Files
obsidian-vault/work/briefs/daily/2026-05-30.md
T

6.8 KiB
Raw Blame History


Daily Brief — 2026-05-30 (Saturday)

Morning

On May 30, 1971, NASA launched Mariner 9 toward Mars. It became the first spacecraft ever to orbit another planet — beating two Soviet probes that arrived weeks later, both of which crashed. A quiet, durable win. 🚶 Take a short walk before diving in.

Today's focus per weekly plan: weekend — no scheduled work; the plan week is Jun 15. New signals since yesterday: 4 task changes, 4 new comments (Costas + Alessandro raised real questions on Treatment B that need Alex's position before Tue Apple Weekly).

Plan for Today

  1. Clear the 5-min Desktop Browser Feature Owner Survey — 4d overdue, anonymous, capped at 5 minutes. Easiest possible momentum starter.
  2. 🟠 Draft a response on Ship AI onboarding winner (Treatment B) addressing Alessandro's "ship mid-experiment vs wait for sample size" question and Costas's "iPhone-only + iPad spin-up at O-N" question. Even a "leaning toward option X, let's confirm Tue" is enough — locks in your position before Apple Weekly.
  3. 🟢 (Optional, low-pressure) Start implementation on Persist 'You've got this' dialogue — TP sub-task due Mon. Getting it moving today removes Monday pressure.
  4. 🟢 (Optional) Review PR: macOS Monterrey-only — 3d overdue, ~30 min, your AOR.

It's Saturday. Item 1 is the only non-negotiable. Items 24 are "if you want to chip in." Don't force a full work day.


🔴 Urgent / Overdue

  • OVERDUE [DRI] — Ship AI onboarding winner (Treatment B) [0.5d] — due 2026-05-28 (2d). Context: Two open questions posted May 29 by Costas (iPhone-only, iPad spin-up to be raised at Wed O-N) and Alessandro (mid-experiment ship may compromise tracker-blocker data). Alex posted a status comment on the parent but hasn't responded to either reviewer thread on this sub-task. Alex is the current blocker. Action: Post on this task: "Leaning toward [option A/B] — let's lock at Tue Apple Weekly. iPad-specific scoping: agree to raise at Wed O-N." Don't wait for Monday — async response sets the meetings up.

  • OVERDUE [REVIEWER] — PR: Make our macOS app Monterrey-only — due 2026-05-27 (3d). Context: Diego's Monterrey-only PR is in your AOR; merges next week per his Big Sur post. ~30 min review. Action: Open the PR, review, comment or approve.

  • OVERDUE [DRI] — Desktop Browser Feature Owner Survey — due 2026-05-26 (4d). Context: Anonymous, 5-minute timebox. Action: Open it, fill it, close it.

  • OVERDUE [DRI] — Follow-up: Inline Text Images to TypingTextAnimation — due 2026-05-28 (2d). Context: Onboarding follow-up; related to TP code path. PR #4663 ([executor] Add inline image support) is up as draft, CI , awaiting review. Action: Take the executor draft out of draft if implementation is complete, or close out the task if PR is sufficient.

Backlog cluster (informational, not urgent): 8 aged inbox/planning items totaling 410d / 311d / 255d / 123d / 38d / 29d / 29d / 15d overdue — Tab preview stuck, Duo Grafana, Pixel Anomaly, Overdue Tasks Summary (Jan), two PR Check failing tests, Pinned tab bug, Text selection bug. Captured in weekly plan's Sprint Backlog; pick 12 only if a gap day opens up next week.

🟠 Needs Action Today

Ship Reviews (DRI) — TP umbrella iOS Address onboarding conflicts

PR Reviews (Reviewer) — 6 review requests queued on GitHub (privacy-configuration × 3, apple-browsers × 3) + 5 mentions. Batch after the Treatment B response. Full list in asana_context.md → "GitHub — Needs Attention". No single PR is overdue-blocker-tagged at Alex.

Tech Designs / PFRs / Incidents: nothing actionable today.

🟡 Delegated — Follow Up Needed

No "merged-but-not-closed" matches today (all delegated PR rows clean except the stale one above).

🔵 Rhythms

TP: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — last modified 2026-05-29 14:08. Fresh, on track, well within the 2-week staleness window. Not close to completion (Persist dialogue still to land, SR not yet opened) → Next TP Thread check skipped.

Upcoming this week (Jun 15):

  • Mon Jun 1: O-L Weekly Meeting. TP sub-task Persist dialogue due — push PR end-of-day.
  • Tue Jun 2: Apple Weekly Team Meeting — agenda item ready: "Treatment B timing — ship mid-experiment vs wait for sample size (Alessandro's question)." Also: open the Ship Review.
  • Wed Jun 3: O-N Weekly — propose iPad-specific project spin-up (per Costas).
  • Thu Jun 4: Sauna day 🧖. Also SR feedback turnaround + Inline Text Images follow-up.
  • Fri Jun 5: TP parent due. Close out if SR signed off. Career action: draft Part 1 of Project Advisor Readiness Self-Reflection (30 min).
  • No 1:1 with Dominik this week — he's OOO Jun 15 (LDX3 + Public Holiday). Reallocate that 1:1 slot to the Project Advisor doc draft.

No active rotation. No AFK starting within 7d (WWDC starts Jun 8, just outside the window).