[2026-05-31] sync: merge conflicts present — manual review needed
This commit is contained in:
Executable → Regular
@@ -1,79 +0,0 @@
|
||||
---
|
||||
## Daily Brief — 2026-05-31
|
||||
|
||||
### ✨ Morning
|
||||
On this day in 1884, John Harvey Kellogg patented "flaked cereal" — a breakfast staple invented by a doctor running a Michigan sanitarium, originally as health food. The dough was accidentally left to stand, rolled out anyway, and the resulting flakes turned out to be exactly what he was after. Most modern habits started as someone's mistake.
|
||||
🌿 Sunday — step outside for 5 minutes before opening anything with a screen.
|
||||
|
||||
> _Today's anchor: Sunday — weekly plan says shape starts Monday. No new signals since last sync (0 task changes, 0 new comments in 24h). Yesterday's brief not found (Saturday)._
|
||||
|
||||
## Plan for Today
|
||||
|
||||
1. ⚡ **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — 5-min anonymous timebox. Overdue 5d, planned for Mon inbox sweep — knock it out today to clear Monday for TP work.
|
||||
2. 🔴 **Decide on [Ship AI onboarding (Treatment B)](https://app.asana.com/0/0/1215009192158955) experiment-conflict** — Alessandro asked May/29 whether to wait for experiment min-sample-size before flipping Treatment B. Decision unblocks PR #5145 fix on Monday. Read the [NA Analysis thread](https://app.asana.com/0/0/1215186850972358) (Dax bot enrollment data) before deciding.
|
||||
3. **Confirm Monday 1-Must**: finish Persist 'You've got this' PR (per weekly plan).
|
||||
|
||||
(Sunday is a rest/prep day per weekly plan — keep it light. Real shape starts Mon Jun 1.)
|
||||
|
||||
---
|
||||
|
||||
### 🔴 Urgent / Overdue
|
||||
|
||||
Carried over from last week — all already scheduled in the weekly plan, not new:
|
||||
|
||||
- 🔴 [DRI] — **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** (due 2026-05-28, overdue 3d)
|
||||
Context: PR #5145 CI 🔴; Alessandro's experiment-conflict question still open.
|
||||
Action: Decide today (item #2 above) → fix CI Monday.
|
||||
|
||||
- 🔴 [Author] — **[PR: Make macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** (due 2026-05-27, overdue 4d)
|
||||
Context: Diego confirmed last Big Sur release ships Jun 8. WWDC AFK starts Jun 8 → must land Thu Jun 4.
|
||||
Action: scheduled Thu Jun 4 per weekly plan.
|
||||
|
||||
- 🔴 [Author] — **[Follow-up: Inline Text Images in TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** (due 2026-05-28, overdue 3d)
|
||||
Context: executor PR #4663 draft + ✅, waiting on Alex to flip to ready.
|
||||
Action: Mon — flip PR to ready, request review.
|
||||
|
||||
- 🟠 [DRI] — **[Hide Free plan • Upgrade](https://app.asana.com/0/0/1215009192158952)** (due 2026-05-28, overdue 3d)
|
||||
Context: PR #5149 CI ✅, waiting reviewer. Alex is NOT the current blocker.
|
||||
Action: monitor — chase reviewer Mon if no movement.
|
||||
|
||||
- 🟠 [DRI] — **[Hide "stop chat" button](https://app.asana.com/0/0/1215009192158954)** (due 2026-05-29, overdue 2d)
|
||||
Context: PR #5173 CI ✅, waiting reviewer. Alex is NOT the current blocker.
|
||||
Action: monitor — chase reviewer Mon if no movement.
|
||||
|
||||
_Backlog cluster (do_later / quick_wins / sprint backlog) — informational only:_
|
||||
Warn Before Quit pixels (overdue 2d), warnBeforeQuit feature flag (overdue 37d), PR Check failing on main x2 (overdue 16–39d), Text selection in address bar (overdue 30d), Pinned tab opens in background (overdue 30d). Weekly plan slots two of these as AOR Quick Wins this week — no Sunday action needed.
|
||||
|
||||
### 🟠 Needs Action Today
|
||||
|
||||
None — Sunday. The Treatment B decision is the only quasi-action and it's in the Plan above.
|
||||
|
||||
**Monday queue preview** (so you walk in knowing the shape):
|
||||
- **Ship Reviews (DRI)**: [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — not yet opened; reviewer threads empty. Scheduled to open Wed Jun 3.
|
||||
- **PR Reviews**: 6 review requests + 5 mentions queued (privacy-configuration x3, apple-browsers x8). Batch after TP block. None overdue >5d.
|
||||
- **Tech Designs**: none surfaced.
|
||||
- **PFRs**: none.
|
||||
- **Incidents**: none.
|
||||
|
||||
### 🟡 Delegated — Follow Up Needed
|
||||
|
||||
- **[Privacy Triage: iOS Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — Jake Abel, due 2026-05-21 (overdue 10d).
|
||||
Suggested follow-up Mon: "Hi Jake — just a nudge on the privacy triage for the iOS demo tracker onboarding. We're approaching ship date on the related project Jun 5 and would like to close this out before AFK Jun 8."
|
||||
|
||||
- **[PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896)** — 75d stale, no GitHub match found.
|
||||
Action: this one is going cold. Mon or whenever — check assignee and either reassign, descope, or kill the task.
|
||||
|
||||
(116 total delegated open, but the rest are tracking-only / `Watched` / `O-L Backlog` items that don't need follow-up this week.)
|
||||
|
||||
### 🔵 Rhythms
|
||||
|
||||
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — set this week, modified 2026-05-29. Fresh ✅.
|
||||
|
||||
**Next TP Thread**: N/A — current TP not close to completion (3 of 4 subtasks still in flight, Ship Review not yet opened).
|
||||
|
||||
**Upcoming this week**:
|
||||
- Mon Jun 1: [O-L Weekly](https://app.asana.com/0/0/1215106190309457) — standing
|
||||
- Tue Jun 2: [Apple Weekly](https://app.asana.com/0/0/1215138977402987) — standing; also propose [iOS project Kickoff](https://app.asana.com/0/0/1214592943696234) at O-N
|
||||
- Wed Jun 3: [O-N Weekly](https://app.asana.com/0/0/1215156632997364); open Ship Review; Career block (30 min Project Advisor doc)
|
||||
- **No 1:1 with Dominik** (OOO Jun 1–5 — LDX3 + Public Holiday). Next likely 1:1 = week of Jun 15.
|
||||
- **AFK starts next Mon Jun 8** (WWDC '26, Jun 8–12) — Fri handoff brief due.
|
||||
@@ -1,4 +1,4 @@
|
||||
## Inbox Triage — 2026-05-31 (since 2026-05-31 18:01)
|
||||
## Inbox Triage — 2026-05-31 (since 2026-05-31 18:06)
|
||||
|
||||
### New / Changed — Action Required
|
||||
_None._
|
||||
@@ -15,7 +15,7 @@ _Notes:_
|
||||
- Comments on delegated tasks since SINCE — 0 rows.
|
||||
- New / changed assignments to Alex since SINCE — 0 rows.
|
||||
- No Ship Review / Tech Design state changes, no incident or rotation events.
|
||||
- Last sync: 2026-05-31 18:05 Almaty (12:05 UTC); SINCE (18:01) is just 4 min before sync — essentially zero new-data window.
|
||||
- Focus check passed: Sunday 17:05 Almaty, no Dominik 1:1, no Apple Weekly today, status.md `Now: No recent activity detected` (not in deep focus).
|
||||
- Last sync: 2026-05-31 18:37 Almaty (12:37 UTC); SINCE (18:06) falls ~31 min before sync — minimal new-data window.
|
||||
- Focus check passed: Sunday 17:00 Almaty, no Dominik 1:1, no Apple Weekly today (DB returned 0 rows), status.md `Now: No recent activity detected` (not in deep focus).
|
||||
- Outstanding AOR comments and bot feedback threads remain in `status.md` 🔴 Signals — those belong in daily-brief, not inbox triage.
|
||||
- Prior triages today (13:01, 14:17, 15:01, 15:24, 17:00) also quiet; no human signal landed in this window.
|
||||
- Prior triages today (13:01, 14:17, 15:01, 15:24, 17:00, 18:01) also quiet; no human signal landed in this window.
|
||||
|
||||
@@ -1,137 +0,0 @@
|
||||
# Weekly Plan — Week of 2026-05-31
|
||||
|
||||
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — DRI, project due 2026-06-05, all four onboarding subtasks land this week, then Ship Review.
|
||||
|
||||
Current state (from May/29 status update):
|
||||
- [Hide Free plan • Upgrade](https://app.asana.com/0/0/1215009192158952) — PR #5149 CI ✅ waiting review
|
||||
- [Hide "stop chat" button](https://app.asana.com/0/0/1215009192158954) — PR #5173 CI ✅ waiting review
|
||||
- [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950) — in progress, plan to complete Mon Jun 1
|
||||
- [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — PR #5145 CI 🔴 + scope question open (Alessandro flagged conflict with running tracker-blocker experiment; Costas confirmed iPhone-only). Decision needed before merge.
|
||||
- [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — subtask exists, needs to open during Tue O-N or Wed kickoff slot
|
||||
- Kickoff: Costas (May/25) offered the O-N Weekly slot for Tue Jun 2
|
||||
|
||||
**Why this is TP**: Hard due Jun 5; reviewer sign-off still pending on three PRs (only ✅ are CI reactions, not approvals); Alex is at WWDC Jun 8–12 next week — this MUST close before AFK or the project slips two weeks.
|
||||
|
||||
### Quadrants
|
||||
| Quadrant | This Week | Notes |
|
||||
|---|---|---|
|
||||
| Project | 70% | SR-driven; pre-AFK close-out |
|
||||
| AOR | 10% | Light week — overdue feature flag + pixel cleanups; Monterey-only PR |
|
||||
| Career | 15% | No 1:1 (Dominik OOO Jun 1–5) — bank the time on Project Advisor doc instead |
|
||||
| Strategy | 5% | One assessment/AOR-thread comment |
|
||||
|
||||
Adjustments: Ship Review week → Project pushed to 70% (tradeoff: AOR sprint backlog deferred). Career boosted because no 1:1 means an uninterrupted 30 min Project Advisor block — direct EP3 lever.
|
||||
|
||||
### Shape
|
||||
|
||||
Today is Sunday 2026-05-31 — shape starts Monday.
|
||||
|
||||
**Mon Jun 1:** TP deep work + week setup
|
||||
- [Persist 'You've got this' dialogue](https://app.asana.com/0/0/1215009192158950) — finish implementation
|
||||
- [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) — reply to Alessandro/Costas on experiment-conflict decision; fix CI 🔴 on PR #5145
|
||||
- [O-L Weekly Meeting](https://app.asana.com/0/0/1215106190309457)
|
||||
- Set 1-Must = finish Persist 'You've got this' PR
|
||||
|
||||
**Tue Jun 2:** TP kickoff + Apple Weekly
|
||||
- [iOS project Kick-off](https://app.asana.com/0/0/1214592943696234) — propose at [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364) (Costas offered the slot)
|
||||
- [Apple Weekly Team Meeting](https://app.asana.com/0/0/1215138977402987)
|
||||
- Address review feedback as PRs come back (#5149, #5173)
|
||||
|
||||
**Wed Jun 3:** TP — open Ship Review
|
||||
- [Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961) — open SR, post status + linked PRs, request reviewers
|
||||
- [O-N Weekly Meeting](https://app.asana.com/0/0/1215156632997364)
|
||||
- Career block: 30 min — [Project Advisor Readiness Self-Reflection — Part 1](https://app.asana.com/0/0/1210386994396212)
|
||||
|
||||
**Thu Jun 4:** TP — address SR feedback + AOR clean-up
|
||||
- Merge any approved onboarding PRs
|
||||
- [PR: Monterrey-only](https://app.asana.com/0/0/1215150214975916) — push to merge before WWDC AFK (Diego confirmed Jun 8 = last Big Sur version)
|
||||
- AOR quick wins (see below)
|
||||
|
||||
**Fri Jun 5:** Close the loop + pre-AFK handoff
|
||||
- SR sign-off — chase any pending reviewer
|
||||
- Mark [iOS Address onboarding project](https://app.asana.com/0/0/1214592943696234) complete
|
||||
- Write weekly review
|
||||
- Handoff brief for WWDC AFK Jun 8–12 (note who covers [ON HOLD] demo experiment monitoring)
|
||||
|
||||
**Note: no 1:1 with Dominik this week** — he is OOO Jun 1–5 (LDX3 + Public Holiday). Next likely 1:1 = week of Jun 15 (Alex AFK Jun 8–12 immediately after Dominik's return). Skipping 1:1 prep.
|
||||
|
||||
### Must-Not-Forget
|
||||
|
||||
- [ ] **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
|
||||
due 2026-05-28 (overdue 3d) — Alessandro asked May/29 whether to wait for experiment min-sample-size before flipping Treatment B; this blocks merge. PR #5145 CI is 🔴. Decision + fix needed.
|
||||
|
||||
- [ ] **[Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
|
||||
due 2026-06-01 — committed in May/29 status to land Mon. Protect Monday for this.
|
||||
|
||||
- [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
|
||||
due 2026-05-27 (overdue 4d) — Diego confirmed last Big Sur version ships Jun 8 and Monterey+ merges next week. WWDC week is Alex's AFK → land this Thu Jun 4 or it slips.
|
||||
|
||||
- [ ] **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — assignee: Alex
|
||||
due 2026-05-28 (overdue 3d) — executor PR #4663 is draft + ✅, waiting on Alex to flip to ready and request review.
|
||||
|
||||
- [ ] **[Ship Review: iOS Address onboarding...](https://app.asana.com/0/0/1215009192158961)** — assignee: Alex (subtask of TP)
|
||||
due Jun 5 — only Alex/system stories in thread; reviewer comments are zero. Must open SR no later than Wed so reviewers have 2 days.
|
||||
|
||||
### AOR Quick Wins This Week
|
||||
|
||||
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
|
||||
overdue 2d — Dax bot reminder May/30 + Nastia ping May/26 "do you still need these pixels?" → answer + PR or extend due date.
|
||||
|
||||
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
|
||||
overdue 37d — pair this with the pixel removal above; same feature, single cleanup PR.
|
||||
|
||||
### Sprint Backlog (pick 1–2 if time allows)
|
||||
|
||||
- **[PR Check is failing on main — testWhenTabWithConnectionLostError...](https://app.asana.com/0/0/1213975496167929)**
|
||||
due 2026-04-22 (overdue 39d) — active CI failure on main; quiet since May/13.
|
||||
|
||||
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
|
||||
due 2026-05-15 (overdue 16d) — Apple CI Failing Tests inbox; needs triage.
|
||||
|
||||
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
|
||||
due 2026-05-01 (overdue 30d) — Internal Product Feedback; one-line repro needed.
|
||||
|
||||
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
|
||||
due 2026-05-01 (overdue 30d) — Internal Product Feedback; quick triage candidate.
|
||||
|
||||
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)**
|
||||
due 2026-05-26 (overdue 5d) — 5-min timebox; do during Mon inbox sweep.
|
||||
|
||||
(+ 3 aged items >180 days in backlog — not listed)
|
||||
|
||||
### On Radar
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)** — Elle flagged May/30 that the `site_loading_performance` pixel is no longer sending on macOS. Touches Alex's secondary AOR (crash/pixels). Watch the thread; engage only if a macOS owner is needed.
|
||||
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — Dax bot posted enrollment data May/28 showing no `app_use d5-7` conversions yet. Directly relevant to Treatment B ship decision — monitor this thread as input to MNF #1.
|
||||
|
||||
### Career Action This Week
|
||||
**Selected**: Draft Part 1 of [Project Advisor Readiness Self-Reflection](https://app.asana.com/0/0/1210386994396212) — 30 min, Wed afternoon.
|
||||
|
||||
Why this one:
|
||||
- Project Advisor is the highest-leverage EP3 signal (career-notes #1, status: Not started).
|
||||
- No 1:1 prep needed (Dominik OOO Jun 1–5) → Career time is free.
|
||||
- Primary AOR target discussion (#2) requires a 1:1 to land — defer to week of Jun 15.
|
||||
- Christie calibration follow-up (#4) is overdue but should bundle into the next 1:1.
|
||||
- Assessment visibility comment (#3) covered separately under Strategy quadrant.
|
||||
|
||||
### On Radar / Participation Needed
|
||||
|
||||
- **[AOR: Desktop Browsers Operational Health](https://app.asana.com/0/0/1214175673709906)**
|
||||
Elle (May/30): macOS `site_loading_performance` pixel missing — engage if no other macOS owner picks it up by mid-week.
|
||||
|
||||
### Carried Forward from Last Week
|
||||
|
||||
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)**
|
||||
→ see TP section above
|
||||
|
||||
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — Alex
|
||||
Created by Alessandro on May/29 ("Since you were OOO I created that"). Asynchronous task to coordinate with project advisor while tracker-demo experiment is on hold. Next action: post initial sync comment Mon.
|
||||
|
||||
- **[Dominik :: Alex Regular 1:1 Agenda](https://app.asana.com/0/0/1214933759913756)** — Alex
|
||||
Was due 2026-05-26 (last Tue's 1:1, likely already happened). No new agenda items posted since. Defer all career items to next 1:1 (target week of Jun 15 — Dominik OOO this week, Alex AFK next week).
|
||||
|
||||
- **[Discord GDPR follow-up](https://app.asana.com/0/0/1215193471130270)** — Alex
|
||||
Due Jun 15; just a watch item this week.
|
||||
|
||||
---
|
||||
*Based on DB state as of 2026-05-31 11:12 UTC (sync snapshot); no prior weekly review found on disk — built from snapshot + career-notes + recurring-rhythms. Saved to `plan-2026-05-25.md` per supplied MONDAY_DATE.*
|
||||
Reference in New Issue
Block a user