Files
obsidian-vault/work/briefs/weekly/plan-2026-05-25.md
T

10 KiB
Raw Blame History

Weekly Plan — Week of 2026-06-01

Top Priority: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — umbrella task due Fri 2026-06-05; three PRs already in flight (#5149 approved, #5173 awaiting review, #5145 CI red); one remaining subtask ("You've got this" dialogue) due today; Ship Review opens after.

⚠️ No weekly review found for 2026-05-29/Users/admin/obsidian/work/briefs/weekly/2026-05-29.md does not exist. Plan derived from DB state + last 24h deltas + snapshot only. Restart Friday rhythm so next week's plan has a proper base.

Quadrants

Quadrant This Week Notes
Project 70% TP shipping window — ship review opens once "You've got this" lands
AOR 15% Light week: Warn Before Quit pixel PR (commenter pinged Fri), Monterrey-only PR review, two CI-failing tests
Career 10% Dominik AFK MonFri (LDX3 + holiday) → no 1:1; use slot for Project Advisor doc Part 1
Strategy 5% Monitor Windows AOT delivery plan thread (open disagreement) + Big Sur drop closure

Bumped Project to 70% because TP has a hard Friday deadline and Ship Review must open this week. Career boost is not triggered (no 1:1 happening) but Project Advisor doc is still owed and Dominik's absence frees the slot.

Shape

Mon 2026-06-01: TP — close out queued duck.ai onboarding subtasks

Tue 2026-06-02: TP push + standing meetings

Wed 2026-06-03: TP integration work + AOR

Thu 2026-06-04: Deep work day (Dominik OOO public holiday — no escalation overhead)

Fri 2026-06-05: TP deadline + weekly retro

Must-Not-Forget

AOR Quick Wins This Week

Sprint Backlog (pick 12 if time allows)

(+ ~5 aged items >180 days in backlog — not listed)

On Radar

  • [macOS] Reduce real WKWebView loads during unit tests — Sam S posted Fri "fix isn't good enough yet". Touches macOS test infra you co-own. Engage if asked.
  • Sorting in big HTML is 15sec compared to Vivaldi's 2 second — Ivy proposed a performance test framework approach Fri. Performance work that may touch macOS browser. Monitor.
  • [macOS/iOS] Faster CI builds through compilation caching — Diego reported WMO neutralized wall-time gains; ~38 min compute gain remains. Relevant to your Apple DevEx AOR.
  • CEF: Failing tests when 'setTabTitlesEarly' is enabled — Kris zeroing in on root cause. Watch for a fix-and-merge ping.
  • Drop macOS 11 Big Sur Support — project closing Mon 2026-06-01 — Diego confirmed; ties into your Monterrey-only PR.
  • TD: AOR: Desktop Browsers Operational Health — Elle flagged macOS no longer sending site_loading_performance pixel. Touches macOS instrumentation. Engage.

Career Action This Week

Picked: Draft Part 1 of Advisor Readiness doc — 30 min block on Thursday.

Skipped:

  • 1:1 prep — Dominik is AFK June 15 (LDX3 trip + UK public holiday). Next 1:1 window is Tue 2026-06-09.
  • Primary AOR discussion — needs 1:1 timing; deferred to 2026-06-09 agenda.
  • Christie calibration ping — defer one more week; raise with Dominik on 2026-06-09.
  • Assessment visibility comment — no active O-N/O-L Assessment surfaced in DB this week.

On Radar / Participation Needed

Carried Forward from Last Week


Based on DB state as of 2026-05-31 11:09 (sync fresh). No weekly review file for 2026-05-29 — that rhythm needs restoring this Friday.

Notes on the inputs you provided:

  • You specified MONDAY_DATE=2026-05-25, but today is Sunday 2026-05-31, so the upcoming Monday is 2026-06-01. I saved the plan as plan-2026-06-01.md (the week the plan actually covers). If you intended a retroactive plan for the week of 2026-05-25, let me know and I'll regenerate.
  • LAST_FRIDAY_DATE=2026-05-29 matched the Friday immediately before today. The weekly review file for that date doesn't exist on disk — flagged in the plan; restoring the Friday rhythm this week would give next Monday a proper base.