Files
obsidian-vault/work/briefs/weekly/plan-2026-05-18.md
T

10 KiB
Raw Blame History

Weekly Plan — Week of 2026-05-18 (forward-looking: 2026-05-25 → 2026-05-29)

Note: Generated Sat 2026-05-23. The week of May 18 has already wrapped (Friday review = 2026-05-22). No weekly-review file exists at briefs/weekly/2026-05-22.md — plan built from DB snapshot only. Forward-looking content targets the upcoming work week (May 25 → May 29). AFK Wed May 27.

Top Priority: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — confirmed by Alex's own comment on the TP-Threads task (2026-05-22): closing out the demo-tracker TP and starting Address onboarding as next O-N TP. Due 2026-06-05; in top_priority; subtasks already scoped for asset/UI work.

Quadrants

Quadrant This Week Notes
Project 65% New O-N TP kickoff + closing demo-tracker PR; shortened week (AFK Wed) bumps from 60%
AOR 15% UTI issues, CI failing tests, PR review backlog. Trimmed because week is 4 days
Career 15% 1:1 with Dominik Tue May 26 — Dominik NOT OOO (next AFK June 13). Boost vs baseline because 1:1 falls this week
Strategy 5% O-N/O-L weekly, Apple Weekly. TD: Monthly pixels (Jonathan) — observe only

Shape

Sat 2026-05-23 / Sun 2026-05-24: Off — weekend.

Mon 2026-05-25: Close out, kick off

Tue 2026-05-26: 1:1 + meetings, light Project work

Wed 2026-05-27: 🏖️ AFK (holiday — Alex M AFK May/27)

  • No work scheduled

Thu 2026-05-28: Deep work on TP subtasks

Fri 2026-05-29: Close loops + maintenance handoff

  • Continue Address Toggle assets
  • Weekly review (write it — last week's was missed)
  • Handoff macOS App Maintenance to Tom (already assigned via May 29 cycle)
  • Pre-1:1-next-cycle agenda items: add anything that surfaced

Must-Not-Forget

  • PR: iOS: Demo tracker blocking after chat in onboarding — assignee: Alex due 2026-05-26 — Alessandro asked on 2026-05-22 whether the toggle should remain hidden until onboarding completes; Alex committed publicly to "review pass on Monday and assign to [reviewer]" — Alex IS the blocker

  • iOS Address onboarding kickoff — async confirmation — assignee: Alex awaiting Dominik's reply on Alex's May 22 "kick-off slots taken — can we run async?" question — if no reply by Mon, ping Dominik so kickoff isn't delayed

  • PR Check is failing on main — assignee: Alex due 2026-05-15 (8d overdue) — main-branch CI failure in active is a P1-style signal; not yet addressed. Diagnose Monday morning before deep work blocks

  • Full Analysis — assignee: Alex due 2026-05-22 (1d overdue) — title alone is ambiguous (no project, no notes context surfaced in snapshot); open task and either action or re-scope. Surfacing because of recent due date

  • Privacy Triage: Apple — iOS: Demo tracker blocking after chat in onboarding — assignee: Jake Abel delegated; due 2026-05-21 (2d overdue) — directly blocks closing TP. Nudge Jake on Monday if not done

AOR Quick Wins This Week

Sprint Backlog (pick 12 if time allows)

(+ 2 aged items >180 days in backlog — not listed: Bug: Tab preview stuck around (403d), Duo login Grafana (304d))

On Radar

Career Action This Week

Add career discussion points to Dominik :: Alex Regular 1:1 Agenda before Tue 2026-05-26 (15 min)

Picked because 1:1 IS this week and Dominik is NOT OOO (verified — next AFK is 2026-06-01). Skipped Project-Advisor doc draft because the 1:1 is the time-bounded action; raise Project Advisor as the primary agenda item in the 1:1 instead — same content, better leverage. Skipped Christie EP2/3 calibration ping — surface as a 1:1 question to Dominik first ("did Christie submit?"), then act if needed. Skipped Assessment comment item — no current open O-N/O-L Assessment requires it this week.

Specific 1:1 agenda items to add:

  1. Project Advisor — "I've made no progress; want to commit to Part 1 of the Readiness doc this cycle. Sanity-check what 'good' looks like."
  2. Primary AOR target — "Which AOR is realistic to pursue as primary by next review?"
  3. Christie EP2/3 calibration — "Did she submit? Status unclear in my notes."
  4. EP3 gap check — "Beyond what we discussed in Feb, what's the next gap to close?"

On Radar / Participation Needed

Carried Forward from Last Week


Based on DB snapshot 2026-05-23 04:23 UTC + agent rhythms. Weekly-review for 2026-05-22 not found on disk — plan built from DB only. DRI conflict check: none flagged. Career advisor (Dominik) OOO check: clear through 2026-05-31. Quick Wins week: not announced.

Saved to /Users/admin/obsidian/work/briefs/weekly/plan-2026-05-18.md.