7.4 KiB
I now have all the data needed. Let me compile the brief.
Daily Brief — 2026-04-09 (Thursday)
No weekly plan file found (plan-2026-04-06.md absent) — brief derived from DB state + yesterday's carry-forwards. Context snapshot stale (generated 01:17 UTC, >7h ago) — structural queries re-run from DB.
Step 0 — Anchor
Today's focus (inferred): Ship Review closure for iOS toggle / Duck.ai screen — due tomorrow Apr 10 — is the week's critical gate. All issues were resolved before Alex went sick; closing summary still needs to be posted to collect explicit approvals. New signals since yesterday: 6 task changes · 4 new comments (2 well-wishes on AFK task; Costas conditional LGTM + Barbara cb3 clearance on Ship Review). Yesterday carry-forwards: Ship Review closing summary not posted (sick) · PR #4355 not reviewed (sick) · CI flaky test open (due today).
🔴 Urgent / Overdue
[OVERDUE +2d] [DRI] — Dominik :: Alex Regular 1:1 Agenda inbox · due Apr 7
Context: 1:1 took place Apr 7 (Dominik commented "Get better soon" Apr 8 — confirms Alex was already past it). Task still open.
Action: Mark complete in Asana. ~10 seconds.
[OVERDUE +2d] [REVIEWER] — Design Review: Blinking Address Bar inbox · macOS Release Board · due Apr 7
Context: No stories or notes on record — scope entirely unknown. Has been sitting since Apr 6.
Action: Open task, determine what's expected (formal feedback vs. lightweight sign-off), complete or post a comment with your assessment.
[OVERDUE +1d] [REVIEWER] — PR: iOS Pixel Definition implementation inbox · macOS Release Board · due Apr 8
Context: Alex is the assigned reviewer. Slipped yesterday due to sick day. PR has been open >1d past due. Same codebase as the Ship Review.
Action: Review PR today — approve or request changes.
[OVERDUE +1d] [DRI] — SH1/ double dialog for "That's DuckDuckGo Search" inbox · macOS Release Board · due Apr 8
Context: Alex opened a separate fix PR on Apr 7 ("race condition, not a regression"). Costas confirmed Apr 8 in Ship Review thread: "looking correct now." Fix PR not yet confirmed merged; task not completed.
Action: Verify fix PR has been reviewed and merged → mark this task complete.
[OVERDUE +1d] [DRI] — What is your 1 Must today? inbox · due Apr 8
Context: Daily ritual not set — missed while sick yesterday.
Action: Set today's 1-Must (Ship Review closing summary is the natural candidate).
Backlog cluster (not urgent — informational only):
- Bug: Tab preview stuck around — 359d overdue (inbox) → move to
do_lateror close - Duo login to Grafana doesn't persist — 260d overdue (inbox) →
do_later - Assertion Failure Pixel Anomaly (Sep 2025) — 204d overdue (planning)
- Review Overdue Tasks Summary (Jan 2026) — 72d overdue (planning) — meta-task itself overdue
🟠 Needs Action Today
Ship Reviews (DRI)
[NEEDS ACTION] [DRI] — Ship-Review: [iOS] Toggle screen / Duck.ai default state Ship Reviews · due Apr 10 TOMORROW
| Issue | Status |
|---|---|
| GJ12 | ✅ Barbara merged; confirmed in build |
| GJ13 | ✅ Alex fixed (Apr 7 build) |
| GJ14 | ✅ Alex fixed (Apr 7 build) |
| GJ15 | ✅ Gary: "Fixed 👍" |
| SH1 (double dialog) | ✅ Fix PR opened Apr 7; Costas Apr 8: "looking correct now" |
| cb3 (Related Searches) | ✅ Barbara Apr 8: "displaying correctly" · Costas: "don't hold things up" |
State: All known issues resolved. Costas gave a conditional LGTM Apr 8. Gary has not given explicit approval since his Apr 7 question ("Any updates on GJ13, GJ14, SH1?") — Alex answered Apr 7 21:52, but Gary has not confirmed. No closing summary posted.
Per ship-review-playbook: silence ≠ approval. Explicit sign-off from each AOR owner required before shipping.
Action: Post closing summary today — list all resolved issues, state "all addressed," @-mention Costas and Gary requesting explicit "Approved" sign-off before Apr 10. This must go out today to allow time for responses.
CI / Flaky Test
[NEEDS ACTION] [DRI] — PR Check failing on main: ErrorPageTests inbox · Apple CI Failing Tests · due TODAY
Context: Sam S Apr 8 02:00: "Looks like a flaky test — from the failure I'm guessing it's due to the runner having an unreliable Internet connection. Any chance you can take a look?" Test: IntegrationTests/Tab/ErrorPageTests.swift#L275 · testWhenTabWithConnectionLostErrorActivatedAndReloadFailsAgain_errorPageIsShownOnce · Failure: Timeout.
Action: Confirm network-flake diagnosis; apply fix per CI/Flaky Test playbook. Sam S is waiting.
🟡 Delegated — Follow Up Needed
[OVERDUE +6d] — Calibration: EP2/3 reviews for Apple engineers → Christie due Apr 3 · last activity Apr 2
Context: No activity in 7 days. Deadline has passed with no status update.
Action: Follow up with Christie — "Hey, just checking in on the EP2/3 calibration — any update or blockers on your end?"
[STALE, due TOMORROW Apr 10] — Pinned tab activates in other window unpinning → Juan Pereira due Apr 10 · last modified Mar 30 (10 days stale)
Context: Active delegated task due tomorrow; no activity in 10 days.
Action: Check in with Juan today — "Just confirming you're on track for the pinned tab fix by tomorrow?"
Active — no action needed:
- macOS AppStore UI tests → Dominik (due Apr 10, active — modified Apr 8) ✓
- macOS Address bar bugs batch (no due date, modified Apr 7) ✓
🔵 Rhythms
TP: iOS: Introduce a new screen (toggle / Duck.ai default state) — due May 15 · last modified Apr 6 ✓ not stale
- Ship Review gate closes tomorrow Apr 10 — critical path
- Next project (iOS: Demo tracker blocking, due Apr 21) gated on Ship Review completion + postmortem — Gary confirmed Apr 2
No active rotation.
Upcoming this week:
- 🔴 Ship Review sign-off: tomorrow Apr 10 — must get Costas + Gary approvals today
- macOS AppStore UI tests (Dominik): tomorrow Apr 10 — active, monitoring
- Performance Feedback Survey (amartemyanov): Apr 14 — no prep needed yet
- Next 1:1 with Dominik: ~Apr 14 (Tue) — start building agenda items
Priority Order for Today
Baseline: Ship Review closure is the critical gate for this week's TP and the next project. Alex returns from sick day — items 1–4 are the core of the day; 5–9 are fast wins or light follow-ups.
| # | Action | Why now |
|---|---|---|
| 1 | Set today's 1-Must (Ship Review closing summary) | Daily ritual; sets the day's anchor |
| 2 | Post Ship Review closing summary → request Costas + Gary explicit approvals | Due tomorrow; must allow response time today |
| 3 | Review PR: iOS Pixel Definition | +1d overdue; same feature as Ship Review |
| 4 | Investigate CI flaky test — ErrorPageTests timeout | Due today; Sam S waiting |
| 5 | SH1 double dialog — verify fix PR merged, mark task complete | +1d overdue; 5-min housekeeping once confirmed |
| 6 | Design Review: Blinking Address Bar | +2d overdue; triage scope first |
| 7 | Mark 1:1 Agenda complete | +2d overdue; 10 seconds |
| 8 | Follow up with Christie re: EP2/3 Calibration | 6 days past due; one-line ping |
| 9 | Check in with Juan Pereira re: Pinned tab | Due tomorrow, 10 days no activity |
Items 5–9 are all <5 min each. The only item that materially moves the week forward is #2 — everything else is unblocked once the Ship Review summary goes out.