Files
obsidian-vault/work/briefs/weekly/plan-2026-05-25.md
T
Alexey Martemyanov 8a4663f1b2 [2026-05-30] inbox sort: processed 16 notes from family/sort/
New files:
- personal/ideas/life-product-ideas.md (feedback-идеи)

Merged into existing files:
- family/documents/kids-songs.md — added Barto poems list
- family/contacts/service-providers.md — added Айдар + Сергей contacts
- family/documents/recipes-wishlist.md — added настойки section

Deleted (already in vault):
- 10 keep-import files (altai-shopping, altai-house-inventory, car-notes,
  gift-ideas, books-reading-list already had the content)
- кофр-размер, лизе-на-день-рождения, лыжи-размеры, настойки-рецепты
2026-05-30 12:54:20 +06:00

9.3 KiB
Raw Blame History

Weekly Plan — Week of 2026-05-25

Generated Sat 2026-05-30. The MonFri (2529) work window is already past; this plan is forward-looking to the upcoming workweek (Jun 15) which carries the active Ship Review through to close-out. No prior weekly-review file exists at briefs/weekly/2026-05-29.md — content built directly from the Asana snapshot.

Top Priority: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — DRI on parent project due Fri 2026-06-05; three sub-PRs already up, "Persist 'You've got this' dialogue" lands Mon, then open Ship Review.

Quadrants

Quadrant This Week Notes
Project 70% Close-out week for iOS onboarding project: finish Persist dialogue, open Ship Review, address optionals.
AOR 15% Light — Monterrey-only PR awaiting merge; PR review requests + iOS mentions need triage.
Career 10% No 1:1 this week (last was 2026-05-26, next ~2026-06-09). Use the gap to draft Project Advisor Readiness Part 1.
Strategy 5% One substantive comment on an active O-N/O-L Assessment if one is open.

Shape

Mon Jun 1: TP close-out + standing meeting

Tue Jun 2: Ship Review opening + Apple Weekly

Wed Jun 3: Optionals start + O-N Weekly

  • Try Visiting a Site: Background — optional from Ship Review scope (1d)
  • O-N Weekly Meeting
  • Career Action time-box: Project Advisor Readiness doc Part 1 (30 min)

Thu Jun 4: Optionals continue

Fri Jun 5: Close loops + weekly review

  • Land remaining Ship Review feedback; mark TP complete or carry to next week
  • Write weekly review
  • AFK prep: WWDC partly-AFK window starts Mon Jun 8 — flag in-flight items now

Must-Not-Forget

AOR Quick Wins This Week

Sprint Backlog (pick 12 if time allows)

(+ ~3 aged items >180 days in backlog — not listed individually.)

On Radar

  • GH mention: [iOS][Tailored Onboarding] Present Final dialog for Duck.ai flow — sibling work to the TP project; monitor for design changes that affect Persist dialogue.
  • GH mention: Fix subscription sheet NTP flash and activate keyboard for chat-path try-visit dialog — touches the "Try Visiting a Site" optional; engage if author asks for review.
  • GH mention: [iOS] Remove filterAddressBarUpdates feature flag — Alex AOR adjacent (feature flags); quick review if requested.
  • GH review requested: Bump nativeStorage rollout to 100% — privacy-configuration repo; check this is the expected rollout step.
  • Desktop Browser Feature Owner Survey — 4d overdue, 5-min timebox. Knock out Mon.

Career Action This Week

Draft Part 1 of Project Advisor Readiness doc (30 min, scheduled Wed Jun 3).

Why this and not the others:

  • Project Advisor (#1 priority in career-notes.md) is still status="Not started" — single biggest EP3 signal gap.
  • No 1:1 this week → can't pick "1:1 prep" or "add primary AOR target to agenda" items.
  • Existing scaffold task: Readiness Self-Reflection for Potential Project Advisor - Alex M — open it, fill Part 1.
  • Christie EP2/3 calibration confirmation deferred to the 2026-06-09 1:1 with Dominik.

Carried Forward from Last Week

DRI Conflicts / Snapshot Caveats

  • Snapshot generated 2026-05-30 06:19 UTC; sync state shows two project streams "never" synced (project:2524544613455, project:11984721910118) — verify those aren't currently-relevant projects.
  • DB query for Dominik OOO not run (envdir unavailable on this host). Snapshot shows no Dominik AFK entries in surfaced tasks, but this is not exhaustive. Assume Dominik available unless a future sync surfaces otherwise.
  • AFK reminder: Alex M Partly AFK Jun/8-12 (WWDC'26) starts the Monday after this plan ends. Hand off any in-flight Ship Review work before EOD Fri Jun 5.

Based on Asana snapshot 2026-05-30 06:19 UTC. No prior weekly-review file at briefs/weekly/2026-05-29.md; build assumes current DB state.

Plan saved to /Users/admin/obsidian/work/briefs/weekly/plan-2026-05-25.md.