[2026-05-30] add steam stop/start commands to htpc-system.md

This commit is contained in:
Alexey Martemyanov
2026-05-30 14:22:36 +06:00
parent 40c33a6484
commit 801b6070f3
4 changed files with 257 additions and 14 deletions
+79
View File
@@ -0,0 +1,79 @@
---
## Daily Brief — 2026-05-30 (Saturday)
### ✨ Morning
On this day in 1971, **Mariner 9** launched from Cape Canaveral. It would become the **first spacecraft ever to orbit another planet** — beating two Soviet probes to Mars by mere weeks. Quiet weekend → big history.
🌿 Step outside for 5 minutes before opening anything.
## Plan for Today
Saturday = rest / light triage per weekly plan. Keep it lean — pick **one momentum win** and **one cheap response**, then close the laptop.
1. ⚡ [Desktop Browser Feature Owner Survey](https://app.asana.com/0/0/1214940335721015) — 5-min anonymous timebox, 4d overdue. Click, submit, done.
2. 🔴 [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832) — automated comment posted today (2026-05-30) demands either a PR or a status comment with a new ETA. Cheapest path: post a short comment naming Thu 2026-06-04 as the PR date (matches Thu slot in weekly plan).
3. 🟡 *(Optional, 5 min)* [Windows AOT delivery plan](https://app.asana.com/0/0/1215255758473719) — Ivy confirmed yesterday Alex's plan IS the foundation. One short reply confirming alignment unblocks Mon/Tue.
Anchor: Today's focus per weekly plan = rest + 12 cheap closes. New signals since plan: automated comment on Warn Before Quit (yes, surfaced above). Nothing else urgent enough to break the rest day.
---
### 🔴 Urgent / Overdue
- **OVERDUE [DRI]** — [Warn Before Quit pixels](https://app.asana.com/0/0/1212808567112832)
Context: 1d overdue. Temporary Pixels project posted automated comment today: "please prepare a PR. If you need more time, add a comment and adjust the due date."
Action: post comment — *"Will land PR by Thu Jun 4. Adjusting due date."* — and bump due_on to 2026-06-04.
- **OVERDUE [DRI]** — [Ship AI onboarding winner (Treatment B)](https://app.asana.com/0/0/1215009192158955) / [PR #5145](https://app.asana.com/0/0/1215009192158955)
Context: 2d overdue. PR CI is 🔴 RED — Alex is the current blocker; reviewers can't engage until green.
Action: not for today (Saturday). Park for Mon morning — fix CI before requesting re-review.
- **OVERDUE [DRI]** — [PR: Make our macOS app Monterrey-only](https://app.asana.com/0/0/1215150214975916)
Context: 3d overdue. Diego flagged 2026-05-30 that first Monterey+ release ships Jun 15 — must merge well before that.
Action: not for today. Scheduled for Tue Jun 2 in weekly plan.
- **OVERDUE [DRI]** — [Follow-up: add Inline Text Images support to TypingTextAnimation](https://app.asana.com/0/0/1214040804696193)
Context: 2d overdue. Small follow-up from a recently shipped feature.
Action: not for today. Park for a gap day next week.
**Backlog cluster** (do_later / quick_wins / hack_days with stale dates — informational only, not urgent):
Feature flag `warnBeforeQuit` (36d, pairs naturally with the Warn-Before-Quit PR — batch), CI-failing-tests pair (15d + 38d), Internal Product Feedback bugs (29d each), Review Overdue Tasks Summary (123d). None for Saturday — handled in next week's AOR window.
### 🟠 Needs Action Today
**Ship Reviews (DRI)**
- [Ship Review: iOS Address onboarding](https://app.asana.com/0/0/1215009192158961) — still unowned. Per weekly plan, Alex opens this on **Wed Jun 3**, not today. No action Saturday.
**PR Reviews**
- 6 review requests queued (`[macOS] value transformer failure observability`, `[macOS] force unwrap crash on debugDescription`, `nativeStorage rollout 100%`, `ad blocking soft launch`, `Fix maestro tests`, `iPad toggle for iOS 7.211`). Batch on a gap day next week — full list in `asana_context.md`. Not for Saturday.
**Tech Designs / PFRs / Incidents**
- None requiring Alex's response today.
### 🟡 Delegated — Follow Up Needed
- **OVERDUE [DELEGATED]** — [Privacy Triage: Apple - iOS Demo tracker blocking after chat](https://app.asana.com/0/0/1214965405681675)
Assignee: Jake Abel. Due 2026-05-21 (9d overdue), no activity since 2026-05-20.
Action: not for Saturday — nudge Jake on Mon: *"Hi Jake — any blocker on the privacy triage? Happy to jump on a quick call if it helps."*
- **STALE [DELEGATED]** — [PR: C-S-S Fix site copy/cut/paste/text selection restrictions](https://app.asana.com/0/0/1207521936429896)
74d stale, no GitHub match found in correlation check.
Action: not for Saturday — on Mon decide whether to close or reassign.
- **MAINTENANCE ROTATION** — multiple subtasks (1215057989642795, 1215057989642802, 1215057989642808, 1215059118004301, 1215059118004308) due 2026-05-29, unassigned in DB.
Action: not for Saturday — these are auto-generated weekly maintenance items; verify on Mon whether they were claimed in Asana but not yet synced.
_No "PR merged but Asana task open" rows in the delegated-PR correlation snapshot — nothing to close today._
### 🔵 Rhythms
**TP**: [iOS Address onboarding conflicts with unified input and ship AI onboarding winner](https://app.asana.com/0/0/1214592943696234) — TP set ~5d ago, umbrella due Fri Jun 5. Not stale. Next TP Thread check: TP not yet close to completion (Ship Review still unopened, Persist dialogue still in-progress), so no Next TP Thread needed yet.
**Active Rotations**: none active; none starting/ending within 3 days.
**Upcoming this week** (context only — no action today):
- **Dominik OOO all week (Jun 15)** → no 1:1, no 1:1 prep. Next 1:1 likely Jun 9+.
- **Career action** scheduled for Fri Jun 5: draft Part 1 of Advisor Readiness doc (30 min). Top-leverage EP3 item per career-notes.
- Standing meetings this week: O-L Mon, Apple Weekly Tue, O-N Wed.
---
*Saturday rest day — two clicks (Survey + Warn-Before-Quit comment) and an optional reply to Ivy are the entire ask. Everything else is pre-positioned for next week per the plan.*