Files
obsidian-vault/work/briefs/weekly/plan-2026-05-25.md
T
Alexey Martemyanov 8a4663f1b2 [2026-05-30] inbox sort: processed 16 notes from family/sort/
New files:
- personal/ideas/life-product-ideas.md (feedback-идеи)

Merged into existing files:
- family/documents/kids-songs.md — added Barto poems list
- family/contacts/service-providers.md — added Айдар + Сергей contacts
- family/documents/recipes-wishlist.md — added настойки section

Deleted (already in vault):
- 10 keep-import files (altai-shopping, altai-house-inventory, car-notes,
  gift-ideas, books-reading-list already had the content)
- кофр-размер, лизе-на-день-рождения, лыжи-размеры, настойки-рецепты
2026-05-30 12:54:20 +06:00

138 lines
9.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Weekly Plan — Week of 2026-05-25
> Generated Sat 2026-05-30. The MonFri (2529) work window is already past; this plan is forward-looking to the upcoming workweek (Jun 15) which carries the active Ship Review through to close-out. No prior weekly-review file exists at `briefs/weekly/2026-05-29.md` — content built directly from the Asana snapshot.
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — DRI on parent project due Fri 2026-06-05; three sub-PRs already up, "Persist 'You've got this' dialogue" lands Mon, then open Ship Review.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | Close-out week for iOS onboarding project: finish Persist dialogue, open Ship Review, address optionals. |
| AOR | 15% | Light — Monterrey-only PR awaiting merge; PR review requests + iOS mentions need triage. |
| Career | 10% | No 1:1 this week (last was 2026-05-26, next ~2026-06-09). Use the gap to draft Project Advisor Readiness Part 1. |
| Strategy | 5% | One substantive comment on an active O-N/O-L Assessment if one is open. |
### Shape
**Mon Jun 1:** TP close-out + standing meeting
- [Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950) — finish PR, ship before EOD (per Alex's May/29 status: "In progress, plan to complete on Mon Next")
- [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) — PR #5149 already approved, merge
- O-L Weekly Meeting
**Tue Jun 2:** Ship Review opening + Apple Weekly
- [Ship Review: iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1215009192158961) — open it, fill required sections, request reviewers
- Apple Weekly Team Meeting
- Triage GitHub mentions/review requests (Brindy thread on subscription sheet NTP flash, filterAddressBarUpdates removal)
**Wed Jun 3:** Optionals start + O-N Weekly
- [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) — optional from Ship Review scope (1d)
- O-N Weekly Meeting
- Career Action time-box: Project Advisor Readiness doc Part 1 (30 min)
**Thu Jun 4:** Optionals continue
- [Address Bar Toggle Selection: Animated Assets](https://app.asana.com/0/0/1214627423981798) — due today, 2-3d effort, deprioritise if Ship Review reviewer feedback comes in
**Fri Jun 5:** Close loops + weekly review
- Land remaining Ship Review feedback; mark TP complete or carry to next week
- Write weekly review
- AFK prep: WWDC partly-AFK window starts Mon Jun 8 — flag in-flight items now
### Must-Not-Forget
- [ ] **[Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 — DRI; last in-progress subtask before Ship Review can open. Alex publicly committed to Monday completion.
- [ ] **[Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
due 2026-05-29 (1d overdue) — PR #5173 up, CI green, awaiting reviewer. Ping if no movement by Tue.
- [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (3d overdue) — separate from the onboarding project; needs Alex to merge or hand off.
- [ ] **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — assignee: Alex
due 2026-05-28 (2d overdue) — macOS Release Board follow-up; small but blocking Ship Review polish.
- [ ] **[Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
due 2026-05-21 (9d overdue) — gates the [ON HOLD] subtask gid 1213551050320249. Check status with Jake mid-week; do not let it slip past 2026-06-05.
### AOR Quick Wins This Week
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
overdue 36 days — flag removal, modified yesterday so still live; clear in a Wed/Thu gap.
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
overdue 1 day — pixel cleanup paired with the feature-flag removal above; do them together.
- **[Consider removing or reworking mac_malicious-site-protection_client-timeout](https://app.asana.com/0/0/1210855358441832)**
overdue 311 days — quick_wins section; aged but small. Tag for a Quick Wins block.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check is failing on main — testWhenTabWithConnectionLostErrorActivated...](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 (38d overdue) — active section; CI flakiness in main, blocking team.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
due 2026-05-15 (15d overdue) — second flaky-test entry; pair with above.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (29d overdue) — internal product feedback, macOS bug.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (29d overdue) — internal product feedback, macOS bug.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (123d overdue) — meta cleanup task; 30-min triage to close or split.
(+ ~3 aged items >180 days in backlog — not listed individually.)
### On Radar
- **GH mention: [iOS][Tailored Onboarding] Present Final dialog for Duck.ai flow** — sibling work to the TP project; monitor for design changes that affect Persist dialogue.
- **GH mention: Fix subscription sheet NTP flash and activate keyboard for chat-path try-visit dialog** — touches the "Try Visiting a Site" optional; engage if author asks for review.
- **GH mention: [iOS] Remove filterAddressBarUpdates feature flag** — Alex AOR adjacent (feature flags); quick review if requested.
- **GH review requested: Bump nativeStorage rollout to 100%** — privacy-configuration repo; check this is the expected rollout step.
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — 4d overdue, 5-min timebox. Knock out Mon.
### Career Action This Week
**Draft Part 1 of Project Advisor Readiness doc (30 min, scheduled Wed Jun 3).**
Why this and not the others:
- Project Advisor (#1 priority in career-notes.md) is still status="Not started" — single biggest EP3 signal gap.
- No 1:1 this week → can't pick "1:1 prep" or "add primary AOR target to agenda" items.
- Existing scaffold task: [Readiness Self-Reflection for Potential Project Advisor - Alex M](https://app.asana.com/0/0/1210386994396212) — open it, fill Part 1.
- Christie EP2/3 calibration confirmation deferred to the 2026-06-09 1:1 with Dominik.
### Carried Forward from Last Week
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
→ see TP section above.
- **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (2d overdue) — subtask of TP; status per Alex's May/29 comment unclear ("PR up for [hide stop-chat], in progress for [Persist]"). Verify whether this rolls into the Ship Review or needs its own close-out.
- **[ON HOLD] [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** — assignee: Alex
due 2026-06-05 — explicitly on hold pending Privacy Triage (gid 1214965405681675, Jake Abel). Don't unblock until Privacy Triage closes.
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — assignee: Alex
no due date — related to the demo tracker work; revisit once the ON HOLD subtask unblocks.
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
no due date — async doc; touch only if Privacy Triage closes mid-week.
- **[Postmortem: Security Triage AI: edit link](https://app.asana.com/0/0/1214996544314187)** — assignee: Alex
no due date — small follow-up from completed postmortem (1214996544314182 closed 2026-05-28). Close out in a Quick Wins block.
- **[Xcode build speedup skill](https://app.asana.com/0/0/1214996544314193)** — assignee: Alex
no due date — meta/tooling task carried over. Park unless surfaced.
### DRI Conflicts / Snapshot Caveats
- Snapshot generated 2026-05-30 06:19 UTC; sync state shows two project streams "never" synced (project:2524544613455, project:11984721910118) — verify those aren't currently-relevant projects.
- DB query for Dominik OOO not run (envdir unavailable on this host). Snapshot shows no Dominik AFK entries in surfaced tasks, but this is not exhaustive. Assume Dominik available unless a future sync surfaces otherwise.
- **AFK reminder**: [Alex M Partly AFK Jun/8-12 (WWDC'26)](https://app.asana.com/0/0/1212684797790491) starts the Monday after this plan ends. Hand off any in-flight Ship Review work before EOD Fri Jun 5.
---
*Based on Asana snapshot 2026-05-30 06:19 UTC. No prior weekly-review file at briefs/weekly/2026-05-29.md; build assumes current DB state.*
Plan saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md`.