129 lines
7.4 KiB
Markdown
129 lines
7.4 KiB
Markdown
I now have all the data needed. Let me compile the brief.
|
||
|
||
---
|
||
|
||
## Daily Brief — 2026-04-09 (Thursday)
|
||
|
||
_No weekly plan file found (plan-2026-04-06.md absent) — brief derived from DB state + yesterday's carry-forwards._
|
||
_Context snapshot stale (generated 01:17 UTC, >7h ago) — structural queries re-run from DB._
|
||
|
||
### Step 0 — Anchor
|
||
|
||
**Today's focus (inferred):** Ship Review closure for iOS toggle / Duck.ai screen — due **tomorrow Apr 10** — is the week's critical gate. All issues were resolved before Alex went sick; closing summary still needs to be posted to collect explicit approvals.
|
||
**New signals since yesterday:** 6 task changes · 4 new comments (2 well-wishes on AFK task; Costas conditional LGTM + Barbara cb3 clearance on Ship Review).
|
||
**Yesterday carry-forwards:** Ship Review closing summary not posted (sick) · PR #4355 not reviewed (sick) · CI flaky test open (due today).
|
||
|
||
---
|
||
|
||
### 🔴 Urgent / Overdue
|
||
|
||
**[OVERDUE +2d] [DRI] — Dominik :: Alex Regular 1:1 Agenda** `inbox · due Apr 7`
|
||
Context: 1:1 took place Apr 7 (Dominik commented "Get better soon" Apr 8 — confirms Alex was already past it). Task still open.
|
||
Action: **Mark complete** in Asana. ~10 seconds.
|
||
|
||
**[OVERDUE +2d] [REVIEWER] — Design Review: Blinking Address Bar** `inbox · macOS Release Board · due Apr 7`
|
||
Context: No stories or notes on record — scope entirely unknown. Has been sitting since Apr 6.
|
||
Action: Open task, determine what's expected (formal feedback vs. lightweight sign-off), complete or post a comment with your assessment.
|
||
|
||
**[OVERDUE +1d] [REVIEWER] — PR: iOS Pixel Definition implementation** `inbox · macOS Release Board · due Apr 8`
|
||
Context: Alex is the assigned reviewer. Slipped yesterday due to sick day. PR has been open >1d past due. Same codebase as the Ship Review.
|
||
Action: **Review PR today** — approve or request changes.
|
||
|
||
**[OVERDUE +1d] [DRI] — SH1/ double dialog for "That's DuckDuckGo Search"** `inbox · macOS Release Board · due Apr 8`
|
||
Context: Alex opened a separate fix PR on Apr 7 ("race condition, not a regression"). Costas confirmed Apr 8 in Ship Review thread: "looking correct now." Fix PR not yet confirmed merged; task not completed.
|
||
Action: Verify fix PR has been reviewed and merged → mark this task complete.
|
||
|
||
**[OVERDUE +1d] [DRI] — What is your 1 Must today?** `inbox · due Apr 8`
|
||
Context: Daily ritual not set — missed while sick yesterday.
|
||
Action: **Set today's 1-Must** (Ship Review closing summary is the natural candidate).
|
||
|
||
---
|
||
**Backlog cluster** _(not urgent — informational only):_
|
||
- *Bug: Tab preview stuck around* — 359d overdue (inbox) → move to `do_later` or close
|
||
- *Duo login to Grafana doesn't persist* — 260d overdue (inbox) → `do_later`
|
||
- *Assertion Failure Pixel Anomaly (Sep 2025)* — 204d overdue (planning)
|
||
- *Review Overdue Tasks Summary (Jan 2026)* — 72d overdue (planning) — meta-task itself overdue
|
||
|
||
---
|
||
|
||
### 🟠 Needs Action Today
|
||
|
||
#### Ship Reviews (DRI)
|
||
|
||
**[NEEDS ACTION] [DRI] — Ship-Review: [iOS] Toggle screen / Duck.ai default state** `Ship Reviews · due Apr 10 TOMORROW`
|
||
|
||
| Issue | Status |
|
||
|---|---|
|
||
| GJ12 | ✅ Barbara merged; confirmed in build |
|
||
| GJ13 | ✅ Alex fixed (Apr 7 build) |
|
||
| GJ14 | ✅ Alex fixed (Apr 7 build) |
|
||
| GJ15 | ✅ Gary: "Fixed 👍" |
|
||
| SH1 (double dialog) | ✅ Fix PR opened Apr 7; Costas Apr 8: "looking correct now" |
|
||
| cb3 (Related Searches) | ✅ Barbara Apr 8: "displaying correctly" · Costas: "don't hold things up" |
|
||
|
||
**State:** All known issues resolved. Costas gave a conditional LGTM Apr 8. **Gary has not given explicit approval since his Apr 7 question** ("Any updates on GJ13, GJ14, SH1?") — Alex answered Apr 7 21:52, but Gary has not confirmed. No closing summary posted.
|
||
|
||
Per ship-review-playbook: silence ≠ approval. Explicit sign-off from each AOR owner required before shipping.
|
||
|
||
Action: **Post closing summary today** — list all resolved issues, state "all addressed," @-mention Costas and Gary requesting explicit "Approved" sign-off before Apr 10. This must go out today to allow time for responses.
|
||
|
||
---
|
||
|
||
#### CI / Flaky Test
|
||
|
||
**[NEEDS ACTION] [DRI] — PR Check failing on main: ErrorPageTests** `inbox · Apple CI Failing Tests · due TODAY`
|
||
Context: Sam S Apr 8 02:00: *"Looks like a flaky test — from the failure I'm guessing it's due to the runner having an unreliable Internet connection. Any chance you can take a look?"* Test: `IntegrationTests/Tab/ErrorPageTests.swift#L275 · testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce` · Failure: Timeout.
|
||
Action: **Confirm network-flake diagnosis; apply fix** per CI/Flaky Test playbook. Sam S is waiting.
|
||
|
||
---
|
||
|
||
### 🟡 Delegated — Follow Up Needed
|
||
|
||
**[OVERDUE +6d] — Calibration: EP2/3 reviews for Apple engineers** → Christie `due Apr 3 · last activity Apr 2`
|
||
Context: No activity in 7 days. Deadline has passed with no status update.
|
||
Action: Follow up with Christie — *"Hey, just checking in on the EP2/3 calibration — any update or blockers on your end?"*
|
||
|
||
**[STALE, due TOMORROW Apr 10] — Pinned tab activates in other window unpinning** → Juan Pereira `due Apr 10 · last modified Mar 30 (10 days stale)`
|
||
Context: Active delegated task due tomorrow; no activity in 10 days.
|
||
Action: Check in with Juan today — *"Just confirming you're on track for the pinned tab fix by tomorrow?"*
|
||
|
||
Active — no action needed:
|
||
- macOS AppStore UI tests → Dominik (due Apr 10, active — modified Apr 8) ✓
|
||
- macOS Address bar bugs batch (no due date, modified Apr 7) ✓
|
||
|
||
---
|
||
|
||
### 🔵 Rhythms
|
||
|
||
**TP:** iOS: Introduce a new screen (toggle / Duck.ai default state) — due May 15 · last modified Apr 6 ✓ not stale
|
||
- Ship Review gate closes **tomorrow Apr 10** — critical path
|
||
- Next project (**iOS: Demo tracker blocking**, due Apr 21) gated on Ship Review completion + postmortem — Gary confirmed Apr 2
|
||
|
||
No active rotation.
|
||
|
||
**Upcoming this week:**
|
||
- 🔴 Ship Review sign-off: **tomorrow Apr 10** — must get Costas + Gary approvals today
|
||
- macOS AppStore UI tests (Dominik): **tomorrow Apr 10** — active, monitoring
|
||
- Performance Feedback Survey (amartemyanov): **Apr 14** — no prep needed yet
|
||
- Next 1:1 with Dominik: **~Apr 14 (Tue)** — start building agenda items
|
||
|
||
---
|
||
|
||
## Priority Order for Today
|
||
|
||
_Baseline: Ship Review closure is the critical gate for this week's TP and the next project. Alex returns from sick day — items 1–4 are the core of the day; 5–9 are fast wins or light follow-ups._
|
||
|
||
| # | Action | Why now |
|
||
|---|---|---|
|
||
| **1** | **Set today's 1-Must** (Ship Review closing summary) | Daily ritual; sets the day's anchor |
|
||
| **2** | **Post Ship Review closing summary → request Costas + Gary explicit approvals** | Due tomorrow; must allow response time today |
|
||
| **3** | **Review PR: iOS Pixel Definition** | +1d overdue; same feature as Ship Review |
|
||
| **4** | **Investigate CI flaky test — ErrorPageTests timeout** | Due today; Sam S waiting |
|
||
| **5** | **SH1 double dialog — verify fix PR merged, mark task complete** | +1d overdue; 5-min housekeeping once confirmed |
|
||
| **6** | **Design Review: Blinking Address Bar** | +2d overdue; triage scope first |
|
||
| **7** | **Mark 1:1 Agenda complete** | +2d overdue; 10 seconds |
|
||
| **8** | **Follow up with Christie re: EP2/3 Calibration** | 6 days past due; one-line ping |
|
||
| **9** | **Check in with Juan Pereira re: Pinned tab** | Due tomorrow, 10 days no activity |
|
||
|
||
_Items 5–9 are all <5 min each. The only item that materially moves the week forward is #2 — everything else is unblocked once the Ship Review summary goes out._
|