. Comment "PR #4548 ready for review — going AFK May 1–8" takes 2 min.
|
||
3. 🟡 On return (May 11): full Ship Review resumption — Zac/Gary/Costas/Pete feedback queued.
|
||
|
||
---
|
||
|
||
### 🔴 Urgent / Overdue
|
||
|
||
**[OVERDUE +9d] [DRI]** — PR Check failing on main: testWhenTabWithConnectionLost… [`gid:1213975496167929`](https://app.asana.com/0/0/1213975496167929)
|
||
Context: Due Apr 22. Sam S asked Apr 8 (flaky runner suspected). Five automated reminders since. **Alex has never commented.** Carried through 4 weekly plans. AFK without any acknowledgment = worst outcome.
|
||
Action: 2 lines to Sam S before going offline: "Investigating — flaky runner suspected. AFK May 1–8, will RCA on return May 11."
|
||
|
||
**[OVERDUE +4d] [DRI]** — Follow-up: restore onboarding state for duck.ai non-experiment flow [`gid:1213992139518104`](https://app.asana.com/0/0/1213992139518104)
|
||
Context: Due Apr 27, still open in inbox. No comments, no status. Was "close-out or move to planning" per weekly plan.
|
||
Action: On return — complete the task if shipped, or move to planning with May 11+ date.
|
||
|
||
**[OVERDUE TODAY] [DRI]** — Text selection in address bar [`gid:1214071796247142`](https://app.asana.com/0/0/1214071796247142) — due TODAY
|
||
Context: PR #4548 CI ✅ (confirmed yesterday). Zero Asana updates. Alessandro assigned Apr 16 after original reporter went OOO.
|
||
Action: Post Asana status comment "PR #4548 up and CI green — AFK May 1–8, will follow up May 11." 2 min.
|
||
|
||
**[BACKLOG CLUSTER]** — `do_later`/`quick_wins` with stale dates: warnBeforeQuit feature flag (Apr 24), Warn Before Quit pixels (Apr 30), page reload JS wrapping (Apr 22), Phase out Singletons (2023). Realistically deferred to post-AFK.
|
||
|
||
---
|
||
|
||
### 🟠 Needs Action Today
|
||
|
||
**Ship Review — ON HOLD (new signal from Pete)**
|
||
|
||
[MONITORING] [DRI] — Ship Review: iOS: Demo tracker blocking after chat in onboarding [`gid:1214147157456478`](https://app.asana.com/0/0/1214147157456478) — ON HOLD until May 11
|
||
Context: ON HOLD as agreed with Alessandro. Ship Review is now properly paused. Latest Dax build bot posted new alpha at 19:45 (Apr 30) — automated, no action.
|
||
**New signal**: Pete clarified (Apr 30 ~19:15, after snapshot): "This could ship right now without breaking unified input (still internal), but you'll need to ensure compatibility with unified input before May 25 ship date." — No action today; file this as context for May 11 resumption.
|
||
Monitoring note: On return, check Zac (address bar padding clipping, dialog-reopening issue), Gary (GJ1 thumbnail animation, GJ2 X-button removal), Costas (QA pass promised), Pete (unified input compatibility deadline May 25).
|
||
|
||
**PR Review Inbox**
|
||
|
||
6 review requests still queued (carried from yesterday):
|
||
- Enable ad blocking feature availability — soft launch [privacy-configuration]
|
||
- Bump prettier-plugin-multiline-arrays 4.0.3→4.1.7 [privacy-configuration]
|
||
- [macOS] Improve value transformer failure observability [apple-browsers]
|
||
- [macOS] Avoid force unwrap crash in debugDescription [apple-browsers]
|
||
- Fix maestro tests [apple-browsers]
|
||
- attributed_metric_data_store_error definition fix [apple-browsers]
|
||
|
||
Action: On return May 11 — batch triage. Two config-only ones (multiline-arrays, iPad toggle) are trivial approvals.
|
||
|
||
---
|
||
|
||
### 🟡 Delegated — Follow Up Needed
|
||
|
||
[OVERDUE 5.5mo] — Login autofill shows empty field [`gid:1211742725064177`](https://app.asana.com/0/0/1211742725064177) → Deepankar
|
||
Context: Due 2025-11-17. Last activity Dec 8, 2025. Decision deferred to post-AFK — ping or close on May 11.
|
||
|
||
[OVERDUE 4.5mo] — assertionFailure when DBP url is opened [`gid:1212305913722018`](https://app.asana.com/0/0/1212305913722018) → Anh Do
|
||
Context: Due 2025-12-12. Last activity Dec 12, 2025. Same — ping or close May 11.
|
||
|
||
[MONITORING] — Pinned tab activates in other window [`gid:1210705465887828`](https://app.asana.com/0/0/1210705465887828) → Juan Pereira — due Apr 30 (yesterday)
|
||
Context: No completion recorded. Check on return; if still open, re-evaluate assignment.
|
||
|
||
(GitHub Delegated PR Correlation: no merged-but-not-closed Asana tasks.)
|
||
|
||
---
|
||
|
||
### 🔵 Rhythms
|
||
|
||
**TP**: [[ON HOLD] iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249) `gid:1213551050320249` — due May 11. Last modified Apr 30. ON HOLD. Alessandro reviews stacked PRs from Monday May 4. **Not close to completion → no Next TP Thread action needed.**
|
||
|
||
**AFK**: Alex M AFK May 1–8 [`gid:1212694796293417`](https://app.asana.com/0/0/1212694796293417) — starts today. Task still open in DB.
|
||
|
||
**Upcoming on return (May 11)**:
|
||
- Ship Review resumption — full reviewer round (Zac, Gary, Costas, Pete unified-input note)
|
||
- Text selection address bar — confirm PR #4548 review status
|
||
- testWhenTabWithConnectionLost — reproduce + RCA
|
||
- 6 PR review requests queued
|
||
- O-L Weekly Meeting: May 4 (Alex OOO) — monitor async
|
||
- Apple Weekly Team Meeting: May 5 (Alex OOO) — Brindy updated timing
|
||
- O-N Weekly Meeting: May 5 (Alex OOO)
|
||
- Dominik :: Alex 1:1 Agenda: due May 5 — both AFK, will slip to May 11 week
|
||
- macOS Weekly Maintenance DRI: May 22 — 3 weeks out, low urgency
|
||
|
||
---
|
||
*Brief generated 2026-05-01 from `asana_context.md` snapshot 14:06 UTC (Apr 30) + live DB queries. No new human signals on Alex's tasks since the Apr 30 snapshot. AFK handoff state captured.*
|