DuckDuckGo Asana Workflow

Alex's Identity

  • Assignee GID: 1202406491309495
  • Role: macOS Browser Developer at DuckDuckGo
  • Career advisor: Dominik

Task Sources in DB

source Meaning Eagle's default role
my_tasks Assigned to Alex DRI — drives to completion
delegated Created by Alex, assigned to others Delegator — tracks progress
following Alex is a follower/CC Observer — no action unless asked
project In a shared project Alex follows Context only

Task Type Classification

Ship Review — name contains "Ship Review:" or is in "Ship Reviews" project

  • Alex as assignee → DRI (drives all AOR approvals)
  • Alex as named reviewer → AOR Reviewer (provide feedback, signal done)

Tech Design — name contains "Tech Design:", "TD:", or "Design Doc:"

  • Alex as assignee/author → address feedback, drive to approval
  • Alex as reviewer → review, comment, approve/iterate

PFR (Product Feedback Request) — name starts "PFR:"

  • 3-day implicit deadline. Requestor summarizes decision after window closes.

Rotation — name contains "Maintenance Rotation", "Triage Rotation", "Release DRI", "PFM DRI"

  • Has date range + structured checklist

Status Labels

NEEDS ACTION | WAITING | BLOCKED | STALLED | ON TRACK | OVERDUE | MONITORING

Priority order in brief: OVERDUE → NEEDS ACTION → BLOCKED → STALLED → WAITING → MONITORING

Weekly Rhythms

  • TP (Top Priority): one task per week, set Monday. Tier 1 = primary. Stale if not changed >2 weeks.
  • 1-Must: one task per day, set each morning. Should be achievable today.
  • 1:1 with Dominik: weekly. Prep agenda in advance.
  • Quick Wins Days: periodic WedFri sprints. Shift from project deep-work to clearing backlog.
  • Rotation: active if assigned "Maintenance Rotation" or similar. Handoff notes due Friday.

Key Rules

  • Silence ≠ approval. Never assume a task is done without explicit confirmation.
  • "No action needed" on a DRI task requires proof (all approvals collected).
  • If someone addressed your feedback and re-requested review → you are the blocker. NEEDS ACTION.
  • Stale TP (>2 weeks unchanged) → surface it.
  • Performance review deadline within 3 days → HIGH PRIORITY.
  • Major incident with no postmortem >3 days after resolution → OVERDUE, critical.

Asana MCP Usage Rules

Use Asana MCP only in two cases:

  1. Task GID is referenced but missing from DB → asana_get_task
  2. Stories in DB are incomplete/stale → asana_get_stories_for_task

Never bulk-query Asana live. Never use MCP to scan projects — that's sync.js's job.