Files
obsidian-vault/work/briefs/daily/2026-04-09.md
T

129 lines
7.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
I now have all the data needed. Let me compile the brief.
---
## Daily Brief — 2026-04-09 (Thursday)
_No weekly plan file found (plan-2026-04-06.md absent) — brief derived from DB state + yesterday's carry-forwards._
_Context snapshot stale (generated 01:17 UTC, >7h ago) — structural queries re-run from DB._
### Step 0 — Anchor
**Today's focus (inferred):** Ship Review closure for iOS toggle / Duck.ai screen — due **tomorrow Apr 10** — is the week's critical gate. All issues were resolved before Alex went sick; closing summary still needs to be posted to collect explicit approvals.
**New signals since yesterday:** 6 task changes · 4 new comments (2 well-wishes on AFK task; Costas conditional LGTM + Barbara cb3 clearance on Ship Review).
**Yesterday carry-forwards:** Ship Review closing summary not posted (sick) · PR #4355 not reviewed (sick) · CI flaky test open (due today).
---
### 🔴 Urgent / Overdue
**[OVERDUE +2d] [DRI] — Dominik :: Alex Regular 1:1 Agenda** `inbox · due Apr 7`
Context: 1:1 took place Apr 7 (Dominik commented "Get better soon" Apr 8 — confirms Alex was already past it). Task still open.
Action: **Mark complete** in Asana. ~10 seconds.
**[OVERDUE +2d] [REVIEWER] — Design Review: Blinking Address Bar** `inbox · macOS Release Board · due Apr 7`
Context: No stories or notes on record — scope entirely unknown. Has been sitting since Apr 6.
Action: Open task, determine what's expected (formal feedback vs. lightweight sign-off), complete or post a comment with your assessment.
**[OVERDUE +1d] [REVIEWER] — PR: iOS Pixel Definition implementation** `inbox · macOS Release Board · due Apr 8`
Context: Alex is the assigned reviewer. Slipped yesterday due to sick day. PR has been open >1d past due. Same codebase as the Ship Review.
Action: **Review PR today** — approve or request changes.
**[OVERDUE +1d] [DRI] — SH1/ double dialog for "That's DuckDuckGo Search"** `inbox · macOS Release Board · due Apr 8`
Context: Alex opened a separate fix PR on Apr 7 ("race condition, not a regression"). Costas confirmed Apr 8 in Ship Review thread: "looking correct now." Fix PR not yet confirmed merged; task not completed.
Action: Verify fix PR has been reviewed and merged → mark this task complete.
**[OVERDUE +1d] [DRI] — What is your 1 Must today?** `inbox · due Apr 8`
Context: Daily ritual not set — missed while sick yesterday.
Action: **Set today's 1-Must** (Ship Review closing summary is the natural candidate).
---
**Backlog cluster** _(not urgent — informational only):_
- *Bug: Tab preview stuck around* — 359d overdue (inbox) → move to `do_later` or close
- *Duo login to Grafana doesn't persist* — 260d overdue (inbox) → `do_later`
- *Assertion Failure Pixel Anomaly (Sep 2025)* — 204d overdue (planning)
- *Review Overdue Tasks Summary (Jan 2026)* — 72d overdue (planning) — meta-task itself overdue
---
### 🟠 Needs Action Today
#### Ship Reviews (DRI)
**[NEEDS ACTION] [DRI] — Ship-Review: [iOS] Toggle screen / Duck.ai default state** `Ship Reviews · due Apr 10 TOMORROW`
| Issue | Status |
|---|---|
| GJ12 | ✅ Barbara merged; confirmed in build |
| GJ13 | ✅ Alex fixed (Apr 7 build) |
| GJ14 | ✅ Alex fixed (Apr 7 build) |
| GJ15 | ✅ Gary: "Fixed 👍" |
| SH1 (double dialog) | ✅ Fix PR opened Apr 7; Costas Apr 8: "looking correct now" |
| cb3 (Related Searches) | ✅ Barbara Apr 8: "displaying correctly" · Costas: "don't hold things up" |
**State:** All known issues resolved. Costas gave a conditional LGTM Apr 8. **Gary has not given explicit approval since his Apr 7 question** ("Any updates on GJ13, GJ14, SH1?") — Alex answered Apr 7 21:52, but Gary has not confirmed. No closing summary posted.
Per ship-review-playbook: silence ≠ approval. Explicit sign-off from each AOR owner required before shipping.
Action: **Post closing summary today** — list all resolved issues, state "all addressed," @-mention Costas and Gary requesting explicit "Approved" sign-off before Apr 10. This must go out today to allow time for responses.
---
#### CI / Flaky Test
**[NEEDS ACTION] [DRI] — PR Check failing on main: ErrorPageTests** `inbox · Apple CI Failing Tests · due TODAY`
Context: Sam S Apr 8 02:00: *"Looks like a flaky test — from the failure I'm guessing it's due to the runner having an unreliable Internet connection. Any chance you can take a look?"* Test: `IntegrationTests/Tab/ErrorPageTests.swift#L275 · testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce` · Failure: Timeout.
Action: **Confirm network-flake diagnosis; apply fix** per CI/Flaky Test playbook. Sam S is waiting.
---
### 🟡 Delegated — Follow Up Needed
**[OVERDUE +6d] — Calibration: EP2/3 reviews for Apple engineers** → Christie `due Apr 3 · last activity Apr 2`
Context: No activity in 7 days. Deadline has passed with no status update.
Action: Follow up with Christie — *"Hey, just checking in on the EP2/3 calibration — any update or blockers on your end?"*
**[STALE, due TOMORROW Apr 10] — Pinned tab activates in other window unpinning** → Juan Pereira `due Apr 10 · last modified Mar 30 (10 days stale)`
Context: Active delegated task due tomorrow; no activity in 10 days.
Action: Check in with Juan today — *"Just confirming you're on track for the pinned tab fix by tomorrow?"*
Active — no action needed:
- macOS AppStore UI tests → Dominik (due Apr 10, active — modified Apr 8) ✓
- macOS Address bar bugs batch (no due date, modified Apr 7) ✓
---
### 🔵 Rhythms
**TP:** iOS: Introduce a new screen (toggle / Duck.ai default state) — due May 15 · last modified Apr 6 ✓ not stale
- Ship Review gate closes **tomorrow Apr 10** — critical path
- Next project (**iOS: Demo tracker blocking**, due Apr 21) gated on Ship Review completion + postmortem — Gary confirmed Apr 2
No active rotation.
**Upcoming this week:**
- 🔴 Ship Review sign-off: **tomorrow Apr 10** — must get Costas + Gary approvals today
- macOS AppStore UI tests (Dominik): **tomorrow Apr 10** — active, monitoring
- Performance Feedback Survey (amartemyanov): **Apr 14** — no prep needed yet
- Next 1:1 with Dominik: **~Apr 14 (Tue)** — start building agenda items
---
## Priority Order for Today
_Baseline: Ship Review closure is the critical gate for this week's TP and the next project. Alex returns from sick day — items 14 are the core of the day; 59 are fast wins or light follow-ups._
| # | Action | Why now |
|---|---|---|
| **1** | **Set today's 1-Must** (Ship Review closing summary) | Daily ritual; sets the day's anchor |
| **2** | **Post Ship Review closing summary → request Costas + Gary explicit approvals** | Due tomorrow; must allow response time today |
| **3** | **Review PR: iOS Pixel Definition** | +1d overdue; same feature as Ship Review |
| **4** | **Investigate CI flaky test — ErrorPageTests timeout** | Due today; Sam S waiting |
| **5** | **SH1 double dialog — verify fix PR merged, mark task complete** | +1d overdue; 5-min housekeeping once confirmed |
| **6** | **Design Review: Blinking Address Bar** | +2d overdue; triage scope first |
| **7** | **Mark 1:1 Agenda complete** | +2d overdue; 10 seconds |
| **8** | **Follow up with Christie re: EP2/3 Calibration** | 6 days past due; one-line ping |
| **9** | **Check in with Juan Pereira re: Pinned tab** | Due tomorrow, 10 days no activity |
_Items 59 are all <5 min each. The only item that materially moves the week forward is #2 — everything else is unblocked once the Ship Review summary goes out._