Files
obsidian-vault/work/briefs/daily/2026-04-24.md
T

130 lines
8.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
## Daily Brief — 2026-04-24
**Today's focus per weekly plan**: Friday = **Weekly review** + close open PR Check loop + stale TP assessment + iOS Toggle notes update. New signals since yesterday: 4 tasks completed (Ashby, Crash PR, Geolocation, 1-Must), 1 new comment (automated "past-due" bot on Text selection), **2 priority-1 items from yesterday still untouched**.
### 🔴 Urgent / Overdue
**1. [OVERDUE +2d, 16d from original ping] [DRI] — PR Check: testWhenTabWithConnectionLost…**
`gid:1213975496167929` · Apple CI Failing Tests · due Apr 22
Context: Third automated overdue reminder fired Apr 22 22:14. Zero human activity since. Carried through yesterday's brief as Priority #3 with no progress. Per weekly plan this is **Friday's CI-closure item** — it has now outlived two weekly plans.
Action: Today is non-negotiable. Either reproduce + post root-cause, OR apply flaky label + notify Sam S. Even a 2-line "still investigating, ETA Monday" is better than a fourth reminder.
**2. [OVERDUE +2d] [DRI] — Text selection in the address bar doesn't work as standard**
`gid:1214071796247142` · Internal Product Feedback · due Apr 22
Context: **New framing**: PR #4548 ("Fix Opt+Shift+Left/Right word-by-word selection contraction in address bar") is in flight and CI 🔴. So Alex is *not* silent in GitHub, but the Asana task still has zero status update for Alessandro. That's what's straining the OOO-coverage expectation.
Action: (a) Fix CI on #4548. (b) Post status comment on Asana task linking to the PR — "in review, CI stabilizing" — so Alessandro sees motion. ~3 min for the comment alone.
> **Backlog cluster** (informational, not urgent): Pinned tab opens link `gid:1214038885921128` (overdue Apr 17) + do_later/quick_wins with stale dates — expected; no action today.
---
### 🟠 Needs Action Today
**Friday Anchor — Weekly Review (per weekly plan)**
Draft weekly review covering: TP kick-off complete (Tue), Geolocation CI fire cleared ✅, Crash/NSException PR merged ✅, Ashby admin closed ✅, DEBUG rollback proposal posted, open loops (Text selection CI, PR Check testWhen…), and the 3 red-CI PRs (#4548, #4544, #4541).
---
**Due Today — Quick Admin**
`gid:1214146824281003` Project Update Reminder · Due today · inbox
Role: DRI. ~5 min — post a project status update (likely on the TP).
`gid:1214136461142650` Proposal: Rollback `/Applications/DEBUG` install dir · Due today · active
Role: DRI / Author. PR #4510 CI ✅ but still waiting on Diego's review. Action: ping Diego directly on GitHub (or in Slack) to close this out today, and note it in weekly review.
---
**TP — Day 3 investigation**
`gid:1213551050320249` iOS: Demo tracker blocking after chat in onboarding · Due May 11
Role: DRI. **New signal**: PR #4544 is open and CI 🔴. Alessandro's chunking guidance (Apr 22) still needs an acknowledgment.
Action: (a) Fix CI on #4544. (b) If not yet done: reply to Alessandro on async thread `gid:1213551072611261` — 2 min cheap trust-building, carried from yesterday.
---
**Weekly-plan housekeeping (Friday items)**
- `gid:1213320237636425` iOS Toggle Screen tracking task — update notes to reflect Week 910 data collection (Apr 20May 1). Quick edit.
- `gid:1214040804696193` Follow-up: Inline Text Images to TypingTextAnimation — set a due date or schedule next sprint (per weekly plan).
- `gid:1213472659952301` FE <> iOS Sync — **not visible in current snapshot** (may have moved out of top_priority section); verify in Asana and close/move if stalled.
---
**AOR — Red-CI triage (if time after the above)**
3 of Alex's open PRs are CI 🔴: #4548 (text selection), #4544 (TP), #4541 (pinned tabs after force-kill). #4541 hasn't surfaced before — check what broke.
---
**PR Review carry-overs (de-prioritized — past their window)**
- `gid:1214121879880035` Tom Strba's combinedPermissionView PR — Wed/Thu window passed. If not reviewed today, proactively Slack Tom: "Got pulled — can land Monday, or happy to hand off."
- GitHub review batch (10 review-requested): C-S-S 14.0.0, force-unwrap debugDescription, crashCollectionDisableKeysSorting, value transformer, Promo Queue — slide to next week unless weekly review finishes early.
---
**Career (carried 2 days — now at risk of sliding the week)**
`gid:1210386994396212` Readiness Self-Reflection for Potential Project Advisor
Role: Author. **Weekly plan says**: "at latest Friday before weekly review." Today is that deadline. Protect a 30-min slot or it rolls to next week.
---
**Monitoring (no action)**
- `gid:1213798709181906` macOS AppStore UI tests → Dominik, due **today**. Delegated. Check at EOD if status changed.
- `gid:1214147157456480` Pre-ship-review → Costas — modified Apr 23 23:35 (late-night activity). Due Apr 28. Monitor only.
- PR #4510 / #4483 / #4482 / #4530 all CI ✅ waiting on reviewers. Alex not the blocker (except on #4510 per Diego ping above).
- O-L Weekly Meeting Mon Apr 27: Samantha is MC, requested discussion topics — add anything from this week before end of day.
---
### 🟡 Delegated — Follow Up Needed
**1. [OVERDUE +4 months] → Anh Do — assertionFailure when DBP url is opened**
`gid:1212305913722018` · due 2025-12-12. Carried from yesterday.
Action: Ping today (2 min): *"Hey — any update on this, or should we close/archive?"*
**2. [OVERDUE +5 months] → Deepankar — Login autofill shows empty field in macOS Browser**
`gid:1211742725064177` · due 2025-11-17. Carried from yesterday.
Action: Ping for status; if no near-term ETA, propose closing.
> **GitHub Delegated PR Correlation**: C-S-S text selection PR `gid:1207521936429896` → still no GitHub match (38d stale). No close-the-loop action.
---
### ✨ Morning
On this day in 1990, NASA launched the Hubble Space Telescope aboard Space Shuttle *Discovery*. It immediately produced blurry images because the main mirror was ground to the wrong curvature by about 1/50th the width of a human hair. Three years later, astronauts did a 5-spacewalk orbital service mission and essentially installed Hubble's "glasses" — turning it into one of the most productive scientific instruments in history. A very cosmic reminder that "patching in production" sometimes works out.
🌿 Step outside for 5 minutes before opening Slack.
---
### 🔵 Rhythms
**TP**: iOS: Demo tracker blocking after chat in onboarding `gid:1213551050320249` — last changed Apr 23 22:43, PR #4544 open (CI 🔴). Due May 11. ✅ Not stale. Day 3 today.
**Next TP Thread**: TP is mid-investigation, not close to completion. No next-TP thread action needed.
**Standing meetings today**: None. Clear calendar for weekly review + CI fixes.
**Upcoming:**
- **Mon Apr 27**: O-L Weekly Meeting (Samantha MC). Add discussion topics today if any.
- **Tue Apr 28**: Apple Weekly Team Meeting + O-N Weekly Meeting (back-to-back).
- **Mon Apr 28** (dated): Dominik :: Alex Regular 1:1 Agenda `gid:1214157855537862` — drop items as they surface.
- **Fri May 1 (7 days)**: **AFK starts** `gid:1212694796293417`. Today is a good day to identify handoff candidates in the weekly review: #4482, #4483, #4510, #4530 all CI ✅ waiting on reviewers — worth nudging before AFK.
---
## Priority Order for Today
0. ✨ Morning ritual — 🌿 step outside for 5 minutes before opening Slack.
1. 🔴 PR Check testWhenTabWithConnectionLost `gid:1213975496167929` — post *something* human today (fix, label, or ETA). 3rd reminder is a line.
2. 🔴 Text selection `gid:1214071796247142` — post status comment linking PR #4548 to unblock Alessandro's expectation, then fix PR CI.
3. 🟠 Weekly Review — draft + publish (Friday anchor).
4. 🟠 Project Update Reminder `gid:1214146824281003` — due today, ~5 min.
5. 🟠 DEBUG Rollback `gid:1214136461142650` — ping Diego on PR #4510 review; close today.
6. 🟠 TP Day 3 — (a) reply to Alessandro on async thread (2 min), (b) fix CI on #4544.
7. 🟠 iOS Toggle Screen tracking `gid:1213320237636425` — update notes (Week 9-10 data collection).
8. 🟠 Inline Text Images follow-up `gid:1214040804696193` — set due date / schedule.
9. ⬇️ Career: Draft Part 1 Advisor Readiness `gid:1210386994396212`**last slot before sliding the week**.
10. ⬇️ Tom Strba PR `gid:1214121879880035` — review OR proactively Slack re: Monday slip.
11. ⬇️ Ping Anh Do + Deepankar — 2 min each.
12. ⬇️ CI 🔴 on PR #4541 (pinned tabs) — look only if the above clears.