Files

5.8 KiB


Daily Brief — 2026-06-04

Morning

On June 4, 1896, at 2 AM, Henry Ford took his first car — the "Quadricycle" — for a spin through the empty streets of Detroit. To get it out of his workshop, he had to knock down a brick wall with an axe. The whole drive lasted 30 minutes. 🧖 Sauna day — don't skip it. 💧 Start with a glass of water.

Plan for Today

  1. Desktop Browser Feature Owner Survey — 5-min anonymous survey, 9d overdue — just knock it out
  2. 🔴 Merge PR #5149 (Hide Free plan) — CI review , ready to land
  3. 🔴 Fix CI on PR #5246 (Try Visiting a Site Background) — Ship Review gated on this, due Jun 8
  4. Reply to Costas on Treatment B — he relaxed deadline to Jun 29; acknowledge + note updated plan
  5. iOS Address onboarding — main TP block (continue from Wed implementation)
  6. Career block (90 min): Draft Part 1 of Project Advisor Readiness self-reflection
  7. Start WWDC handoff brief draft — due tomorrow
  8. Review queue: Drop macOS 11 Big Sur + 5 other PRs (batch after TP)
  9. Check if PR Check on main (Sam's fix) landed — or escalate

🔴 Urgent / Overdue

[OVERDUE 9d] Desktop Browser Feature Owner Survey (1214940335721015) — due May 26 Context: Anonymous, 5-minute timebox. Has been sitting since Monday — nothing blocks it. Action: Fill out the survey now.

[OVERDUE] Hide Free plan • Upgrade in onboarding (1215009192158952) — due May 28, PR #5149 CI review Context: Landing blocker already cleared. Just needs merge and close. Action: Merge PR #5149; complete the task.

[OVERDUE] Try Visiting a Site: Background (1214828145455342) — due Jun 3, PR #5246 CI 🔴 Context: PR up for iOS onboarding background dialog. CI failure is the only blocker before Ship Review (due Jun 8) can launch. Action: Fix CI on PR #5246 today.

[OVERDUE 20d] PR Check is failing on main (1214797526093576) — due May 15 Context: Sam S had a fix PR succeeding overnight as of May/31. No snapshot update since May/17 — unknown if it landed. Action: Verify Sam's PR merged. If not, follow up directly.

Backlog cluster (stale-dated inbox/planning items — not individually urgent):

  • Bug: Tab preview stuck (Apr 2025)
  • Duo login to Grafana doesn't persist (Jul 2025)
  • Assertion Failure Pixel Anomaly (Sep 2025)
  • Pinned tab opens link in background (May 1)
  • Text selection in address bar (May 1)
  • Follow-up: Inline Text Images / TypingTextAnimation (May 28, PR #4663 draft exists)

🟠 Needs Action Today

Ship Review (DRI) — iOS Address onboarding conflicts (1215009192158961) — due Jun 8 Created yesterday. AOR sign-off subtasks need to be opened. Prerequisite: PR #5246 CI must pass first. Action: Once CI is green — set up Ship Review subtasks and ping AOR contacts.

Reply to Costas — Treatment B deadline (1215009192158955) Costas commented Jun 3: "Jun 29 is the actual hard deadline — not June 15." Alex's prior comment set June 15 as the target. Costas confirmed June 29 is fine once experiment wraps. Action: Acknowledge Costas's update; note the revised deadline in the task comment.

Triage: Address Bar Toggle Selection: Animated Assets [2-3d] (1214627423981798) — due TODAY Top_priority task, appeared Jun 3. Due today but estimated 2-3d — can't complete today. Action: Clarify scope and set a realistic due date before it silently stays overdue.

Triage: duck.ai onboarding Localization (1215353333476330) — inbox, no due, added Jun 3 Context unclear from snapshot — who's the DRI? Action: Quick triage: assign or defer.

PR Reviews (batch — after TP block) 6 review requests queued: Bump nativeStorage rollout, Enable ad blocking soft launch, [macOS] Improve value transformer observability, [macOS] Avoid force unwrap crash, Fix maestro tests, Enable iPad toggle for iOS 7.211. Weekly plan also has: Drop macOS 11 Big Sur Support — Diego's PR is almost ready, already in review queue. Action: Batch these after the afternoon TP/Career block.


🟡 Delegated — Follow Up Needed

[OVERDUE 14d] Privacy Triage: iOS Demo tracker blocking after chat in onboarding (1214965405681675) — Jake Abel, due May 21 Action: Ping Jake for status update.

[OVERDUE 10d] 🤖 Check for dependabot PRs (1215057989642782) — Tom Strba, due May 25 Action: Check if completed; if not, ping Tom or close as stale.


🔵 Rhythms

TP: "Persist 'You've got this' dialogue" COMPLETED Jun 3. 🎉 Good delivery.

New TP: iOS Address onboarding conflicts with unified input — due Jun 5, implementation underway. Next TP Thread: Alex posted a Jun 3 status update on this task but no formal "Next TP Thread" announcement (team-facing comment naming it as incoming TP). Check if this was done in the Tue kick-off meeting — if not, post a short Next TP Thread comment today.

Upcoming this week:

  • ⚠️ WWDC AFK starts Monday Jun 8 — handoff brief due tomorrow (Jun 5). Start today. AFK reminder fired overnight. Draft should cover: Address onboarding in-flight state, AOR Crash Reporting secondary expectations.
  • 1:1 with Dominik — Jun 9 (first opportunity after his OOO; prep agenda items over the weekend).
  • O-L Weekly — Jun 8 | Apple Weekly + O-N Weekly — Jun 9 (both during AFK week).

Snapshot: 2026-06-04 04:05 UTC. Yesterday's brief: none found (Jun 3 not generated).