Files
obsidian-vault/work/briefs/daily/2026-04-26.md
T

82 lines
5.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-04-26
**Today's focus per weekly plan**: Sunday — no shape defined; weekend rest day. New signals since yesterday: 3 task changes (1 was the daily "1 Must" task auto-completing, 1 was an automated reminder comment on a do_later pixel, 1 was Dominik posting healthy progress on a delegated task). Zero new comments requiring an Alex response. **State is materially unchanged from Saturday.** Same diagnosis applies: hold for Monday morning.
---
### 🔴 Urgent / Overdue
**1. [OVERDUE +4d] [DRI] — PR Check: testWhenTabWithConnectionLost…**
`gid:1213975496167929` · Apple CI Failing Tests · due Apr 22 · `active`
Context: Same item carried from Saturday's brief. Last activity was the 4th automated overdue reminder on Apr 25 04:19. No human touched it. This is the longest-running unanswered ping in the queue (~3 weeks since Sam S's original Apr 8 ask) and it has now sat through an entire weekly plan. It cannot survive another Monday untouched.
Action: **Don't act today.** Pre-stage the Monday-morning response in your head: (a) attempt repro → if flaky, apply label + 2-line ping to Sam S; (b) if not flaky, drop a "still investigating, ETA Wed" holding reply. First action when you sit down Monday — before email, before Slack.
> **Backlog cluster** (informational, not urgent):
> - `gid:1214136461142650` Rollback DEBUG install dir — due Apr 24, `active`. PR #4510 is up with green CI, waiting for review. Alex isn't the blocker — reviewer is. **Push the Asana due date Monday** to reflect "in review", not OVERDUE.
> - `gid:1214146824281003` Project Update Reminder — due Apr 24, `inbox`. This is the recurring automated nag for a project status update; address as part of Monday triage.
> - do_later/quick_wins stale dates remain expected; no action.
---
### 🟠 Needs Action Today
**None.** It's Sunday. Nothing on the radar requires a same-day human response.
**Tomorrow lineup (Monday Apr 27) — no action today, just visibility:**
- O-L Weekly Meeting (Samantha MC). She asked for discussion topics last week — drop one Monday morning if anything from this week needs surfacing.
- `gid:1213992139518104` Follow-up: restore onboarding state for duck.ai non-experiment flow — **due Mon Apr 27**, no comments yet. Triage: scope it Monday and either schedule, push, or close.
- `gid:1214157855537862` 1:1 agenda task is due Tue Apr 28 — drop items into it as they surface Monday (Project Advisor progress, EP3 reviewer onboarding, AFK May 18, AOR target).
- The PR Check testWhen action above.
**Optional Sunday slot (low pressure):**
`gid:1210386994396212` Readiness Self-Reflection for Potential Project Advisor — same item that sat as optional yesterday. Tuesday 1:1 with Dominik = Monday is the real prep deadline. Doing 30 min today buys runway. Skip without guilt.
---
### 🟡 Delegated — Follow Up Needed
**None today.** Pinging delegated owners on a Sunday is bad form.
Stale-but-wait-until-Monday:
- `gid:1212305913722018` Anh Do · assertionFailure when DBP url opened (4mo overdue) — Monday ping.
- `gid:1211742725064177` Deepankar · Login autofill empty field (5mo overdue) — Monday ping.
Healthy / no follow-up needed:
- `gid:1213798709181906` macOS AppStore UI tests · Dominik · due tomorrow Apr 27. Dominik posted Apr 25: *"I have tests running locally but I'll need a bit more time to put it on CI. Hopefully I'll be able to wrap it up on Monday."* Active, on-track. Watch tomorrow; no nudge needed.
- `gid:1214147157456480` Pre-ship-review · Costas · due Tue Apr 28. Owned and tracking.
> **GitHub Delegated PR Correlation**: C-S-S text selection PR `gid:1207521936429896` → still no GitHub match (40d stale, +1d vs yesterday). No close-the-loop action available.
---
### ✨ Morning
On this day in 1803, around 3,000 meteorite fragments rained on the village of L'Aigle, France. Until then, mainstream Western science had largely dismissed peasant reports of "stones falling from the sky" as folklore. Jean-Baptiste Biot's investigation of L'Aigle became the first scientifically accepted proof that meteorites come from space — the founding event of an entire field. A sky full of evidence, taken seriously only once it landed in a French village.
🚶 Take a short walk before diving in.
---
### 🔵 Rhythms
**TP**: iOS: Demo tracker blocking after chat in onboarding `gid:1213551050320249` — last changed Apr 24 21:44 (2 days ago). Alex's last status: implementation mostly done, blinking Dax logo bug to fix Monday, then open Ship Review. Pre-ship-review `gid:1214147157456480` (Costas, due Apr 28) and Localization `gid:1214147157456477` (due Apr 28) are open. Due May 11. ✅ Not stale, on track.
**Next TP Thread**: TP not yet at "Waiting for Release" threshold (blinking-logo bug pending). Defer.
**Standing meetings today**: None (Sunday).
**Upcoming this week:**
- **Mon Apr 27**: O-L Weekly Meeting · Follow-up restore onboarding `gid:1213992139518104` due · macOS AppStore UI tests `gid:1213798709181906` due (Dominik) · TP blinking Dax logo fix targeted by Alex
- **Tue Apr 28**: Apple Weekly + O-N Weekly + **1:1 with Dominik** (heavy meeting day) · 1:1 agenda `gid:1214157855537862` due · Pre-ship-review `gid:1214147157456480` due (Costas) · Localization `gid:1214147157456477` due
- **Fri May 1 (5 days)**: **AFK starts** `gid:1212694796293417` (May 18). Five working days remain — TP Ship Review needs to land before this.
---
## Priority Order for Today
0. ✨ Morning ritual — 🚶 take a short walk before diving in.
1. 🛌 Rest. It's Sunday. Nothing on the radar requires a same-day human response.
2. ⬇️ (Optional, mental pre-staging only) Decide the Monday-morning move on PR Check testWhen `gid:1213975496167929` — repro attempt vs. flaky-label vs. ETA-reply. Don't post anything today.
3. ⬇️ (Optional, only if motivated) Draft Part 1 of Advisor Readiness `gid:1210386994396212` — 30 min would clear the runway for Tuesday's 1:1. Skip without guilt.