New files: - personal/ideas/life-product-ideas.md (feedback-идеи) Merged into existing files: - family/documents/kids-songs.md — added Barto poems list - family/contacts/service-providers.md — added Айдар + Сергей contacts - family/documents/recipes-wishlist.md — added настойки section Deleted (already in vault): - 10 keep-import files (altai-shopping, altai-house-inventory, car-notes, gift-ideas, books-reading-list already had the content) - кофр-размер, лизе-на-день-рождения, лыжи-размеры, настойки-рецепты
6.1 KiB
Daily Brief — 2026-05-30 (Saturday)
✨ Morning
On this day in 1908, Mel Blanc was born — the "Man of a Thousand Voices" who gave us Bugs Bunny, Daffy Duck, Porky Pig, Tweety, and roughly half of Looney Tunes. He was reportedly allergic to carrots. He ate them anyway, on tape, for forty years. 🚶 It's the weekend — take a real walk outside before opening anything with a screen.
Today's focus per weekly plan: rest day — work window for week of May 25 closed Friday. Next workweek (Jun 1–5) opens Mon with TP close-out. New signals since sync: 1 new comment (Alex's own Fri status), 11 task changes (mostly Fri completions).
Plan for Today
- ⚡ Desktop Browser Feature Owner Survey — 5-min anonymous timebox, 4d overdue, can be knocked out from phone. Only do it if you're at a keyboard anyway. Otherwise let it slide to Mon.
- 🛑 Everything else is for Mon Jun 1. The TP subtasks (Persist dialogue, Hide stop-chat, Hide Free Plan) are paused over the weekend by design — PRs are up, reviewers are off, no action you can take today moves them.
🔴 Urgent / Overdue
All items below are TP-aligned and slot into Mon Jun 1's plan — surfaced here so the Mon-morning sync isn't surprising. Nothing requires action today.
-
[NEEDS ACTION] [DRI] — Persist 'You've got this' dialogue in non-focused state (due Mon Jun 1) Context: Last in-progress TP subtask; Alex publicly committed to Mon completion in his May/29 status comment. Action (Mon): finish PR, ship before EOD.
-
[NEEDS ACTION] [DRI] — Hide "stop chat" button in the input box (1d overdue, was due Fri) Context: PR #5173 up, CI green ✅, awaiting reviewer. Action (Mon): if no reviewer movement by Tue, ping in PR thread.
-
[NEEDS ACTION] [DRI] — Hide Free plan • Upgrade in onboarding (2d overdue) Context: PR #5149 approved ✅ ready to merge. Action (Mon): merge first thing.
-
[NEEDS ACTION] [DRI] — Ship AI onboarding winner (Treatment B) (2d overdue) Context: Parent task — ships when the three subtasks above land. No independent action. Action: close out automatically once subtasks merge Mon.
-
[NEEDS ACTION] [DRI] — PR: Make our macOS app Monterrey-only (3d overdue, AOR — separate from TP) Context: Standalone macOS AOR PR awaiting merge/handoff. Action (Mon/Tue gap): merge or hand off, don't let it slip further.
-
[NEEDS ACTION] [DRI] — Follow-up: add support of Inline Text Images to TypingTextAnimation (2d overdue) Context: macOS Release Board follow-up — PR #4663 in draft state. Small but blocking Ship Review polish. Action (Tue/Wed gap): finish the draft PR or descope.
Backlog cluster (informational, not urgent): planning/inbox items aged ≥3 months — "Review Overdue Tasks Summary (Jan 2026)" (1212881948512860), "Assertion Failure Pixel Anomaly" (1211379705725021, Sep 2025), "Bug: Tab preview stuck" (1208347387296425, Apr 2025), "Duo login to Grafana" (1210861740617086, Jul 2025), "PR Check failing on main" pair (1213975496167929 / 1214797526093576). Plus all do_later + quick_wins entries with stale dates. Triage in a Quick Wins block in Jun 1–5 week if there's a gap, otherwise carry. Do not promote individually.
🟠 Needs Action Today
None. It's Saturday and your active items are reviewer-blocked or PR-merge-on-Mon.
Mon Jun 1 horizon (for tomorrow-morning context, not today's action):
- PR Reviews: 6 review requests queued in GitHub (nativeStorage rollout, ad-blocking soft-launch, value transformer observability, force-unwrap crash fix, maestro tests, iPad toggle 7.211). Batch in a single review block Mon after TP merges land.
- Ship Review: open Ship Review: iOS Address onboarding on Tue Jun 2 per plan — once all three sub-PRs are merged.
🟡 Delegated — Follow Up Needed
-
[OVERDUE] Privacy Triage: Apple - iOS: Demo tracker blocking after chat in onboarding — Jake Abel, due 2026-05-21, 9d overdue. Gates the [ON HOLD] subtask (1213551050320249) on the TP. Suggested message Mon: "Hi Jake — privacy triage on the demo tracker work hit its due date last week. Anything you need from me to unblock? It's gating an ON-HOLD subtask we'd like to free up before WWDC AFK starts Jun 8."
-
[STALE] PR: C-S-S Fix site copy/cut/paste/text selection restrictions for password/input fields — 74d no activity, no GitHub PR matched against the title. Suggested action: check if the underlying PR was abandoned or renamed — if abandoned, close the Asana task; if active, ping assignee. Not urgent — fit into a Quick Wins block.
No GitHub merged-but-not-closed correlations flagged this run.
🔵 Rhythms
TP: iOS Address onboarding conflicts with unified input and ship AI onboarding winner — set as TP for this cycle, fresh (not stale). Due Fri 2026-06-05. Three sub-PRs in flight; Ship Review opens Tue Jun 2.
Next TP Thread: skip — TP not yet close to completion (Ship Review not opened, PRs not all merged).
Active Rotations: none.
Upcoming this week (Jun 1–5):
- Mon Jun 1: O-L Weekly Meeting; ship Persist dialogue PR; merge Hide Free Plan.
- Tue Jun 2: Apple Weekly Team Meeting; open Ship Review.
- Wed Jun 3: O-N Weekly Meeting; Career action block — Project Advisor Readiness doc Part 1 (30 min, scheduled).
- No 1:1 with Dominik this week — next is ~Jun 9 (Tue). Start collecting agenda items in Dominik :: Alex as they come up.
- AFK heads-up: Alex M Partly AFK Jun/8–12 (WWDC'26) starts the Mon after the upcoming workweek. Land or hand off all Ship Review feedback by EOD Fri Jun 5.