104 lines
6.9 KiB
Markdown
104 lines
6.9 KiB
Markdown
I have everything I need. Here's the daily brief:
|
||
|
||
---
|
||
## Daily Brief — 2026-04-20
|
||
|
||
### 🔴 Urgent / Overdue
|
||
|
||
**1. OVERDUE +11d | DRI — PR Check failing on main (testWhenTabWithConnectionLost...)**
|
||
`gid:1213975496167929` · Apple CI Failing Tests
|
||
Context: Sam S assigned Apr 8, asked Alex to investigate suspected flaky test from unreliable CI runner. Two automated overdue reminders have fired. Zero response.
|
||
Action: Reproduce test failure today; if confirmed flaky → mark as flaky and notify Sam S with findings. If reproducible → post root cause + fix ETA.
|
||
|
||
**2. OVERDUE +5d | DRI — PR Check failing on main (CSS 14.0.0 integration crash)**
|
||
`gid:1214067738586364` · Apple CI Failing Tests
|
||
Context: Alessandro tagged Alex on Apr 15 for fatal navigation error in integration tests after CSS 14.0.0 merge ("Fatal error: The test is causing a real navigation action"). No reply in 5 days. Note: `[iOS/macOS] Bump C-S-S to 14.0.0` is also in the GitHub review queue — the two are likely connected.
|
||
Action: Investigate integration test crash; reply to Alessandro with findings or ETA before EOD.
|
||
|
||
**3. DUE TODAY | DRI — [macOS] GeolocationProviderTests async tests flakiness**
|
||
`gid:1213996660793764` · Apple CI Failing Tests
|
||
Context: Assigned to Alex, due today. No activity since Apr 12 assignment.
|
||
Action: Triage before EOD — reproduce failure, investigate root cause, or escalate with a status comment.
|
||
|
||
**4. OVERDUE +3d | DRI — Pinned tab opens link in background tab**
|
||
`gid:1214038885921128` · Internal Product Feedback
|
||
Context: Alessandro offered to re-assign if capacity is tight. No action during QWD week.
|
||
Action: Decide today — quick fix this week or reply to Alessandro requesting re-assign.
|
||
|
||
> **Backlog cluster** (informational — not ranked above active items): Bug: Tab preview stuck around (inbox, 1yr overdue) · Duo login to Grafana (inbox, 9mo overdue) · Assertion Failure Pixel Anomaly (planning, 7mo overdue) · Review Overdue Tasks Summary (planning, 83d overdue) — scheduled for Friday triage per weekly plan.
|
||
|
||
---
|
||
|
||
### 🟠 Needs Action Today
|
||
|
||
**O-L Weekly Meeting** — today · Role: Attendee
|
||
Stephen added "Apple and Windows Functional Meetup recap?" as a discussion topic.
|
||
Action: Prepare 1–2 sentence update on Apple meetup highlights before the call.
|
||
|
||
**Inbox Triage** (today's planned focus — all new since last week)
|
||
- **Ashby Hiring Team Member Setup** `gid:1214121856485510` — assigned Apr 19, due Apr 23. Admin action required on your end; don't let it sit past tomorrow.
|
||
- **Proposal: rollback/Applications/DEBUG install path** `gid:1213733523353466` — modified Apr 19. Read and route: approve, reject, or schedule a discussion slot.
|
||
- **QWD: Agentic macOS UI tests virtualization** `gid:1214075310050341` — overdue 3d, QWD window has passed. Post a status comment and either carry forward to next sprint slot or close.
|
||
- **EP3/EP2 calibration tasks** `gid:1214121856485502`, `gid:1214121856485500` — check whether Christie has assigned any submissions. No action until she does; just verify.
|
||
|
||
**Set this week's 1-Must** (Monday ritual)
|
||
Candidates: GeolocationProviderTests triage (due today) or one of the two overdue CI tasks. Pick the one you can fully close today.
|
||
|
||
**1:1 Prep — for tomorrow (Dominik back from meetup)**
|
||
Tomorrow is a triple-header: 1:1 + O-N kick-off + Apple Weekly (4AM ET). Today is the only prep window.
|
||
Action: Draft 1:1 agenda on `gid:1210011918660755`: Project Advisor readiness (30-min doc before/after 1:1), primary AOR target discussion, EP3 reviewer role update (Christie), AFK May 1–8 plan.
|
||
|
||
**PR Review Queue — schedule Wed/Thu**
|
||
8 review-requested PRs in GitHub + Tom Strba's direct ask (`gid:1214121879880035`, "Remove combinedPermissionView feature flag") — "you have the best context." No action today; allocate Wednesday per weekly plan.
|
||
|
||
---
|
||
|
||
### 🟡 Delegated — Follow Up Needed
|
||
|
||
**1. OVERDUE +4 months | Delegated → Anh Do — assertionFailure when DBP url is opened**
|
||
`gid:1212305913722018` · Personal Information Removal Native Platforms
|
||
Due: 2025-12-12. Last modified: Dec 12, 2025. Four-plus months of silence.
|
||
Action: Ping Anh Do: *"Hey — any update on the assertionFailure when DBP URL is opened? Still actively in your queue or should we close/archive this?"*
|
||
|
||
**2. OVERDUE +5 months | Delegated → Deepankar — Login autofill shows empty field in macOS Browser**
|
||
`gid:1211742725064177` · Autofill bugs
|
||
Due: 2025-11-17. Last modified: Dec 2025.
|
||
Action: Ping Deepankar for status. If no near-term ETA, propose closing or moving to backlog.
|
||
|
||
> No delegated PR correlation actions: the one matched delegated PR task (`gid:1207521936429896`) has no GitHub match — not merged, no "close Asana task" action needed.
|
||
|
||
---
|
||
|
||
### ✨ Morning
|
||
|
||
On this date in 1902, Marie and Pierre Curie first isolated radium chloride after years of exhausting work processing tons of pitchblende — the element was so intensely radioactive it glowed blue in the dark, and Marie reportedly kept a small jar of it on her bedside table as a nightlight.
|
||
|
||
💧 Start with a glass of water.
|
||
|
||
---
|
||
|
||
### 🔵 Rhythms
|
||
|
||
**TP**: iOS: Demo tracker blocking after chat in onboarding `gid:1213551050320249` — last changed Apr 17 (3 days ago). ✅ Not stale. Due May 11. **Kick-off is tomorrow** at O-N Weekly Meeting — the thread was opened Apr 14. Next TP Thread: TP is in kick-off phase, not close to completion — no next-TP thread action needed yet.
|
||
|
||
**Upcoming this week:**
|
||
- **Tomorrow (Apr 21) — heavy day**: 1:1 with Dominik + O-N TP kick-off + Apple Weekly Team Meeting (4AM ET). Prep window is today. Kick-off task `gid:1213551072611251` due tomorrow — post notes/next steps after the meeting.
|
||
- **Wed Apr 22**: Text selection in address bar `gid:1214071796247142` DUE. Investigate + post status or fix before EOD.
|
||
- **Thu Apr 23**: Ashby Hiring Setup `gid:1214121856485510` DUE.
|
||
- **May 1–8 AFK** (11 days away): identify in-flight items needing handoff or completion before Apr 30.
|
||
|
||
---
|
||
|
||
## Priority Order for Today
|
||
|
||
0. ✨ Morning ritual — 💧 Start with a glass of water.
|
||
1. 🔴 Investigate PR Check — testWhenTabWithConnectionLost `gid:1213975496167929` — 11d overdue, Sam S waiting. Reproduce + mark flaky or post status.
|
||
2. 🔴 Investigate PR Check — CSS 14.0.0 integration crash `gid:1214067738586364` — 5d overdue, Alessandro waiting. Reply with findings or ETA.
|
||
3. 🔴 Triage GeolocationProviderTests `gid:1213996660793764` — due today. Investigate or escalate with a comment.
|
||
4. 🟠 O-L Weekly Meeting prep — 1–2 sentence Apple meetup recap (call is today).
|
||
5. 🟠 Set this week's 1-Must.
|
||
6. 🟠 Inbox triage — Ashby setup (action needed) · rollback proposal (route) · QWD wrap-up (close/update) · EP calibration (check for new items).
|
||
7. 🟠 Draft 1:1 agenda for tomorrow — EP3 Advisor doc, AOR primary target, AFK May 1–8.
|
||
8. 🟡 Ping Anh Do on assertionFailure DBP `gid:1212305913722018` — 4+ months overdue.
|
||
9. ⬇️ Pinned tab opens in background `gid:1214038885921128` — triage: quick fix or re-assign (fill a gap).
|