[2026-05-30] inbox sort: processed 16 notes from family/sort/

New files:
- personal/ideas/life-product-ideas.md (feedback-идеи)

Merged into existing files:
- family/documents/kids-songs.md — added Barto poems list
- family/contacts/service-providers.md — added Айдар + Сергей contacts
- family/documents/recipes-wishlist.md — added настойки section

Deleted (already in vault):
- 10 keep-import files (altai-shopping, altai-house-inventory, car-notes,
  gift-ideas, books-reading-list already had the content)
- кофр-размер, лизе-на-день-рождения, лыжи-размеры, настойки-рецепты
This commit is contained in:
Alexey Martemyanov
2026-05-30 12:54:20 +06:00
parent fa39c07b7a
commit 8a4663f1b2
144 changed files with 608 additions and 2264 deletions
+137
View File
@@ -0,0 +1,137 @@
# Weekly Plan — Week of 2026-05-25
> Generated Sat 2026-05-30. The MonFri (2529) work window is already past; this plan is forward-looking to the upcoming workweek (Jun 15) which carries the active Ship Review through to close-out. No prior weekly-review file exists at `briefs/weekly/2026-05-29.md` — content built directly from the Asana snapshot.
**Top Priority**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — DRI on parent project due Fri 2026-06-05; three sub-PRs already up, "Persist 'You've got this' dialogue" lands Mon, then open Ship Review.
### Quadrants
| Quadrant | This Week | Notes |
|---|---|---|
| Project | 70% | Close-out week for iOS onboarding project: finish Persist dialogue, open Ship Review, address optionals. |
| AOR | 15% | Light — Monterrey-only PR awaiting merge; PR review requests + iOS mentions need triage. |
| Career | 10% | No 1:1 this week (last was 2026-05-26, next ~2026-06-09). Use the gap to draft Project Advisor Readiness Part 1. |
| Strategy | 5% | One substantive comment on an active O-N/O-L Assessment if one is open. |
### Shape
**Mon Jun 1:** TP close-out + standing meeting
- [Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950) — finish PR, ship before EOD (per Alex's May/29 status: "In progress, plan to complete on Mon Next")
- [Hide Free plan • Upgrade in onboarding](https://app.asana.com/0/0/1215009192158952) — PR #5149 already approved, merge
- O-L Weekly Meeting
**Tue Jun 2:** Ship Review opening + Apple Weekly
- [Ship Review: iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1215009192158961) — open it, fill required sections, request reviewers
- Apple Weekly Team Meeting
- Triage GitHub mentions/review requests (Brindy thread on subscription sheet NTP flash, filterAddressBarUpdates removal)
**Wed Jun 3:** Optionals start + O-N Weekly
- [Try Visiting a Site: Background](https://app.asana.com/0/0/1214828145455342) — optional from Ship Review scope (1d)
- O-N Weekly Meeting
- Career Action time-box: Project Advisor Readiness doc Part 1 (30 min)
**Thu Jun 4:** Optionals continue
- [Address Bar Toggle Selection: Animated Assets](https://app.asana.com/0/0/1214627423981798) — due today, 2-3d effort, deprioritise if Ship Review reviewer feedback comes in
**Fri Jun 5:** Close loops + weekly review
- Land remaining Ship Review feedback; mark TP complete or carry to next week
- Write weekly review
- AFK prep: WWDC partly-AFK window starts Mon Jun 8 — flag in-flight items now
### Must-Not-Forget
- [ ] **[Persist 'You've got this' dialogue in non-focused state](https://app.asana.com/0/0/1215009192158950)** — assignee: Alex
due 2026-06-01 — DRI; last in-progress subtask before Ship Review can open. Alex publicly committed to Monday completion.
- [ ] **[Hide "stop chat" button in the input box](https://app.asana.com/0/0/1215009192158954)** — assignee: Alex
due 2026-05-29 (1d overdue) — PR #5173 up, CI green, awaiting reviewer. Ping if no movement by Tue.
- [ ] **[PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)** — assignee: Alex
due 2026-05-27 (3d overdue) — separate from the onboarding project; needs Alex to merge or hand off.
- [ ] **[Follow-up: add support of Inline Text Images to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)** — assignee: Alex
due 2026-05-28 (2d overdue) — macOS Release Board follow-up; small but blocking Ship Review polish.
- [ ] **[Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1214965405681675)** — assignee: Jake Abel
due 2026-05-21 (9d overdue) — gates the [ON HOLD] subtask gid 1213551050320249. Check status with Jake mid-week; do not let it slip past 2026-06-05.
### AOR Quick Wins This Week
- **[Feature flag: warnBeforeQuit](https://app.asana.com/0/0/1212444166689969)**
overdue 36 days — flag removal, modified yesterday so still live; clear in a Wed/Thu gap.
- **[Remove or re-evaluate Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)**
overdue 1 day — pixel cleanup paired with the feature-flag removal above; do them together.
- **[Consider removing or reworking mac_malicious-site-protection_client-timeout](https://app.asana.com/0/0/1210855358441832)**
overdue 311 days — quick_wins section; aged but small. Tag for a Quick Wins block.
### Sprint Backlog (pick 12 if time allows)
- **[PR Check is failing on main — testWhenTabWithConnectionLostErrorActivated...](https://app.asana.com/0/0/1213975496167929)**
due 2026-04-22 (38d overdue) — active section; CI flakiness in main, blocking team.
- **[PR Check is failing on main](https://app.asana.com/0/0/1214797526093576)**
due 2026-05-15 (15d overdue) — second flaky-test entry; pair with above.
- **[Pinned tab opens link in background tab](https://app.asana.com/0/0/1214038885921128)**
due 2026-05-01 (29d overdue) — internal product feedback, macOS bug.
- **[Text selection in the address bar doesn't work as standard](https://app.asana.com/0/0/1214071796247142)**
due 2026-05-01 (29d overdue) — internal product feedback, macOS bug.
- **[Review Overdue Tasks Summary - 22 Tasks (Jan 2026)](https://app.asana.com/0/0/1212881948512860)**
due 2026-01-27 (123d overdue) — meta cleanup task; 30-min triage to close or split.
(+ ~3 aged items >180 days in backlog — not listed individually.)
### On Radar
- **GH mention: [iOS][Tailored Onboarding] Present Final dialog for Duck.ai flow** — sibling work to the TP project; monitor for design changes that affect Persist dialogue.
- **GH mention: Fix subscription sheet NTP flash and activate keyboard for chat-path try-visit dialog** — touches the "Try Visiting a Site" optional; engage if author asks for review.
- **GH mention: [iOS] Remove filterAddressBarUpdates feature flag** — Alex AOR adjacent (feature flags); quick review if requested.
- **GH review requested: Bump nativeStorage rollout to 100%** — privacy-configuration repo; check this is the expected rollout step.
- **[Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015)** — 4d overdue, 5-min timebox. Knock out Mon.
### Career Action This Week
**Draft Part 1 of Project Advisor Readiness doc (30 min, scheduled Wed Jun 3).**
Why this and not the others:
- Project Advisor (#1 priority in career-notes.md) is still status="Not started" — single biggest EP3 signal gap.
- No 1:1 this week → can't pick "1:1 prep" or "add primary AOR target to agenda" items.
- Existing scaffold task: [Readiness Self-Reflection for Potential Project Advisor - Alex M](https://app.asana.com/0/0/1210386994396212) — open it, fill Part 1.
- Christie EP2/3 calibration confirmation deferred to the 2026-06-09 1:1 with Dominik.
### Carried Forward from Last Week
- **[iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234)** — assignee: Alex
→ see TP section above.
- **[Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955)** — assignee: Alex
due 2026-05-28 (2d overdue) — subtask of TP; status per Alex's May/29 comment unclear ("PR up for [hide stop-chat], in progress for [Persist]"). Verify whether this rolls into the Ship Review or needs its own close-out.
- **[ON HOLD] [iOS: Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551050320249)** — assignee: Alex
due 2026-06-05 — explicitly on hold pending Privacy Triage (gid 1214965405681675, Jake Abel). Don't unblock until Privacy Triage closes.
- **[NA Analysis: iOS Duck.ai Onboarding Tracker Demo Experiment](https://app.asana.com/0/0/1215186850972358)** — assignee: Alex
no due date — related to the demo tracker work; revisit once the ON HOLD subtask unblocks.
- **[DRI <> Project Advisor async for Demo tracker blocking after chat in onboarding](https://app.asana.com/0/0/1213551072611261)** — assignee: Alex
no due date — async doc; touch only if Privacy Triage closes mid-week.
- **[Postmortem: Security Triage AI: edit link](https://app.asana.com/0/0/1214996544314187)** — assignee: Alex
no due date — small follow-up from completed postmortem (1214996544314182 closed 2026-05-28). Close out in a Quick Wins block.
- **[Xcode build speedup skill](https://app.asana.com/0/0/1214996544314193)** — assignee: Alex
no due date — meta/tooling task carried over. Park unless surfaced.
### DRI Conflicts / Snapshot Caveats
- Snapshot generated 2026-05-30 06:19 UTC; sync state shows two project streams "never" synced (project:2524544613455, project:11984721910118) — verify those aren't currently-relevant projects.
- DB query for Dominik OOO not run (envdir unavailable on this host). Snapshot shows no Dominik AFK entries in surfaced tasks, but this is not exhaustive. Assume Dominik available unless a future sync surfaces otherwise.
- **AFK reminder**: [Alex M Partly AFK Jun/8-12 (WWDC'26)](https://app.asana.com/0/0/1212684797790491) starts the Monday after this plan ends. Hand off any in-flight Ship Review work before EOD Fri Jun 5.
---
*Based on Asana snapshot 2026-05-30 06:19 UTC. No prior weekly-review file at briefs/weekly/2026-05-29.md; build assumes current DB state.*
Plan saved to `/Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md`.