[2026-06-04] daily brief

This commit is contained in:
Alexey Martemyanov
2026-06-04 10:11:22 +06:00
parent f3689d64e9
commit 756748d135
+98
View File
@@ -0,0 +1,98 @@
---
## Daily Brief — 2026-06-04
### ✨ Morning
On June 4, 1896, at 2 AM, Henry Ford took his first car — the "Quadricycle" — for a spin through the empty streets of Detroit. To get it out of his workshop, he had to knock down a brick wall with an axe. The whole drive lasted 30 minutes.
🧖 Sauna day — don't skip it.
💧 Start with a glass of water.
## Plan for Today
1. ⚡ Desktop Browser Feature Owner Survey — 5-min anonymous survey, 9d overdue — just knock it out
2. 🔴 Merge PR #5149 (Hide Free plan) — CI ✅ review ✅, ready to land
3. 🔴 Fix CI on PR #5246 (Try Visiting a Site Background) — Ship Review gated on this, due Jun 8
4. Reply to Costas on Treatment B — he relaxed deadline to Jun 29; acknowledge + note updated plan
5. iOS Address onboarding — main TP block (continue from Wed implementation)
6. Career block (90 min): Draft Part 1 of Project Advisor Readiness self-reflection
7. Start WWDC handoff brief draft — due tomorrow
8. Review queue: Drop macOS 11 Big Sur + 5 other PRs (batch after TP)
9. Check if PR Check on main (Sam's fix) landed — or escalate
---
### 🔴 Urgent / Overdue
**[OVERDUE 9d] Desktop Browser Feature Owner Survey** ([1214940335721015](https://app.asana.com/0/0/1214940335721015)) — due May 26
Context: Anonymous, 5-minute timebox. Has been sitting since Monday — nothing blocks it.
Action: Fill out the survey now.
**[OVERDUE] Hide Free plan • Upgrade in onboarding** ([1215009192158952](https://app.asana.com/0/0/1215009192158952)) — due May 28, PR #5149 CI ✅ review ✅
Context: Landing blocker already cleared. Just needs merge and close.
Action: Merge PR #5149; complete the task.
**[OVERDUE] Try Visiting a Site: Background** ([1214828145455342](https://app.asana.com/0/0/1214828145455342)) — due Jun 3, PR #5246 CI 🔴
Context: PR up for iOS onboarding background dialog. CI failure is the only blocker before Ship Review (due Jun 8) can launch.
Action: Fix CI on PR #5246 today.
**[OVERDUE 20d] PR Check is failing on main** ([1214797526093576](https://app.asana.com/0/0/1214797526093576)) — due May 15
Context: Sam S had a fix PR succeeding overnight as of May/31. No snapshot update since May/17 — unknown if it landed.
Action: Verify Sam's PR merged. If not, follow up directly.
**Backlog cluster** (stale-dated inbox/planning items — not individually urgent):
- Bug: Tab preview stuck (Apr 2025)
- Duo login to Grafana doesn't persist (Jul 2025)
- Assertion Failure Pixel Anomaly (Sep 2025)
- Pinned tab opens link in background (May 1)
- Text selection in address bar (May 1)
- Follow-up: Inline Text Images / TypingTextAnimation (May 28, PR #4663 draft exists)
---
### 🟠 Needs Action Today
**Ship Review (DRI) — iOS Address onboarding conflicts** ([1215009192158961](https://app.asana.com/0/0/1215009192158961)) — due Jun 8
Created yesterday. AOR sign-off subtasks need to be opened. Prerequisite: PR #5246 CI must pass first.
Action: Once CI is green — set up Ship Review subtasks and ping AOR contacts.
**Reply to Costas — Treatment B deadline** ([1215009192158955](https://app.asana.com/0/0/1215009192158955))
Costas commented Jun 3: "Jun 29 is the actual hard deadline — not June 15." Alex's prior comment set June 15 as the target. Costas confirmed June 29 is fine once experiment wraps.
Action: Acknowledge Costas's update; note the revised deadline in the task comment.
**Triage: Address Bar Toggle Selection: Animated Assets [2-3d]** ([1214627423981798](https://app.asana.com/0/0/1214627423981798)) — due TODAY
Top_priority task, appeared Jun 3. Due today but estimated 2-3d — can't complete today.
Action: Clarify scope and set a realistic due date before it silently stays overdue.
**Triage: duck.ai onboarding Localization** ([1215353333476330](https://app.asana.com/0/0/1215353333476330)) — inbox, no due, added Jun 3
Context unclear from snapshot — who's the DRI?
Action: Quick triage: assign or defer.
**PR Reviews (batch — after TP block)**
6 review requests queued: Bump nativeStorage rollout, Enable ad blocking soft launch, [macOS] Improve value transformer observability, [macOS] Avoid force unwrap crash, Fix maestro tests, Enable iPad toggle for iOS 7.211.
Weekly plan also has: [Drop macOS 11 Big Sur Support](https://app.asana.com/0/0/1210470859071348) — Diego's PR is almost ready, already in review queue.
Action: Batch these after the afternoon TP/Career block.
---
### 🟡 Delegated — Follow Up Needed
**[OVERDUE 14d] Privacy Triage: iOS Demo tracker blocking after chat in onboarding** ([1214965405681675](https://app.asana.com/0/0/1214965405681675)) — Jake Abel, due May 21
Action: Ping Jake for status update.
**[OVERDUE 10d] 🤖 Check for dependabot PRs** ([1215057989642782](https://app.asana.com/0/0/1215057989642782)) — Tom Strba, due May 25
Action: Check if completed; if not, ping Tom or close as stale.
---
### 🔵 Rhythms
**TP: "Persist 'You've got this' dialogue"** — ✅ COMPLETED Jun 3. 🎉 Good delivery.
**New TP: [iOS Address onboarding conflicts with unified input](https://app.asana.com/0/0/1214592943696234)** — due Jun 5, implementation underway.
Next TP Thread: Alex posted a Jun 3 status update on this task but no formal "Next TP Thread" announcement (team-facing comment naming it as incoming TP). Check if this was done in the Tue kick-off meeting — if not, post a short Next TP Thread comment today.
**Upcoming this week:**
- ⚠️ **WWDC AFK starts Monday Jun 8** — handoff brief due **tomorrow (Jun 5)**. Start today. AFK reminder fired overnight. Draft should cover: Address onboarding in-flight state, AOR Crash Reporting secondary expectations.
- **1:1 with Dominik** — Jun 9 (first opportunity after his OOO; prep agenda items over the weekend).
- O-L Weekly — Jun 8 | Apple Weekly + O-N Weekly — Jun 9 (both during AFK week).
*Snapshot: 2026-06-04 04:05 UTC. Yesterday's brief: none found (Jun 3 not generated).*