4.4 KiB
Daily Brief — 2026-05-30 (Saturday)
✨ Morning
On this day in 1971, Mariner 9 launched and became the first spacecraft ever to orbit another planet — it slipped into Mars orbit ahead of two Soviet probes that had launched after it. First to leave, last to launch, first to arrive. 🚶 Take a short walk before opening Slack.
Today's anchor: Weekly plan says Saturday = light/inbox, no deep work. One optional action (merge PR #5149). New signals since yesterday: 12 task touches, 2 new comments (1 automated reminder on Warn-Before-Quit pixels, 1 self-status from Alex on the TP). Yesterday's 1-Must was completed at 16:31.
Plan for Today
- ⚡ Merge PR #5149 — Hide Free Plan + Upgrade pills → already approved, ✅ CI. ~5 min. Closes Hide Free plan • Upgrade [0.5d].
- (That's it for today — everything else is Mon work per weekly plan.)
🔴 Urgent / Overdue
Listed for situational awareness — per weekly plan these are Mon (Jun 1) actions, not today.
-
[OVERDUE] [DRI] — PR: Make our macOS app Monterrey-only - 1-3d — due May 27 (3d overdue) Context: Diego announced "first Monterey+ version merges next week" — Alex's review or push-back is on the critical path. Action (Mon): Review the PR, or post push-back if scope is wrong.
-
[OVERDUE] [AUTHOR] — Follow-up: Inline Text Images on TypingTextAnimation — due May 28 (2d overdue) Context: Draft PR #4663 is up with ✅ CI. Action (Mon): Un-draft, request reviewers.
-
[OVERDUE] [DRI] — Ship AI onboarding winner (Treatment B) — due May 28 (2d overdue) Context: PR #5145 has 🔴 CI. Action (Tue per plan): Fix CI, push.
-
[OVERDUE] [DRI] — Desktop Browser Feature Owner Survey — due May 26 (4d overdue) Context: 5-min anonymous survey, trivial to clear. Action (Mon): Fill it in.
-
Backlog cluster (do_later / quick_wins with stale dates — informational only) Warn-Before-Quit pixels (1d overdue, automated reminder fired today 07:14 — "please prepare a PR") + warnBeforeQuit feature flag (37d overdue) pair together as the Thu Jun 4 quick-win slot. Aged items below 180d in sprint backlog (Tab preview 410d, Duo Grafana 311d, Pixel Anomaly 255d, etc.) remain parked.
🟠 Needs Action Today
Project (TP)
- Merge PR #5149 — see Plan item 1.
PR Reviews
- 6 review requests + 5 mentions queued in GitHub Needs Attention. Batch on Mon after TP block — not today.
Ship Reviews / Tech Designs / PFRs / Incidents
- None requiring Alex action today. Ship Review subtask for iOS Address onboarding has no comments yet (only auto-creation system stories) — opening it is a Tue/Wed item.
🟡 Delegated — Follow Up Needed
- [STALE — 74d no activity] — PR: C-S-S Fix site copy/cut/paste/text selection restrictions — no assignee in DB, no matching GitHub PR found. Suggested follow-up (Mon): "Hey — is this still active? No GitHub PR I can find against the task. Want to close or reassign?"
No "merged but not closed" Asana rows from GitHub correlation today. ✅
🔵 Rhythms
TP: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — modified 2026-05-29, fresh. Status comment from Fri 13:02 posted. Not stale. Next TP Thread check: TP is not yet close to completion (Persist dialogue in progress, Ship Review not opened) — defer thread until Ship Review goes out.
Upcoming this week (prep / awareness only):
- 1:1 with Dominik cancelled (Dominik OOO Jun 1-5) — no agenda prep needed; next likely Jun 15 (Alex AFK Jun 8-12).
- Ship Review must open by Fri Jun 5 or it slips two weeks (Alex AFK Jun 8-12 for WWDC). Already shaped into Tue/Wed of the plan.
- WWDC AFK Jun 8-12 starts in 9 days — Fri Jun 5 handoff comment needed (who covers reviewer questions / hotfix triage).