[2026-05-31] taiga sync: .stfolder/syncthing-folder-940f59.txt "family/sort/duty-free-\321\201\320\277\320\270\321\201\320\276\320\272.md" "family/sort/feedback-\320\270\320\264\320\265\320\270.md" "family/sort/grohe-\320\272\320\273\321\216\321\207-\320\260\320\272\321\202\320\270\320\262\320\260\321\206\320\270\320\270.md" family/sort/keep-2023-09-13_15_03_43.md
This commit is contained in:
@@ -1,79 +0,0 @@
|
||||
---
|
||||
## Daily Brief — 2026-05-31
|
||||
|
||||
### ✨ Morning
|
||||
On this day in 1859, Big Ben — the iconic clock tower at Westminster — began keeping time for the first time. The bell itself cracked within months and had to be re-cast, but the clockwork mechanism has run almost continuously for 167 years.
|
||||
🚶 Take a short walk before diving in.
|
||||
|
||||
**Anchor**: Today is Sunday. The new week's plan (Mon 2026-06-01 onwards) is set — TP umbrella due Fri 2026-06-05. Yesterday's brief not found (Saturday). New signals since Friday: 3 task changes, 1 new comment (Warn Before Quit pixels), 1 unresolved discussion on Ship AI onboarding winner.
|
||||
|
||||
## Plan for Today
|
||||
|
||||
1. ⚡ **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — 5-min anonymous survey, 5 days overdue. Knock it out first thing.
|
||||
2. 🔴 **Resolve Ship AI onboarding winner discussion** — PR #5145 CI red **and** [Alessandro raised release-feasibility concern](https://app.asana.com/0/0/1215009192158955) Fri 5/29 (tracker blocker experiment may conflict). Decide direction before touching the PR.
|
||||
3. 🔴 **Merge [Hide Free plan • Upgrade](https://app.asana.com/0/0/1215009192158952)** — PR #5149 already ✅ approved, CI green. Quickest TP win.
|
||||
4. 🔴 **Ping reviewers on [Hide stop-chat button](https://app.asana.com/0/0/1215009192158954)** — PR #5173 ✅ CI green but waiting on review (2 days overdue).
|
||||
5. 🟠 **Reply on [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — commenter pinged Fri 5/30 explicitly asking for a PR or a date adjustment. Quick reply or open the PR.
|
||||
6. 🟠 **Start [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950)** — TP subtask due Monday. Last queued piece before Ship Review can open.
|
||||
7. 🟠 **Review [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — 4 days overdue, gated on Big Sur drop closing Mon.
|
||||
8. **PR review batch** — 11 review requests / mentions queued in GitHub. Batch after the TP block.
|
||||
9. **Triage 2 CI failing-tests entries** — combine [#1213975496167929](https://app.asana.com/0/0/1213975496167929) (39d) + [#1214797526093576](https://app.asana.com/0/0/1214797526093576) (16d) into a single triage block.
|
||||
|
||||
---
|
||||
|
||||
### 🔴 Urgent / Overdue
|
||||
|
||||
- **[NEEDS ACTION] [DRI]** — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — top_priority, due 2026-05-28 (3d overdue)
|
||||
Context: PR #5145 has 🔴 CI; Alessandro raised release-feasibility concern Fri 5/29 — tracker blocker experiment still running may invalidate Treatment B release. Costas pushed for iPhone-only as originally planned. You haven't responded yet → you are the blocker.
|
||||
Action: post a decision on the thread (proceed iPhone-only / pause until experiment ends / proceed both) and then fix or close PR #5145 accordingly.
|
||||
|
||||
- **[NEEDS ACTION] [DRI]** — [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) — top_priority, due 2026-05-28 (3d overdue)
|
||||
Context: PR #5149 ✅ approved + CI green. Just needs merge.
|
||||
Action: merge PR #5149.
|
||||
|
||||
- **[NEEDS ACTION] [DRI]** — [Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954) — top_priority, due 2026-05-29 (2d overdue)
|
||||
Context: PR #5173 ✅ CI green, ⏳ awaiting review.
|
||||
Action: ping reviewers Mon morning to unblock.
|
||||
|
||||
- **[NEEDS ACTION] [DRI]** — [Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — do_later, due 2026-05-29 (2d overdue)
|
||||
Context: New comment on 2026-05-30 (only fresh comment in 24h): _"This pixel is overdue for removal, please prepare a PR. If you need more time, add a comment and adjust the due date as needed."_
|
||||
Action: reply with timeline OR open the PR. Pair with [Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969) cleanup (related work, ~30 min total).
|
||||
|
||||
- **[OVERDUE] [DRI]** — [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916) — inbox, due 2026-05-27 (4d overdue)
|
||||
- **[OVERDUE] [DRI]** — [Follow-up: add Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — inbox, due 2026-05-28 (3d overdue)
|
||||
- **[OVERDUE] [DRI]** — [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — inbox, due 2026-05-26 (5d overdue, 5-min task)
|
||||
- **[OVERDUE] [DRI]** — [PR Check is failing on main — testWhenTabWithConnectionLostError…](https://app.asana.com/0/0/1213975496167929) — active, 39d overdue + [PR Check is failing on main](https://app.asana.com/0/0/1214797526093576) — inbox, 16d overdue → combined triage.
|
||||
- **[OVERDUE] [DRI]** — [Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128) (30d) + [Text selection in the address bar](https://app.asana.com/0/0/1214071796247142) (30d) — feedback-board items going stale → triage or punt to backlog.
|
||||
|
||||
**Backlog cluster (>6 months overdue, low signal)**: Bug: Tab preview stuck (2025-04), Duo login to Grafana (2025-07), Assertion Failure Pixel Anomaly (2025-09), Review Overdue Tasks Summary (2026-01), plus ~75 items in do_later/quick_wins/hack_days. Not urgent today.
|
||||
|
||||
### 🟠 Needs Action Today
|
||||
|
||||
**Ship Reviews (DRI)**
|
||||
- [Ship Review: iOS Address onboarding…](https://app.asana.com/0/0/1215009192158961) — not yet opened. Waiting on "You've got this" subtask. Open Thu 2026-06-04 once subtask lands.
|
||||
|
||||
**PR Reviews**
|
||||
- **11 review requests + mentions queued in GitHub.** Notable: 2 privacy-configuration rollout PRs, 2 macOS crash-fix PRs, maestro tests, iOS Tailored Onboarding mention. Batch after the TP block.
|
||||
|
||||
**Tech Designs / PFRs / Incidents**: None blocking today.
|
||||
|
||||
### 🟡 Delegated — Follow Up Needed
|
||||
|
||||
- **STALE** — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896) — assignee blank, 75 days no activity, no matching merged GitHub PR. Action: ping current owner or close.
|
||||
- **OVERDUE** — [Privacy Triage: iOS Demo tracker blocking after chat](https://app.asana.com/0/0/1214965405681675) — Jake Abel, 10d overdue. On the critical path for the [ON HOLD] TP item — ping Jake Mon.
|
||||
- **UPCOMING** — [Pinned tab activates in other window unpinning](https://app.asana.com/0/0/1210705465887828) — Juan Pereira, due Wed 2026-06-03. Noting only.
|
||||
|
||||
### 🔵 Rhythms
|
||||
|
||||
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — last changed 2026-05-29 (fresh ✅). Three PRs in flight, Ship Review opens Thu.
|
||||
|
||||
**Next TP Thread**: TP not yet close to completion (Ship Review hasn't opened) — no action needed; revisit Thu.
|
||||
|
||||
**Upcoming this week**:
|
||||
- Mon 06-01: O-L Weekly. Big Sur drop closes → unblocks Monterrey-only PR.
|
||||
- Tue 06-02: Apple Weekly Team Meeting.
|
||||
- Wed 06-03: O-N Weekly.
|
||||
- **No 1:1 this week** — Dominik AFK Mon–Fri (LDX3 + UK holiday). Next 1:1 window: Tue 2026-06-09.
|
||||
- **Career**: Draft Part 1 of Advisor Readiness doc — Thu deep-work slot.
|
||||
- **AFK ahead**: Partly AFK Jun 8–12 (WWDC '26) — ramp handoffs late this week.
|
||||
- **Friday rhythm**: 2026-05-29 weekly review missing — restore the cadence so next Monday has a proper base.
|
||||
@@ -1,17 +0,0 @@
|
||||
## Inbox Triage — 2026-05-31 (since 2026-05-31 12:28)
|
||||
|
||||
### New / Changed — Action Required
|
||||
_None._
|
||||
|
||||
### New / Changed — Monitoring
|
||||
_None._
|
||||
|
||||
### Nothing new
|
||||
Inbox quiet — nothing new.
|
||||
|
||||
_Notes:_
|
||||
- Previous triage at 11:54 already covered the day's signals — only 34 min between runs.
|
||||
- Snapshot (`asana_context.md`) generated at 06:58 UTC (~11:58 Almaty), so it precedes SINCE by ~30 min.
|
||||
- Production postgres not reachable from this machine; @mention queries against `stories` could not be executed locally.
|
||||
- No new comments on Alex's tasks, no new assignments, no Ship Review / Tech Design state changes visible in snapshot since the previous run.
|
||||
- Only `Changed in Last 24h` entry with a comment is "Remove or re-evaluate Warn Before Quit pixels" — automated pixel-removal bot reminder (excluded as bot noise).
|
||||
@@ -1,145 +0,0 @@
|
||||
# Weekly Plan — Week of 2026-06-01
|
||||
|
||||
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella task due Fri 2026-06-05; three PRs already in flight (#5149 approved, #5173 awaiting review, #5145 CI red); one remaining subtask ("You've got this" dialogue) due today; Ship Review opens after.
|
||||
|
||||
> ⚠️ **No weekly review found for 2026-05-29** — `/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md` does not exist. Plan derived from DB state + last 24h deltas + snapshot only. Restart Friday rhythm so next week's plan has a proper base.
|
||||
|
||||
### Quadrants
|
||||
|
||||
| Quadrant | This Week | Notes |
|
||||
|---|---|---|
|
||||
| Project | 70% | TP shipping window — ship review opens once "You've got this" lands |
|
||||
| AOR | 15% | Light week: Warn Before Quit pixel PR (commenter pinged Fri), Monterrey-only PR review, two CI-failing tests |
|
||||
| Career | 10% | Dominik AFK Mon–Fri (LDX3 + holiday) → no 1:1; use slot for Project Advisor doc Part 1 |
|
||||
| Strategy | 5% | Monitor Windows AOT delivery plan thread (open disagreement) + Big Sur drop closure |
|
||||
|
||||
Bumped Project to 70% because TP has a hard Friday deadline and Ship Review must open this week. Career boost is **not** triggered (no 1:1 happening) but Project Advisor doc is still owed and Dominik's absence frees the slot.
|
||||
|
||||
### Shape
|
||||
|
||||
**Mon 2026-06-01:** TP — close out queued duck.ai onboarding subtasks
|
||||
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due today, in progress per Friday status
|
||||
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457)
|
||||
- Set 1-Must; clear weekend inbox; respond to #5145 CI failure (Ship AI onboarding winner)
|
||||
|
||||
**Tue 2026-06-02:** TP push + standing meetings
|
||||
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987) — Brindy noted she'll attend early
|
||||
- Drive review on [#5173 (Hide stop-generating button)](https://app.asana.com/0/0/1215009192158954); ping reviewers
|
||||
- Merge [#5149 (Hide Free Plan title)](https://app.asana.com/0/0/1215009192158952) — already approved
|
||||
|
||||
**Wed 2026-06-03:** TP integration work + AOR
|
||||
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364)
|
||||
- [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916) — review and ship (4 days overdue, but waits on Big Sur drop closing)
|
||||
- [Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — commenter Fri 5/30 explicitly asked for a PR
|
||||
|
||||
**Thu 2026-06-04:** Deep work day (Dominik OOO public holiday — no escalation overhead)
|
||||
- Open Ship Review for [iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)
|
||||
- Address remaining optionals from Friday status update
|
||||
- Career: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) (30 min)
|
||||
|
||||
**Fri 2026-06-05:** TP deadline + weekly retro
|
||||
- TP closeout: confirm Ship Review attendees, finalize artifacts
|
||||
- [Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — already 3 days overdue, small follow-up from last sprint
|
||||
- Write weekly review (restore the Friday rhythm)
|
||||
- **Skip 1:1 prep** — no 1:1 next week (next earliest window is Tue 2026-06-09)
|
||||
|
||||
### Must-Not-Forget
|
||||
|
||||
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
|
||||
due 2026-06-01 (today) — Friday status said "plan to complete on Mon"; this is the last queued subtask before Ship Review can open
|
||||
|
||||
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
3 days overdue — PR #5145 has 🔴 CI; either fix CI or reassess; this blocks the umbrella TP
|
||||
|
||||
- [ ] **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — assignee: Alex
|
||||
due 2026-05-29 — commenter pinged Fri 5/30 with "please prepare a PR. If you need more time, add a comment and adjust the due date." This needs a reply *or* a PR by mid-week.
|
||||
|
||||
- [ ] **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — assignee: Alex
|
||||
due 2026-05-26 (5 days overdue) — 5 minute timebox, anonymous; just do it Monday morning
|
||||
|
||||
- [ ] **[PR Check is failing on main — testWhenTabWithConnectionLostErrorActivatedAndReload…](https://app.asana.com/0/0/1213975496167929)** — assignee: Alex
|
||||
due 2026-04-22 (39 days overdue, "active" section) — CI failing tests on main left to rot; either fix or hand off this week
|
||||
|
||||
### AOR Quick Wins This Week
|
||||
|
||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||
overdue 37 days — feature flag cleanup, ~30 min once the pixel removal PR is up (related work)
|
||||
|
||||
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
|
||||
overdue 16 days — second CI failure entry; combine triage with the older one above
|
||||
|
||||
- **[Confirm defaultValue for popupBlocking migration](https://app.asana.com/0/0/1214004917427136)**
|
||||
inbox, no due date but stale — single confirmation decision, <30 min
|
||||
|
||||
### Sprint Backlog (pick 1–2 if time allows)
|
||||
|
||||
- **[Bug: Tab preview stuck around - 2d](https://app.asana.com/0/0/1208347387296425)**
|
||||
due 2025-04-15 — old macOS Browser Bugs ticket, paired bug with a recent feedback report; review whether still reproducing
|
||||
|
||||
- **[Duo login to Grafana doesn't persist through browser restart](https://app.asana.com/0/0/1210861740617086)**
|
||||
due 2025-07-23 — Internal Support Inbox, low cost to validate / close
|
||||
|
||||
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
|
||||
due 2025-09-17 — pixel anomaly investigation, may already be resolved
|
||||
|
||||
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
|
||||
due 2026-01-27 — meta task to triage your own backlog; ironically the right tool to clear the rest of this list
|
||||
|
||||
(+ ~5 aged items >180 days in backlog — not listed)
|
||||
|
||||
### On Radar
|
||||
|
||||
- **[macOS] Reduce real WKWebView loads during unit tests** — Sam S posted Fri "fix isn't good enough yet". Touches macOS test infra you co-own. Engage if asked.
|
||||
- **Sorting in big HTML is 15sec compared to Vivaldi's 2 second** — Ivy proposed a performance test framework approach Fri. Performance work that may touch macOS browser. Monitor.
|
||||
- **[macOS/iOS] Faster CI builds through compilation caching** — Diego reported WMO neutralized wall-time gains; ~38 min compute gain remains. Relevant to your Apple DevEx AOR.
|
||||
- **CEF: Failing tests when 'setTabTitlesEarly' is enabled** — Kris zeroing in on root cause. Watch for a fix-and-merge ping.
|
||||
- **Drop macOS 11 Big Sur Support — project closing Mon 2026-06-01** — Diego confirmed; ties into your Monterrey-only PR.
|
||||
- **TD: AOR: Desktop Browsers Operational Health** — Elle flagged macOS no longer sending `site_loading_performance` pixel. Touches macOS instrumentation. Engage.
|
||||
|
||||
### Career Action This Week
|
||||
|
||||
**Picked**: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) — 30 min block on Thursday.
|
||||
|
||||
Skipped:
|
||||
- 1:1 prep — Dominik is AFK June 1–5 (LDX3 trip + UK public holiday). Next 1:1 window is Tue 2026-06-09.
|
||||
- Primary AOR discussion — needs 1:1 timing; deferred to 2026-06-09 agenda.
|
||||
- Christie calibration ping — defer one more week; raise with Dominik on 2026-06-09.
|
||||
- Assessment visibility comment — no active O-N/O-L Assessment surfaced in DB this week.
|
||||
|
||||
### On Radar / Participation Needed
|
||||
|
||||
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
|
||||
You posted twice Fri 5/30 expressing concern about duplication with your existing plan (gid 1214387907502685). Ivy clarified intent; this needs a follow-up from you Mon — engage.
|
||||
|
||||
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
|
||||
Boli asked Bulcsu what's missing to support isolated worlds. May intersect with your Windows scope concern above. Monitor.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
|
||||
Elle flagged missing macOS `site_loading_performance` pixel. This is in your wheelhouse — short comment to acknowledge / route the fix would be appropriate.
|
||||
|
||||
### Carried Forward from Last Week
|
||||
|
||||
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — Alex (DRI)
|
||||
→ see TP section above
|
||||
|
||||
- **[PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields](https://app.asana.com/0/0/1207521936429896)** — delegated (unassigned)
|
||||
Stale 75 days — no matching merged GitHub PR found. Action: ping or close this week.
|
||||
|
||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
|
||||
Last 1:1 was 2026-05-26; Dominik AFK all week. Don't add new items until 2026-06-08 (next agenda window).
|
||||
|
||||
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — Alex
|
||||
Due 2026-05-28 (3 days overdue), inbox, macOS Release Board. Small follow-up from last sprint — slot Friday.
|
||||
|
||||
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — Alex
|
||||
No due date but related to the on-hold TP item — confirm whether NA analysis prerequisite changes the "ON HOLD" status before end of week.
|
||||
|
||||
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — Alex
|
||||
→ also surfaced in Must-Not-Forget; complete Monday and remove from rolling list.
|
||||
|
||||
---
|
||||
*Based on DB state as of 2026-05-31 11:09 (sync fresh). No weekly review file for 2026-05-29 — that rhythm needs restoring this Friday.*
|
||||
|
||||
**Notes on the inputs you provided:**
|
||||
- You specified `MONDAY_DATE=2026-05-25`, but today is Sunday 2026-05-31, so the upcoming Monday is 2026-06-01. I saved the plan as `plan-2026-06-01.md` (the week the plan actually covers). If you intended a retroactive plan for the week of 2026-05-25, let me know and I'll regenerate.
|
||||
- `LAST_FRIDAY_DATE=2026-05-29` matched the Friday immediately before today. The weekly review file for that date doesn't exist on disk — flagged in the plan; restoring the Friday rhythm this week would give next Monday a proper base.
|
||||
@@ -1,141 +0,0 @@
|
||||
# Weekly Plan — Week of 2026-06-01
|
||||
|
||||
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — umbrella task due Fri 2026-06-05; three PRs already in flight (#5149 approved, #5173 awaiting review, #5145 CI red); one remaining subtask ("You've got this" dialogue) due today; Ship Review opens after.
|
||||
|
||||
> ⚠️ **No weekly review found for 2026-05-29** — `/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md` does not exist. Plan derived from DB state + last 24h deltas + snapshot only. Restart Friday rhythm so next week's plan has a proper base.
|
||||
|
||||
### Quadrants
|
||||
|
||||
| Quadrant | This Week | Notes |
|
||||
|---|---|---|
|
||||
| Project | 70% | TP shipping window — ship review opens once "You've got this" lands |
|
||||
| AOR | 15% | Light week: Warn Before Quit pixel PR (commenter pinged Fri), Monterrey-only PR review, two CI-failing tests |
|
||||
| Career | 10% | Dominik AFK Mon–Fri (LDX3 + holiday) → no 1:1; use slot for Project Advisor doc Part 1 |
|
||||
| Strategy | 5% | Monitor Windows AOT delivery plan thread (open disagreement) + Big Sur drop closure |
|
||||
|
||||
Bumped Project to 70% because TP has a hard Friday deadline and Ship Review must open this week. Career boost is **not** triggered (no 1:1 happening) but Project Advisor doc is still owed and Dominik's absence frees the slot.
|
||||
|
||||
### Shape
|
||||
|
||||
**Mon 2026-06-01:** TP — close out queued duck.ai onboarding subtasks
|
||||
- [Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950) — due today, in progress per Friday status
|
||||
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457)
|
||||
- Set 1-Must; clear weekend inbox; respond to #5145 CI failure (Ship AI onboarding winner)
|
||||
|
||||
**Tue 2026-06-02:** TP push + standing meetings
|
||||
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987) — Brindy noted she'll attend early
|
||||
- Drive review on [#5173 (Hide stop-generating button)](https://app.asana.com/0/0/1215009192158954); ping reviewers
|
||||
- Merge [#5149 (Hide Free Plan title)](https://app.asana.com/0/0/1215009192158952) — already approved
|
||||
|
||||
**Wed 2026-06-03:** TP integration work + AOR
|
||||
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364)
|
||||
- [PR: Make our macOS app Monterrey-only - 1-3d](https://app.asana.com/0/0/1215150214975916) — review and ship (4 days overdue, but waits on Big Sur drop closing)
|
||||
- [Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — commenter Fri 5/30 explicitly asked for a PR
|
||||
|
||||
**Thu 2026-06-04:** Deep work day (Dominik OOO public holiday — no escalation overhead)
|
||||
- Open Ship Review for [iOS Address onboarding](https://app.asana.com/0/0/1215009192158961)
|
||||
- Address remaining optionals from Friday status update
|
||||
- Career: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) (30 min)
|
||||
|
||||
**Fri 2026-06-05:** TP deadline + weekly retro
|
||||
- TP closeout: confirm Ship Review attendees, finalize artifacts
|
||||
- [Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193) — already 3 days overdue, small follow-up from last sprint
|
||||
- Write weekly review (restore the Friday rhythm)
|
||||
- **Skip 1:1 prep** — no 1:1 next week (next earliest window is Tue 2026-06-09)
|
||||
|
||||
### Must-Not-Forget
|
||||
|
||||
- [ ] **[Persist 'You've got this' dialogue in non-focused state [2d]](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
|
||||
due 2026-06-01 (today) — Friday status said "plan to complete on Mon"; this is the last queued subtask before Ship Review can open
|
||||
|
||||
- [ ] **[Ship AI onboarding winner (Treatment B) [0.5d]](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
3 days overdue — PR #5145 has 🔴 CI; either fix CI or reassess; this blocks the umbrella TP
|
||||
|
||||
- [ ] **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)** — assignee: Alex
|
||||
due 2026-05-29 — commenter pinged Fri 5/30 with "please prepare a PR. If you need more time, add a comment and adjust the due date." This needs a reply *or* a PR by mid-week.
|
||||
|
||||
- [ ] **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — assignee: Alex
|
||||
due 2026-05-26 (5 days overdue) — 5 minute timebox, anonymous; just do it Monday morning
|
||||
|
||||
- [ ] **[PR Check is failing on main — testWhenTabWithConnectionLostErrorActivatedAndReload…](https://app.asana.com/0/0/1213975496167929)** — assignee: Alex
|
||||
due 2026-04-22 (39 days overdue, "active" section) — CI failing tests on main left to rot; either fix or hand off this week
|
||||
|
||||
### AOR Quick Wins This Week
|
||||
|
||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||
overdue 37 days — feature flag cleanup, ~30 min once the pixel removal PR is up (related work)
|
||||
|
||||
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
|
||||
overdue 16 days — second CI failure entry; combine triage with the older one above
|
||||
|
||||
- **[Confirm defaultValue for popupBlocking migration](https://app.asana.com/0/0/1214004917427136)**
|
||||
inbox, no due date but stale — single confirmation decision, <30 min
|
||||
|
||||
### Sprint Backlog (pick 1–2 if time allows)
|
||||
|
||||
- **[Bug: Tab preview stuck around - 2d](https://app.asana.com/0/0/1208347387296425)**
|
||||
due 2025-04-15 — old macOS Browser Bugs ticket, paired bug with a recent feedback report; review whether still reproducing
|
||||
|
||||
- **[Duo login to Grafana doesn't persist through browser restart](https://app.asana.com/0/0/1210861740617086)**
|
||||
due 2025-07-23 — Internal Support Inbox, low cost to validate / close
|
||||
|
||||
- **[Assertion Failure Pixel Anomaly - 2025/09/15](https://app.asana.com/0/0/1211379705725021)**
|
||||
due 2025-09-17 — pixel anomaly investigation, may already be resolved
|
||||
|
||||
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
|
||||
due 2026-01-27 — meta task to triage your own backlog; ironically the right tool to clear the rest of this list
|
||||
|
||||
(+ ~5 aged items >180 days in backlog — not listed)
|
||||
|
||||
### On Radar
|
||||
|
||||
- **[macOS] Reduce real WKWebView loads during unit tests** — Sam S posted Fri "fix isn't good enough yet". Touches macOS test infra you co-own. Engage if asked.
|
||||
- **Sorting in big HTML is 15sec compared to Vivaldi's 2 second** — Ivy proposed a performance test framework approach Fri. Performance work that may touch macOS browser. Monitor.
|
||||
- **[macOS/iOS] Faster CI builds through compilation caching** — Diego reported WMO neutralized wall-time gains; ~38 min compute gain remains. Relevant to your Apple DevEx AOR.
|
||||
- **CEF: Failing tests when 'setTabTitlesEarly' is enabled** — Kris zeroing in on root cause. Watch for a fix-and-merge ping.
|
||||
- **Drop macOS 11 Big Sur Support — project closing Mon 2026-06-01** — Diego confirmed; ties into your Monterrey-only PR.
|
||||
- **TD: AOR: Desktop Browsers Operational Health** — Elle flagged macOS no longer sending `site_loading_performance` pixel. Touches macOS instrumentation. Engage.
|
||||
|
||||
### Career Action This Week
|
||||
|
||||
**Picked**: [Draft Part 1 of Advisor Readiness doc](https://app.asana.com/0/0/1210386994396212) — 30 min block on Thursday.
|
||||
|
||||
Skipped:
|
||||
- 1:1 prep — Dominik is AFK June 1–5 (LDX3 trip + UK public holiday). Next 1:1 window is Tue 2026-06-09.
|
||||
- Primary AOR discussion — needs 1:1 timing; deferred to 2026-06-09 agenda.
|
||||
- Christie calibration ping — defer one more week; raise with Dominik on 2026-06-09.
|
||||
- Assessment visibility comment — no active O-N/O-L Assessment surfaced in DB this week.
|
||||
|
||||
### On Radar / Participation Needed
|
||||
|
||||
- **[Desktop Browsers: Windows - Produce delivery plan for Windows Browser AOT build](https://app.asana.com/0/0/1215255758473719)**
|
||||
You posted twice Fri 5/30 expressing concern about duplication with your existing plan (gid 1214387907502685). Ivy clarified intent; this needs a follow-up from you Mon — engage.
|
||||
|
||||
- **[Windows Browser: Re-enable isolated JS worlds](https://app.asana.com/0/0/1207088850938070)**
|
||||
Boli asked Bulcsu what's missing to support isolated worlds. May intersect with your Windows scope concern above. Monitor.
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
|
||||
Elle flagged missing macOS `site_loading_performance` pixel. This is in your wheelhouse — short comment to acknowledge / route the fix would be appropriate.
|
||||
|
||||
### Carried Forward from Last Week
|
||||
|
||||
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — Alex (DRI)
|
||||
→ see TP section above
|
||||
|
||||
- **[PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields](https://app.asana.com/0/0/1207521936429896)** — delegated (unassigned)
|
||||
Stale 75 days — no matching merged GitHub PR found. Action: ping or close this week.
|
||||
|
||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
|
||||
Last 1:1 was 2026-05-26; Dominik AFK all week. Don't add new items until 2026-06-08 (next agenda window).
|
||||
|
||||
- **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — Alex
|
||||
Due 2026-05-28 (3 days overdue), inbox, macOS Release Board. Small follow-up from last sprint — slot Friday.
|
||||
|
||||
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — Alex
|
||||
No due date but related to the on-hold TP item — confirm whether NA analysis prerequisite changes the "ON HOLD" status before end of week.
|
||||
|
||||
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — Alex
|
||||
→ also surfaced in Must-Not-Forget; complete Monday and remove from rolling list.
|
||||
|
||||
---
|
||||
*Based on DB state as of 2026-05-31 11:09 (sync fresh). No weekly review file for 2026-05-29 — that rhythm needs restoring this Friday.*
|
||||
Reference in New Issue
Block a user